• Title/Summary/Keyword: 일정계획 수립

Search Result 267, Processing Time 0.022 seconds

A study on Development of method for Train Schedule Simulation (철도 차량운행계획 시뮬레이션 방법론 개발에 대한 연구)

  • Shin, Dae-Sup;Park, Eun-Kyung;Lee, Jin-Sun;Lee, Seon-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.88-95
    • /
    • 2012
  • Presently, because making process of train service plan consist of various constraint condition, for example structure of track, structure of track in station, train maintenance time and others for considering to be necessary of train management, it has been had extremely complex structure problems. For these reasons, it has big problems to compare analysis for various train service time-table. A study suggest methodology to choice service the most effective schedule and plan of train put before comparative analysis on making train diamond picture's expected effect of established possible various train time-table in making process of train service schedule for improving effectiveness and organization of train service schedule establishment. A study uses Line-Blocking theory for analyzing train service time-table and analyze example for regional train Sadang to Ansan section in 4line.

API-RBI BRD에 따른 RBI 소프트웨어의 개발

  • 송정수;김주호;이승재;최송천;김지윤;윤기봉
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2001.11a
    • /
    • pp.381-386
    • /
    • 2001
  • RBI(Risk-Based Inspection)는 각각의 설비별로 위험등급 또는 위험도를 산정하고 이에 따라 검사의 우선 순위, 방법, 주기 및 일정계획 등을 수립하여 기술적인 근거에 의해 종합적이고 체계적인 검사를 수행하는 것이다. 이와 같이 RBI는 위험도를 정성적/정량적으로 평가하여 위험의 대부분을 내포하고 있는 30% 내외의 소수의 설비를 찾아내어 이에 대해 최적의 방법으로 인적, 물적 자원을 집중적으로 투입함으로써 안전성 확보와 함께 경제성을 추구하는 효율적인 기법이라 할 수 있다.(중략)

  • PDF

A Study on the Methology of u-City Construction Audit (u-City감리기준 개선에 관한 연구)

  • Choe, Sang-Hyun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.202-206
    • /
    • 2009
  • u-City사업은 완성까지 5년 이상이 소요되는 대형 장기사업으로, 정보시스템 개발 및 정보통신공사가 동시에 이루어지는 복합공종 사업이다. 이러한 대규모 사업을 차질없이 수행하기 위해 u-City사업에는 감리도 동시에 수행된다. 그러나 u-City감리는 아직 단일화된 감리기준이 없어 정보시스템 감리기준 및 정보통신공사감리 업무수행지침이 각각 적용되고 있으며, 이로 인해 감리 현장에서는 통일된 일정계획 수립이 어렵고, 업무 분장이 불명확하여 감리대상 일부가 누락되는 경우도 발생한다. 본 논문에서는 정보시스템 감리기준 및 정보통신공사감리 업무수행지침으로 이원화된 감리기준으로 인해 발생되는 문제점들을 살펴보고 이의 개선방향을 제시하였다.

  • PDF

A Study on Determining Single-Center Scheduling using LTV(LifeTime Value) (고객 생애 가치를 활용한 단일 창구 일정계획 수립에 관한 연구)

  • 양광모;박재현;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.05a
    • /
    • pp.285-290
    • /
    • 2003
  • There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty Based on other objectives, many criteria may serve as s basis for developing job schedules. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.

  • PDF

Energy Management System Design Based on Fast Simulation Using Machine Learning Model (기계학습 모델을 이용한 고속 시뮬레이션 기반의 건물 에너지 관리 시스템 설계)

  • Lee, Eun-joo;Kim, Jeong-min;Ryu, Kwang-ryel
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2016.07a
    • /
    • pp.13-15
    • /
    • 2016
  • 에너지 소비가 큰 건물은 내부 온/습도, 이산화탄소 농도, 미세먼지 농도 등의 일정 공기 질을 유지하면서 에너지 비용을 최소화할 수 있는 제어계획을 수립하는 것이 필요하다. 기존 건물에서 실내 환경의 운영은 설정된 실내 환경 값을 기준을 벗어나면 설비 기기를 제어하는 방식으로 이루어진다. 이는 단 시간에 고에너지를 투입하여 장비를 가동시키므로 에너지 소모가 크며 peak 전력이 높아 에너지 비용이 크다는 문제가 있다. 따라서 온도를 포함한 환경이 변해가는 상황을 예측하고 사전에 에너지 사용 계획을 수립하여 관리 제어를 수행함으로써 예열부하 등의 불필요한 에너지 손실을 절감하려 한다. 이를 위해 실내 환경이 변화하는 것을 예측하고 후보 제어계획으로 제어를 수행할 때 소요되는 에너지가 어느 정도인지 시뮬레이션하여 제어계획의 적합도를 평가한다. 기존 EnergyPlus와 같은 시뮬레이션 도구는 모델이 복잡하여 시뮬레이션에 많은 시간이 필요하기 때문에 환경 변화를 반영하기 위해 주기적으로 재수립되는 수많은 제어계획 데이터를 단시간에 시뮬레이션하기에 부적합하다. 본 논문에서는 빠른 시뮬레이션을 위해 실제 운영 데이터와 에뮬레이션을 통해 획득한 운영 데이터를 기반으로 학습 알고리즘을 이용하여 제어계획 적용 시의 미래 상황을 예측한다.

  • PDF

Determining Major Items of Scheduled Maintenance for Apartment through Case Data: Focused on Improving the Establishment Standard for Long-term Repair Program (사례 데이터 분석을 통한 공동주택 계획수선 주요 항목 도출: 법령 상의 장기수선계획 수립기준 현실화를 중심으로)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • Land and Housing Review
    • /
    • v.7 no.1
    • /
    • pp.43-51
    • /
    • 2016
  • The long-term repair program is significant as the execution standard for apartment in repair construction, and provides the basis for effective facility management through appropriation reserve and preventive maintenance. Considering its importance, the government legislates the items, cycle, and ratio for long-term repair. However, the frequent changes, controversies on repair, and difficulties in using appropriation reserve are caused as the items have not been revised on time reflecting up-to-date construction technologies. In order to resolve these problems, it is required to improve the standard by evaluating the appropriateness of repair items throughout the analysis of actual conditions. This study aims to suggest the revision plan for the criteria with the major items based on the status identified by the actual long-term repair programs and historical repair construction data. To do this, the adoption ratios of items to program are reviewed by collecting the real cases of the long-term repair programs. Developing improvement plan was approached in two ways such as "exclusion method" deleting minimum unnecessary items and "selection method" sorting out items with high adoption ratio and evidence of repair in a positive manner. Aa a result, the major items were identified as 118 items and 73 items by exclusion method and selection method respectively from the current 147 items. The outcomes of this study are expected to contribute enhancing the practicality of the standard in that the regulation for long-term repair program should periodically reflect the status of currently applied construction methods and materials.

Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.

An empirical study of office automation(OA) propulsion (우리나라 사무자동화(OA) 현황과 추진방향에 대한 조사 연구)

  • 전용진;박기흥
    • Korean Management Science Review
    • /
    • v.8 no.1
    • /
    • pp.71-89
    • /
    • 1991
  • 최근 기업에서는 사무생산성을 향상시키기 위하여 조직의 특성에 맞는 사무자동화 기기를 도입하여 운영하고 있다. 조직에 따라 OA추진 방식이 다양하므로 OA 추진현황을 분석하여 성공적으로 OA를 추진할 수 있는 방안을 제시할 수 있다면 의미가 있다고 하겠다. 본 연구에서는 현재 우리나라의 OA현황을 조사분석하여 기업이 OA를 추진하는데 가장 적합한 추진방향을 제시하는 것을 목적으로 한다. 따라서 개략적인 OA추진운영 현황을 파악한 후 추진특성별 운영방식과 추진운영별 도입성과를 확인하여 OA도입성과를 극대화하는 추진방향을 제시하고자 한다. 연구조사를 위해 OA 추진 업체와 OA 관련 종사자를 대상으로 우편 설문조사를 실시하여 자료를 수집하였다. 연구결과는 대기업의 경우 OA가 일정수준에까지 도달하였으며, 대부분 장단기계획을 수립한 후에 OA를 추진하고 있으나 투자비용 제한, 개발인력 부족, OA기기에 대한 저항감과 같은 문제점을 안고 있는 실정이므로 이러한 문제점을 해결할 수 있는 방안을 마련하여 OA를 활성화하는 것이 바람직하다. OA실무자는 단순반복업무를 담당하고 있어 업무처리와 관리방식 개선과 같은 근본적인 업무를 거의 하지 못하고 있다. OA도입성과를 극대화하여 성공적으로 OA를 추진운영하기 위해서는 장기계획을 수립하여 추진하고 실무자의 의견을 반영하여 중대형 컴퓨터와 연계활용해야 하는 것으로 나타났다.

  • PDF

Analysis on Canal System for Daily Irrigation Simulation (관개용수로 수리시뮬레이션을 통한 농업용수조직 거동 분석)

  • Park, Ki-Wook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.673-682
    • /
    • 2007
  • 본 연구에서는 관개용수로에서의 용수공급에 따른 용수분배 현상을 모의하고, 개선방안을 제시하기 위한 시뮬레이션 모형을 개발하였다. 관개용수로와 같은 인공적인 수로에서는 흐름의 상태가 취수공, 분수공, 수문 등과 같은 수리시설의 조작에 의해 흐름이 시간적, 공간적으로 변하게 되는 비정상류가 주가 된다. 이러한 비정상류 해석은 농업용수 관리를 위한 관개계획 수립, 농업용 수리시설물의 설계 및 관리에 있어서 중요한 요인이 된다. 용수로의 부정류 해석을 위한 유한차분식으로 구성되는 모형을 개발하여 용수로를 일정구간으로 분할하여 각 구간별 수위와 유속의 변화를 계산하게 된다. 계산된 결과는 현장에서 실측된 수위모니터링 자료와 현장 유량측정자료로 비교하여 모형의 적정성을 검정하였다. 용수로내의 흐름에 대하여 각 구간의 용수도달시간, 관개블록에 대한 분수유량을 산정한 결과는 현장 측정자료와 잘 일치하고 있는 것으로 나타나 관개계획을 수립하는 데 이용할 수 있을 것으로 판단되었다.

  • PDF

Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance (비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.