• 제목/요약/키워드: 작업 분할

Search Result 885, Processing Time 0.028 seconds

Improvement of Construction Process management dividing the work area reasonably in Building Construction (작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선)

  • Yoon You-Sang;Joung Young-Kwon;Suh Sang-Wook;Shin Dong-Woo;Kim Chang-Duk;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.59-65
    • /
    • 2003
  • The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.

A Co-Allocation Algorithm for a Multi-Cluster System (다중 클러스터 시스템을 위한 Co-Allcation 알고리즘)

  • 권석면;김진석
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2004.04a
    • /
    • pp.70-72
    • /
    • 2004
  • 본 논문에서는 Grid 시스템에서 작업을 할당하기 위해서, 가능한 모든 작업 분할 방법을 찾는 기법에 대해 연구 하고자 한다. 즉 다수의 노드를 가진 여러 클러스터 사이에 많은 노드를 필요로 하는 작업을 할당하기 위해 변형된 깊이 우선 탐색 트리를 사용하여 작업 분할 리스트를 찾는 방법을 만들고, 그 알고리즘의 속도 및 효율을 평가하였다. 제안된 알고리즘은 전체 리스트를 검색하는 방법에 비해 속도 측면에서 빠른 효율을 보이는 것을 알 수 있다. 따라서 제안된 알고리즘은 동기화된 작업의 스케쥴링에 사용할 경우 유용할 것으로 생각된다.

  • PDF

2인 들기 작업시 신장 및 근력 차이에 따른 작업 능력 평가

  • 이관석;이준한;고휘정
    • Proceedings of the ESK Conference
    • /
    • 1997.10a
    • /
    • pp.31-34
    • /
    • 1997
  • 본 연구에서는 들기 작업 중 특히 2인이 행하는 들기 과업시 신장과 근력의 차이가 작 업 능력에 어떠한 영향을 미치는가를 실험을 통해 심리육체적(Physchophysical approach)/ 생리학적(Physiological approach)으로 분석하였다. 실험은 건설 현장 작업의 Form 들기 작업을 시뮬레이션하였다. 남자 대학생 14명을 대상으로 2인 작업팀을 신장/근력 차이가 있는 팀과 비슷 한 신장/근력 팀으로 설정된 기준에 따라 나누었고 20분간 심리육체적인 실험을 통해 이 두 그룹간 의 최대 허용 하중 (Maximum Acceptable Weight of Load, MAWL)과 생리적인 부하(Load)의 차이를 측정하였다. 생리적 부하는 K4를 신장과 관계없이 근력이 약한 피실험자에게 착용케하여 심박수와 에너지 소비량을 산출하여 두 그룹을 비교하였다. 실험 결과 최대 허용하중의 경우 다른 신장/근력 팀에 분당 2회의 빈도의 경우 각각 16.2kg, 14.0kg, 분당 4회의 경우 각각 12.6kg, 10.6kg으로 비슷 한 신장/근력 팀의 경우가 다른 신장/근력 팀의 경우보다 높은 최대 허용 하중을 보였고, 에너지 소 비량은 다른 신장/근력 팀과 비슷한 신장/근력 팀에 대해 분당 2회의 경우 각각 6.01 kal/분, 5.82 Kal/분, 분당 4회의 경우 각각 7.81 kal/분, 7.43 kal/분, 심박수는 분당 2회의 경우 98.62(회/분), 94.60(회/분), 분당 4회의 경우 122.00(회/분), 117.43(회/분), 으로 다른 신장/근력 팀의 경우가 비슷한 신장/근력 팀의 경우보다 높은 에너지 소비량과 심박수를 보였다.

  • PDF

A Study on the Design of Task Planning System for Intelligent Excavating System (IES) (지능형 굴삭을 위한 토공작업계획 시스템의 구조 설계)

  • Lee, Won-Sik;Song, Soon-Ho;Lee, Seung-Soo;Seo, Jong-Won;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.921-924
    • /
    • 2007
  • 토목, 건축과 관련된 노동현장은 여느 3D 업종들과 마찬가지로 숙련된 기능공의 부재 및 산업재해 발생으로 인해 어려움을 겪고 있으며 이를 극복하기 위한 노력을 계속하고 있다. 대표적인 토목공사인 토공 작업 역시 위험 혹은 유해한 작업환경으로 인해 토공장비의 안전사고 및 생산성과 품질저하가 발생하며 이를 방지하기 위한 장비의 지능화가 절실하게 요구되고 있다. 이를 위해 최근 지능형 굴삭 시스템 개발을 위한 연구가 진행되고 있으며, 토공작업은 일반적으로 광범위한 작업영역을 가지기 때문에 지능형 굴삭시스템의 개발을 위해서는 효율적인 작업을 수행할 수 있도록 하는 작업계획의 수립이 매우 중요하다. 본 연구에서는 작업계획의 대상을 굴삭로봇과 토사로 구분하였으며, 글로벌 영역에서 단위작업 영역, 로컬 영역으로의 분할을 통해 전체 작업 진행에 대해 효율적으로 작업계획을 수립할 수 있도록 구성하여 계획단계에서부터 토공작업 자동화 및 효율와에 기여하고자한다. 토공작업계획 시스템은 토공 작업자 및 감독자의 작업 특성 및 노하우를 컴퓨터, 즉 두뇌에 부여함으로써 숙련된 장비조종자의 작업 방법 및 특성을 반영하여 토공 작업 프로세스 모델링을 구축하고 실제 작업환경상의 센서에 의해 측정된 데이터를 실제 작업환경과 동일하게 모델링된 컴퓨터내의 가상환경을 바탕으로 영역분할, 최적 플랫폼 위치선정 및 작업 순차생성을 통해 최적의 토공작업계획을 수립할 수 있도록 한다.

  • PDF

An Efficient Segmentation System for Cell Images By Classifying Distributions of Histogram (히스토그램 분포 분류를 통한 효율적인 세포 이미지 분할 시스템)

  • Cho, Migyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.2
    • /
    • pp.431-436
    • /
    • 2014
  • Cell segmentation which extracts cell objects from background is one of basic works in bio-imaging which analyze cell images acquired from live cells in cell culture. In the case of clear images, they have a bi-modal histogram distribution and segmentation of them can easily be performed by global threshold algorithm such as Otsu algorithm. But In the case of degraded images, it is difficult to get exact segmentation results. In this paper, we developed a cell segmentation system that it classify input images by the type of their histogram distribution and then apply a proper segmentation algorithm. If it has a bi-modal distribution, a global threshold algorithm is applied for segmentation. Otherwise it has a uni-modal distribution, our algorithm is performed. By experimentation, our system gave exact segmentation results for uni-modal cell images as well as bi-modal cell images.

A Case Study on Work Breakdown Structure(WBS) in Constructing the integrated computing environment of the e-Government (전자정부의 통합전산환경 구축을 위한 작업분할구조(WBS)의 사례연구)

  • Park, Jae-Won;Kim, Don-Gyu;Choi, Jae-Hyun;Lee, Nam-Yong
    • The Journal of Society for e-Business Studies
    • /
    • v.12 no.2
    • /
    • pp.31-45
    • /
    • 2007
  • Over the past decades, there have been numerous studies for approaches to build and operate electronic government systems. Among those studies, work breakdown structure(WBS) has been gained attention increasingly. As a general system engineering techniques. WBS is a kind of methods to engineer and manage electronic government systems effectively. WBS is to organizes tasks and data items for management and engineering for electronic government systems. In this paper, the authors proposed a conceptual WBS model for management and engineering electronic government systems. Also, the authors conducted a case study based on the conceptual WBS model. The results of this study provide useful insights and guidelines for applying the WBS to management and engineering for electronic government systems. The authors believed that the conceptual WBS models will be widely used to management and engineering an electronic government systems.

  • PDF

A Multilevel Workflow Graph Partitioning Scheme for Efficient Placement of Workflow Tasks (워크플로우 작업의 효율적인 배치를 위한 다단계 워크플로우 그래프 분할 기법)

  • 최경훈;손진현;김명호
    • Journal of KIISE:Databases
    • /
    • v.30 no.3
    • /
    • pp.310-319
    • /
    • 2003
  • Workflow is defined as the automation of a business process, and consists of interrelated workflow tasks. Because many modem business processes nay involve activities that are geographically distributed between different departments or organizations, workflow inherently has the characteristics of distribution. In distributed workflow systems, each workflow task performs its assigned role by utilizing information resources placed at some hosts, and then transmits workflow execution control to the next tasks in a workflow definition. Hence, it is very important to appropriately allocate workflow tasks to hosts for high performance workflow processing. In this paper, we propose a multilevel workflow graph partitioning scheme for efficient placement of workflow tasks. This method can improve the performance of workflow processing by minimizing the remote communication costs occurred during workflow execution.

Multi-Job Scheduling for Minimum Makespan of Decomposed Job based on Integrated Computing Resources (통합된 컴퓨팅 자원기반 분할된 작업의 총소요시간 최소화를 위한 다중 작업 스케줄링)

  • Han, Seok-Hyeon;Yu, GiSung;Kim, Hoyong;Jeon, Jueun;Jeong, Young-Sik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2018.10a
    • /
    • pp.80-81
    • /
    • 2018
  • 모바일, IoT, 데스크탑의 컴퓨팅 자원을 통합한 환경에서 다중 작업을 처리하는 연구가 진행되고 있다. 통합된 컴퓨팅 자원(Integrated Computing Resources)에서 다중 작업(Multi-Job)을 처리할 경우에는 실시간으로 발생하는 작업 부하 및 대규모의 컴퓨팅 능력이 요구된다. 또한 사용자에게는 단일 작업 처리 시간과 유사한 작업 처리 속도를 제공해야한다. 기존 클라우드 컴퓨팅의 작업 처리 연구에서는 고성능의 컴퓨팅 자원을 이용하여 단일 작업 처리 속도를 향상시키는 연구는 진행되었으나 다중 작업 처리에 대한 연구는 미흡하다. 본 논문에서는 통합된 컴퓨팅 자원에서 두 개 이상의 작업을 수행하여 작업 처리량을 향상 시키는 다중 작업 스케줄링(MJS-MM)을 제안한다. MJS-MM은 서브미션된 작업을 분할(Decomposition)하고 가용 컴퓨팅의 성능기반 작업을 수행하여 총소요시간(Makespan)을 최소화 할 수 있도록 한다.

서열 환경에서 농작업 모자 착용에 따른 체온 조절 및 주관적 반응

  • 최정화;김명주;이주영
    • Proceedings of the Korean Society of Community Living Science Conference
    • /
    • 2003.11a
    • /
    • pp.152-152
    • /
    • 2003
  • 본 연구의 목적은 고추 수확과 같은 여름철 농작업 시 농민의 온열 스트레스 경감을 위한 피복 장비 개발 연구의 일환으로 두 종류의 기능성 모자를 개발하고 그 성능을 비교 검토하는 것이다. 피험자로는 건강한 남자 대학생 열 두 명이 참가하였다. 인공기후실 실험 조건은 네 가지로 모자를 쓰지 않은 경우 (Control), 챙이 넓은 시판 농작업모를 착용한 경우 (Hat A), 반사 소재의 냉각 모자를 착용한 경우 (Hat B), 반사소재이면서 통기 구조를 갖는 냉각 모자를 착용한 경우 (Hat C)이다. 인공 기후실 내 환경 조건은 기온 33$\pm$0.5$^{\circ}C$, 습도 65$\pm$5%RH, 복사 온도 39$\pm$1$^{\circ}C$로 WBGT 33$^{\circ}C$를 유지하였고, 피험자들은 120분(50분 작업, 10분 휴식, 50분 작업, 10분 휴식) 동안 모델화된 고추 수확 작업을 수행하였다.

  • PDF

Psychophysical method를 이용한 육체적 스트레스 산정의 우리나라에서의 적용 가능성 연구

  • 이관석;전영호;김윤철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.580-586
    • /
    • 1994
  • Psychophysical method는 육체의 자극과 그 자극에 반응하는 인간의 감각과의 관계를 다루는 것으로, 드는 작업시의 하중에 관한 외국의 연구에서 자주 사용되고 있는 방법중의 하나이다. Psychophysical method를 사용하면 8시간 작업을 실제로 하지 않고서도 훨씬 적은 시간의 실험을 통하여 8시간 작업시와 근사한 결과를 얻을 수 있는 장점이 있다. 따라서 이 방법은 시간과 경비를 줄인다는 이점이 있어 많이 사용되고 있다. 본 연구에서는 외국인과 스트레스를 느끼는 정도, 그리고 신체적 차이가 있는 한국의 피실험자에게도 psychophysical method가 적용 가능한가를 알아보기 위하여 우리나라 작업자와 학생에 대하여 연구를 하였다. 20분과 8시간 동안의 드는 작업을 실시한 결과, 작업자군은 20분 동안의 드는 실험에서 8시간 동안의 작업이 육체에 주는 스트레스의 96%를 예측할 수 있었으나 학생군에 있어서는 76%밖에 예측하지 못하였다. 따라서 우리나라에서는 작업 경험이 부족한 학생들에게 psychophysical method를 적용할 경우 보정이 필요하나, 작업 경험이 풍부한 작업자들에게는 용이하게 적용할 수 있음을 알 수 있었다.