• Title/Summary/Keyword: 인력배치기준

Search Result 58, Processing Time 0.023 seconds

A Study on Improvement Plan of Teacher Librarians' Placement by a Comparison between Teacher Librarian and Other Teachers Not-teaching the Subject Matter (사서교사와 타 비교과 교사의 배치 비교를 통한 사서교사 배치 개선방안 연구)

  • Kang, Bong-Suk
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.52 no.2
    • /
    • pp.27-47
    • /
    • 2018
  • The purpose of this study is to find a better way for placement of teacher librarians. So, the literature research is applied for the study. It is unreasonable to arrange one school librarian staff per 1,500 students, based on the criteria of the total number of personnel including that of teacher librarians and practice teachers and librarian, in accordance with the existing enforcement decree of Article 7. In fact, this clause, linked to other related regulations, makes it difficult to place teacher librarians. And the quota of teacher librarians is noticeably low as compared with that of other teachers who are not-teaching the subject matter. This operates disadvantageously to teacher librarians when it comes to assigning quota in secondary teacher selection test and the accumulation of this phenomenon gradually worsens the current situation. The roles of teacher librarians and librarians should be defined separately when amending the Enforcement Decree of School Libraries Promotion. And we should also take into consideration that the number of students per school is around 500. Therefore, Enforcement Decree of School Libraries Promotion Act should be revised toward placing teacher librarians depending on the size and number of schools. Predictability should be secured in teacher librarians selection test. In addition, flexibility should be granted to the training institute so that many people can prepare the teacher librarians qualification. Finally, it is necessary to increase the teacher librarian capacity for private schools. This study will be the basis of the theoretical foundation for stable teacher librarian placement.

Improvement of estimating method for construction management service fee by case study (사례분석을 통한 건설사업관리 대가산정 방법 개선)

  • Lee, Ung-Kyun;Yoo, Wi-Sung;Kim, Dong-In;Kim, Tae-Hoon;Cha, Min-Soo;Cho, Hun-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.16-24
    • /
    • 2012
  • The objective of this paper is to suggest the improvement of estimating system for construction management (CM) service fee through the analysis of the previous literatures and criteria and case study. In order to do this, this paper considered the relevance of existing criteria to estimate the CM service fee, the condition of input ratio of engineering resources in the real cases, and current utilization strategy of nonresident technical engineers. Based on the analysis, the following problems were identified; a) the different estimating system for CM fee and construction supervision fee, b) impractical estimating system for the CM fee, and c) inappropriate allocation of human resources for CM. Consequently, this paper suggested the following 4 items for the improvement of the existing system; (1) modification of the current structure of CM fee calculation, (2) rationalization of current level of the CM fee which is required to be raised approximately 5.4 percent compared to design or supervision fee, (3) securement of elasticity of the input ratio of engineering resources from the inception phase, and (4) development of the utilization strategy of nonresident engineers based on the technical requirement of the jobsite. Thus, it is anticipated that this research would affect the compensation package of CM in order to make the estimation process of CM service fee more efficient and to revitalize CM as business.

An advanced nation's case study considering integrated control for construction work quality.safety.environment (건설공사 품질.안전.환경 통합관리를 고려한 해외 사례 고찰)

  • Kim, Dong-Hee;Kim, Woon-Soo;Jeong, Han-Gyo;Noh, Joung-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.819-823
    • /
    • 2008
  • Currently, the quality management, safety management and environment management of domestic construction work does not form a infrastructure for integrated control which have been developed according to the unique characteristics based on respective the law. In other words, the quality manager and safety manager of human resources is set to a legal arrangement personnel, but environment manager of human resources is not. In addition, quality management standard is to perform the work to PDCA(Plan-Do-Check-Action) system which is reflected in all of the requirements of KS A ISO 9001 standard, but safety management plan and hazard harmfulness prevention plan are not properly reflected P(Plan), C(Check) and A(Action) system and focusing on only 4 section Do(D) in KOSHA 18001 standard requirement. Moreover environmental management plan is not even established requirement. Through examining the operation practices of an advanced nation prior to building the integrated control standard for construction work qualify safety.environment, the possibility of applying domestic is reviewed, and then this study is going to research the operation practices of Singapore.

  • PDF

Improved Model for Index of Construction Engineer's Competency Evaluation System in Domestic Construction Management (국내 건설사업관리 기술인력 역량평가 개선모델(I2CEC))

  • Kang, Seongmi;Cha, Minsu;Lee, Woojae;Ji, Woojong;Cho, Hunhee;Yoo, Wisung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.47-58
    • /
    • 2020
  • The ICEC (Index of Construction Engineer's Competency) quantifies the competence of construction engineers using such parameters as experience, education, and qualifications and assigns four technical grades (expert, advanced, intermediate, and beginners) to construction engineers according to their scores for the efficient management and loading of technical personnel. However, as of 2020, the seventh year since its implementation, ICEC has shown many problems in its application, unlike its intended purpose. So institutional supplementation is required to provide improvement measures that can cope with the changing labor market environment and complement the current ICEC. Therefore, this study examined the current status of the career management system after the introduction of the ICEC, suggested a career index proportional to the competence of construction engineers from the beginner to the expert level, and developed an effective capability evaluation model I2CEC. The improved model presented in this study provides a means to comprehensively judge the performance, experience, and the professional work abilities of construction management engineers. Furthermore, the results of this study are expected to contribute to the development of efficient manpower and career management systems for enhancing the competitiveness of the domestic construction industry.

Comparisons of the Nursing Workforce with Japan, and the U.S. (한국, 미국, 일본의 간호인력 양성 및 활동 현황 비교)

  • You, Sunju
    • Journal of Digital Convergence
    • /
    • v.11 no.6
    • /
    • pp.275-287
    • /
    • 2013
  • This study aims to derive implications on current problems in the nursing manpower management in Korea through the comparison with the nursing workforce and employmentrent in the United States and Japan. There are various issues in nursing policy, such as nursing shortage, quality of the nursing service, and the increased cost of management due to the high turnover rate of nursing staffs and it is urgent to seek various policy measures to resolve this. Although nursing shortage is a commom problem in the world, the U.S. and Japan were higher rate of employment than Korea in nursing staffs, which implicates the importance of the legislation of mandatory minimum staffing ratios, the establishment of policies such as the fees and charge policy and the nursing work environments. For quality nursing care and patient safety through the stable workforce of qualified nursing staffs, administrative mechanisms that support adequate nurse staffing and promote positive work conditions are needed, for which the improvement of legal system is required.

Organizational and Institutional Innovation for Strengthening Expertise in Public Records Management (전문성 강화를 위한 공공기록관리 조직 및 제도 혁신 방향)

  • Seol, Moon-won;Kim, Hyeong-kuk;Lee, Won-kyu
    • The Korean Journal of Archival Studies
    • /
    • no.56
    • /
    • pp.5-48
    • /
    • 2018
  • The main factors for successful records management are the organization and human resources, and the responsibilities and authority that are assigned to them. Therefore, the innovation of public records management should include i) redefining the role of records management institutions to meet the requirements of professional standards, ii) improving organizational setup and staffing policies, and eliminating the legal obstacles. This paper aims to suggest the innovation tasks above areas for strengthening the expertise of each type of public records institution. The tasks are presented in four categories, such as the records centers, local archives, institutional archives of legislative body and Judicial authorities, and professionalism and ethics. Based on parts of the Public Records Management Innovation TF(2017.9-2017.12) report, it is rearranged considering the pending issues and reflecting the opinions of the record managers in public sectors to reinforce the basis for setting the tasks.

Improvement of Personnel Cost and Placement Scale of Quality Manager for Construction (건설공사 품질관리자의 인건비 및 배치규모 개선)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.327-335
    • /
    • 2018
  • In order to calculate the quality management cost of construction work, the process must conform to relevant laws and regulations. In details, the cost of the various items such as quality test fee and quality control activity cost are required to be calculated. Regarding the quality management costs, the labor cost is applied to the quality examination fee and the calculation unit quantity in the construction quality management duties. The application of the unit price of the labor cost stipulates that Construction Association of Korea and Korea Engineering & Consulting Association apply the unit price which is surveyed and published. However, in the related laws and regulations, the standard of the quality manager and quality tester is not clear. This accounts for the confusion in the cost of construction management and the cost of labor. In the current law, the allocation standard of quality control personnel is specified according to the size of the construction, but the standard of placement of quality testers is not specified. At the construction site, there is no assignment criteria manpower for quality testers except quality managers, or very little work is being done. The quality control personnel conducts the quality test work to be carried out by the quality tester, and this carrying out heavy work. Therefore, it is difficult to maintain quality control activities. In this study, the labor cost of quality management expenses and the allocation criteria of quality managers and quality testers are established and presented for the purpose of securing the quality of the construction work and preventing the construction work. It is stipulated that the standards of the relevant laws and regulations, which are not clear, should be classified into quality control personnel and quality testers according to the size of the construction. Based on the unit price of Korea Engineering & Consulting Association, the personnel expenses of quality managers and quality testers are proposed to apply the unit price of engineer (professional engineer, specialist, advanced, intermediate, beginner) and skilled technicians (advanced, intermediate, beginner).

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.

Evaluation on Management of Unified Health Subcenters (통합보건지소 운영 평가)

  • Kang, Pock-Soo;Lee, Kyeong-Soo;Hwang, Tae-Yoon;Kim, Chang-Yoon
    • Journal of agricultural medicine and community health
    • /
    • v.28 no.1
    • /
    • pp.67-77
    • /
    • 2003
  • Objectives: This study is designed to suggest the health service goals necessary for providing the more efficient services relevant to the requests of the community, through the evaluation on the operating status of the unified health subcenters. Methods: We visited total 5 unified health subcenters comprising 3 ones located in Gyeongsangbuk-do and 2 ones located in Gyeongsangnam-do from December 2000 to January 2001, and interviewed about the pre- and post-unified status related to manpower, facilities, equipment, medical service and health service quality, and the problems and improvement plans of the unified management. Results: According to the evaluation on the manpower before and after the unification of the health subcenters, the total employees increased by 2.8 persons on average from 6.8 to 9.6 persons in the investigated subjects. The numbers of doctors, dentists and nurses were almost the same as before. There were no clinical pathologic technician and radiological technician before but they were appointed to duty in 3 unified health subcenters later. The unification of the health subcenters has produced slight increases in the frequency of the medical service and dental treatment and considerable increases in that of the physical therapy and laboratory tests. In relating to the changes of the health service, the cases of visiting health care and ambulatory medical service, and the total number of health education participants were greatly increased after the unification. The number of cases undergoing the vaccination and cervical cancer screening was similar to that of the pre-unification while the patient number of the registration to hypertension or diabetes showed a tendency to increase a little. Since the unification of the health subcenters, the frequency of laboratory tests has been increased, but the quality of health service has not been improved yet. Nevertheless, the unification seems to be positive according to the result of the great improvement in visiting health care, ambulatory medical service and health education service. The problems of the unification of the health subcenters were indicated in indefiniteness of the service details between the workers; excessively large building hard to be effectively managed; insufficient medical instruments, inappropriation of working expenses, lack of professional training for the health education, etc. Conclusions: For further active functions of the unified health subcenters, the minimal allocation basis to appoint doctors, nurses and administrative workers to do the duty should be differentiated from the basis for a health subcenter, and the fundamental instruments needs to be expanded to improve the quality of the medical service and visiting health care service. Moreover, the unified health subcenter needs to have definite service details between the workers, and should improve the working efficiency through the development of service-related guidelines.

  • PDF

A Study on the Improvement of Safety and Health Activities in the Construction Contractor(Public Institutions) (건설공사 발주처(공공기관) 안전보건활동 수준향상에 관한 연구)

  • Moon, Ji-Hwan
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.121-122
    • /
    • 2023
  • 건설공사를 발주하는 공공기관은 대표이사 직속의 안전전담부서를 구성하고 있으나 순환보직 형태로 인력을 배치하여 안전보건에 관한 전문 지식이 부족하며, 여러 부서에서 안전관리 기준을 제정하거나 활동을하여 안전관리 체계에 혼선을 주고 있다. 또한 관리감독자들은 회사의 안전관리 기준을 제대로 인식하지 못하여 안전관리 활동이 원활하게 이루어지지 않고 있다. 건설공사를 발주하는 공공기관의 안전관리 활동수준을 향상하기 위해서는 안전관리 조직, 안전관리 체계, 위험성평가에 대한 개선의 노력이 필요하다.

  • PDF