Korean Journal of Construction Engineering and Management
/
v.14
no.5
/
pp.175-187
/
2013
Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.
Kim, HyeonSeung;Moon, HyounSeok;Kim, ChangHak;Kang, LeenSeok
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.6
/
pp.1911-1918
/
2014
The increase of input resources, such as labor and equipment, in a construction project causes workspace interference between activities and it influences on the productivity and quality of construction activities. To solve this problem, many studies related to the workspace interference have been performed, however they verified the workspace concerning with only the geometric location of activities or generated the shape of workspace by a whole object concept not separated units of detailed operations. It is difficult for project manager to reasonably analyze the workspace conflict, because the size of workspace cannot reflect the characteristics of an activity and input time of a resource. This paper presents a methodology that can generate three-dimensional models in order to optimize the workspace shape and size by considering with the characteristics of each activity and input time of each resource. The suggested method can be used for the active BIM system that optimizes the workspace conflict without additional construction duration and for the searching algorithm of optimized moving path for construction equipment.
Oh and Kim (2004) and Woodman and Lurk (2004) demonstrated that spatial working memory (SWM) load Interfered concurrent visual search and that search process also impaired the maintenance of spatial information implying that visual search and SWM task both require access to the same limited-capacity mechanism. Two obvious possibilities have been suggested about what this shared limited-capacity mechanism is: common demand for attention to the locations where the items f9r the two tasks were presented (spatial attention load hypothesis), and common use of working memory to maintain a record of locations have been processed(SWM load hypothesis). To test these two hypothetical explanations, Experiment 1 replicated the mutual interference between visual search and SWM task in spite of difference of procedure with preceding researches; possible areas where the items for two tasks were presented were not separated. In Experiment 2, we presented the items for visual search either in the same quadrants where the items for SWM task had appeared (same-location rendition) or in the different quadrants (different-location condition). As a result, search efficiency was more impaired in the different-location condition than in the same-location condition. The memory accuracy was worse in the different-location rendition than in the same-location rendition. Overall results of study indicate that the mutual interference between SWM and visual search might be related to the overload of spatial attention, but not to that of SWM.
Park, Jong-Youl;Lee, Dong-Ik;Kim, Hyoung-Chun;Park, Joong-Gil;Lee, Jin-Seok
Annual Conference of KIPS
/
2003.11c
/
pp.1847-1850
/
2003
유비쿼터스 컴퓨팅의 발전은 사용자에게 컴퓨터가 단순한 도구가 아닌 삶의 일부가 되는 커다란 변화이다. 하지만 대부분의 사용자는 자신이 악의적인 주변의 컴퓨팅 자원에 의해서 위협 받고 있다는 사실을 모르고 있다. 사용자가 수행하는 작업을 안전하게 완료하기 위해서는 자신의 작업공간이 주변의 컴퓨팅 자원에 의해서 간섭 받거나 훼손되지 않아야 한다. 본 논문에서는 이러한 안전한 작업공간을 제공하기 위해서 Private Virtual Computing을 제안한다.
In a parallel manipulator, there are three constraints that determine workspace: link length constraint, passive joint angle constraint, and interference among links. Generally, the link length constraint is the most dominant. The interference among links is, however, also an important parameter in designing a desired parallel manipulator. In this study, the interference among links is mathematically modeled by considering the links as a line and a cylinder of radius of twice the link radius, and a new algorithm is suggested to check if arbitrary two links interfere each other or not. The workspace of a cubic parallel manipulator is illustrated in a 2D space satisfying the three constraints.
Kim, Chang-Hoi;Lee, Sung-Uk;Shin, Ho-Cheol;Kim, Sheung-Ho
Proceedings of the KIEE Conference
/
2006.11a
/
pp.120-122
/
2006
배전선로의 활선작업은 무전전의 고품질 전력 공급을 위한 필수적인 기술이나 매년 안전사고가 발생하고 있는 위험한 작업 분야이다. 이러한 위험한 활선 작업을 로봇이 대신하여 수행하기 위한 연구가 외국에서는 오래 전부터 추진되고 있다. 본 연구에서는 배전선로 상에서 활선작업을 수행하기 위한 로봇을 설계하였다. 선로 상에서 최대한의 작업공간을 확보하면서 작업을 수행토록 하기 위하여 로봇의 탑재 위치에 따른 로봇의 작업성능을 분석하여 로봇의 구조를 설계하였으며 로봇의 기구학적 해석 및 전주 및 완금 등의 부속물과의 간섭을 그래픽 시뮬레이션을 통하여 설계의 타당성을 검증하였다. 개발될 로봇은 배전선로의 애자교체, COS 교체 등의 다양한 분야에서 작업자를 대신하여 활선작업을 수행 수 있을 것으로 예상된다.
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.9-10
/
2011
Domestic construction industry suffered from the IMF and makes a great effort to improve in 'cost management', 'strengthening the competitiveness of the construction industry'. Therefore, the industry has become interested in improving the productivity of construction and ongoing research is being progressed in various angles. In such circumstances, the needs for a study of concepts and space of the actual construction work place is emerging. This study were utilized BIM to understand the types and causes of problems in space during the finishing work in construction and categorize importance and frequency of occurence through a survey of experts and AHP to analyze the realtive effects of importance then modeling to them to aware of issues and give direction for efficient management. This study is anylize the problem which is caused by same time process in finishing work progress of apartment applied by BIM. and categorize the type of work interference management in finishing work, and anylize by the type of occurence then predict the work interference management through in BIM 3D VIEW and suggest the solutions.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.3
/
pp.551-564
/
2016
Earthworks are the fundamental steps in a construction job, and are mainly comprised of smaller tasks performed by construction machinery. The productivity of the construction job can be improved by optimizing excavation, filling, and other such operations. Earthworks involve a lot of mechanical work performed by the collaboration between various kinds of construction equipment, which in turn leads to higher fuel consumption. Actual earthworks depend mostly on the intuition and experience of the driver of the machines, thus leading to inefficiency and environmental problems caused by unnecessary emission of carbon, Recently automated and information-oriented technologies are consistently being researched towards the improvement of efficiency of earthworks in the construction industry. The present research involves the introduction and understanding of the decision-making elements of heuristics which can be applied to the earthwork planning. A method is also suggested for creating an effective work path for construction machine to perform task packages (TP) for cutting and filling processes. A simulation test is performed to verify the effectiveness of suggested methods in terms of space interference and total moving distance of construction equipment.
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.1
/
pp.454-463
/
2013
Upon changing architectural education system into 5-year program, the design studio in university should meet the requirement in order to acquire the accredition. This study investigates on student' perceptions and responses, according to the configuration(open, mixed, closed), to their studio environment. Results and suggestions are as follows for all types: First, there should be space for individual activities for the student: Second, excluding space for excluding space for the individual work, seperated area must be provided for co-operative work, such as making models; Third, a clear territorial distintion between the individual and the co-work space should be able to set by the students, using. for instance, movable partition or corridor; Fourth, however, in line with the types, a seperated lecture or seminar room in the open type, a device to prevent distraction such as noise in the mixed type, and more space for co-work in the closed type are also suggested.
Before blasts that can have direct impacts on human bodies or structures, it is necessary to assess impacts of ground vibration. Therefore, frequency has been recognized as an important factor in order to assess impact on ground vibration and damages. There have been many studies on impacts of frequency. But, there have been no studies on relations between vibration and frequency according to delay time difference. In this study, we examined the relations between delay time difference and frequency according to each frequency with which reinforcement and destructive intervention repeat through delay time difference obtained using superposition modeling of single hole blasting waveform based on the theory of time difference developed by Langefors.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.