• Title/Summary/Keyword: 유도배수

Search Result 176, Processing Time 0.029 seconds

Drainage system for leakage treatment of cement concrete structure in underground (콘크리트 지하구조물 누수 처리를 위한 유도배수시스템)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.573-585
    • /
    • 2019
  • The objective of this study is to propose the drainage system that has been improved the workability, waterproofing and drainage performance to treat the leakage from the cement concrete structures in underground. It is improved that the pipe for conveying ground leak in the existing drainage system had the problem in workability and waterproof. The drainage systems with the improved pipe for conveying ground leak were constructed in conventional concrete lining tunnels to evaluate the workability, waterproofing and drainage. The waterproof and the drainage performance of the drainage system was evaluated by injecting 1,000 ml of red water in the back of the drainage system at 3 weeks, 6 weeks, 9 weeks, 11 weeks, 14 weeks, 17 weeks and 23 weeks. During 6 months of field performance test, the average daily temperature of the tunnel site was measured from $-12.4^{\circ}C$ to $19.7^{\circ}C$. The daily minimum temperature was $-17.2^{\circ}C$ and the daily maximum temperature was $26.7^{\circ}C$. There was no problem in waterproof and drainage performance on the pipe for conveying ground leak and the drainage system during 6 months for field performance test. It is concluded that the improved drainage system can be applied to various cement concrete underground structures where leakage occurs, and has little seasonal effect.

Long-term performance of drainage system for leakage treatment of tunnel operating in cold region (한랭지역에서 운영 중인 터널의 누수처리를 위한 유도배수시스템의 장기 성능 평가)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1177-1192
    • /
    • 2018
  • The objective of this study is to develop the existing drainage system for catching the partial leakage of tunnel structures operating in cold region. The drainage system consists of drainage board, Hotty-gel as a waterproofing material, cover for preventing protrusion of Hotty-gel, air nailer, fixed nail, pipe for collecting ground leak, pipe for conveying ground leak, wire-mesh, and sprayed cement mortar. The drainage systems were installed in conventional concrete lining tunnels to evaluate the site applicability and constructability. The performances of waterproof and the drainage in the drainage system were evaluated by injecting 1,000 ml of red water in the back of the drainage system at 7 days, 14 days, 21 days, 28 days, 2 months, 3 months, 4 months, 5 months, 6 months, 7 months and 8 months. During 8 months of field test, the average daily temperature of the tunnel site was measured from $-16.0^{\circ}C$ to $25.6^{\circ}C$. The daily minimum temperature was $-21.3^{\circ}C$ and the daily maximum temperature was $30.8^{\circ}C$. There was no problem in waterproof and drainage performance of the drainage board in the drainage system. However, the pipe for conveying ground leak had the leakage problem from 14 days. It is considered that the leakage of the pipe for conveying ground leak was caused by the deformation of the pipe of the flexible plastic material having a thickness of 0.2 cm by using the high pressure air nailer and the fixing pin and the insufficient thickness and width of the hotty-gel for preventing the leakage.

A numerical comparative study on induced drainage modelling in 2D hydro-mechanical coupled analysis (이차원 수리-역학적 연계해석 시 유도배수 모델링 방법에 따른 수치해석적 비교연구)

  • You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.91-104
    • /
    • 2008
  • In tunnels, safety factor concept has been suggested to estimate their stability quantitatively. It is merely limited in the framework of mechanical analysis. However safety factor concept has not been applied in hydro-mechanical coupled analyses due to their modelling complexity. Recently studies on this topic are being actively made. In this study, induced drainage modelling methods for hydro-mechanical coupled analyses are compared and analyzed to estimate safety factor of a subsea tunnel exactly. To this end, methods both controlling hydraulic characteristic of shotcrete and using a drainage well are considered. Sensitivity analysis were carried out on rock class, thickness of shotcrete, and hydraulic properties of rock mass. As the results of this study, it turned out that the induced drainage modelling using a drainage well would give more reliable results than that of controlling hydraulic characteristic of shotcrete in estimating tunnel stability in hydro-mechanical coupled analyses.

  • PDF

Development and performance verification of induced drainage method for leakage treatment in existing underground structures (운영중인 지하구조물 누수처리를 위한 유도배수공법 개발 및 성능 검증)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.533-549
    • /
    • 2017
  • In this study, drainage systems were proposed to drain the leakage of groundwater in the existing underground concrete structures. The system consists of drainage board, wire mesh, fixed nail, and mortar with mineral. In order to increase constructability, the drainage board and wire mesh were attached on the surface of cement concrete using the air nailer and fixed nail. The mortar with 30% of blast furnace slag was sprayed on the drainage board and wire mesh using the spray mortar equipment. The field test construction was carried out in a conventional concrete lining tunnel and concrete retaining wall for performance verification of the drainage system in the field. There was no problem with performance degradation in the drainage system for three years after construction. The bond strength tests were performed on the sprayed mortar at 14 days and about 3 years after field test construction. In case of attaching the wire mesh on the drainage board, the bond strengths of the sprayed mortar were 1.04 MPa at 14 days and 1.46 MPa about 3 years. In case of the drainage board without the wire mesh, the bond strengths of the sprayed mortar were 1.13 MPa at 14 days and 0.89 MPa, less than 1 MPa of bond strength criteria, about 3 years.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

A Study on the Guided drainage Method of Underground Roadway (지하차도 유도배수공법에 관한 연구)

  • Jun, Sang-Mi;Sok, Chamroeun;Park, Jae-Hyeon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.434-434
    • /
    • 2012
  • 현재 지하차도 설계 지하수위는 철도, 지하철 및 공동구의 설계기준과 기존사례를 준용하여 지표면 하 1.0 m를 기준으로 설계하고 있으며, 지하차도 설계시 지하수위 적용에 대한 명확한 기준과 그에 따른 설계와 유지관리지침 등이 마련되어 있지 않아 부득이 기존의 공법을 그대로 답습하고 있다. 또한 대부분 과다설계 요인과 친환경적이지 못하다는 지적받고 있는 부력앵커공법을 적용하고 있는 실정이다. 본 연구에서는 영종하늘도시 사업지구에 시공중인 지하차도 구조물과 관련하여 지하차도 구조물 건설에 따른 지하수 흐름 변화 특성을 평가하여 유도배수공법의 효과를 검토하였다. 지하차도 건설에 의한 흐름변화 분석을 위하여 3차원 지하수 MODFLOW 프로그램을 이용하였으며 지하차도 건설전, 후에 대하여 프로그램을 수행하였다. 수행 결과 지하차도 건설 전 유역의 평균 지하수위는 지표하 1~2m 이상으로 비교적 높은 지하수를 형성하고 있는 것으로 평가되었다. 유도배수공법을 적용한 지하차도 건설 후 지하차도 주변부 지하수위는 건설전에 비하여 약 3~4 m 하강하는 것으로 분석되었으며, U-type 종점부는 지표하 최소 6 m 이상, 시작부는 지표하 최소 3.4 m 이상 아래에 형성되는 것으로 평가된다. 연구 결과는 향후 지하차도 유도배수공법 평가의 기초자료로 활용할 수 있을 것으로 판단된다.

  • PDF

Behavior of Geosynthetic Reinforced Wall with Heat Induce Drainage Method During Rainfall (열유도 토목섬유 배수공법이 적용된 보강토 옹벽의 강우시 거동 특성)

  • Shin, Seung-min;Sin, Chun-won;Yoo, Chung-Sik
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.1
    • /
    • pp.11-19
    • /
    • 2016
  • This paper presents the results of a scale model test to the effect of heat exchanger drainage method in retaining wall of weathered granite soil. Purpose to rise in the temperature of the heat wires inside the weathered granite soil is preventing the collapse of the retaining wall and drainage smoothly moved to the drainage layer. Especially using a spray gun to simulate the rainfall since the rainfall drainage work is important for the rainfall effect on soil, find the difference about displacement of the retaining wall, change of volume water content, drainage, earth pressure and change in the strain of the geosynthetic was effected to heat exchanger within the soil. The result from applying the heat exchanger method decreased the earth pressure and displacement of the wall and increased drainage of water.

Assessment of Transmissivity of Blended Geotextiles for Drainage (배수용 혼합 지오텍스타일의 수평투수성 평가)

  • 전한용;목문성;주용수;유중조
    • Proceedings of the Korean Fiber Society Conference
    • /
    • 2001.10a
    • /
    • pp.428-431
    • /
    • 2001
  • 토목합성재료(Geosynthetics) 중 배수용으로 사용되는 재료는 기능상 유체의 흐름을 수평방향으로 유도하는 재료를 의미하며, 일반적으로 저장된 유체를 수직으로 이동시키는 필터기능을 가지는 1,000g/㎡ 미만의 지오텍스타일(geotextiles)과 수평방향의 유도로를 확보한 지오네트(geonets)를 결합시킨 지오네트 복합제품이 사용되고 있다. 이러한 배수용 토목합성재료는 쓰레기 매립장의 건설 시 침출수의 외부유출을 차단하기 위하여 설치하는 차수막인 지오멤브레인(geomembranes)을 매립된 쓰레기 하중 및 외부의 충격으로부터 보호하는 용도로 사용된다. (중략)

  • PDF

연계해석 시 해저터널의 이완하중고 산정을 위한 수치 모델링 비교 연구

  • Yu, Gwang-Ho;Lee, Dong-Hun
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2007.10a
    • /
    • pp.137-146
    • /
    • 2007
  • 해저 지하 구조물을 시공할 경우는 높은 수압 및 침투압 등의 영향이 무시될 수 없으므로 지하저장 공동의 정확한 거동평가를 위해서는 수리-역학적 해석이 수행되어야만 한다. 또한, 실무에서는 암반이완하중을 고려하여 터널의 콘크리트 라이닝을 설계하며, 이를 위해 이완하중고를 터널 주변의 국부안전율 분포를 이용하여 수치해석에 의해 산정하는 방법이 제안된바 있다. 따라서 본 연구에서는 해저터널을 대상으로 수리-역학적 연계해석 시 국부안전율을 이용한 이완하중고 산정 기법의 타당성을 살펴보았다. 이를 위해 3등급 암반을 대상으로 숏크리트 수리특성을 이용한 유도배수방법과 집수정의 펌핑을 이용한 유도배수방법을 이용하여 이완하중고를 산정하고 적용성을 비교하였다. 연구 결과 연계해석 시 해저시설물의 안전율 및 이완하중고를 정확하게 산정하기 위해서는 집수정의 펌핑을 이용하여 유도배수하는 모델링 방법이 보다 정확하고 일관성 있는 결과를 얻을 수 있었다.

  • PDF

Applicability examinations of induced drainage system for reduction of uplift pressure in underpass structures: Numerical study (지하차도 부력저감을 위한 유도배수공법의 적용성 검토: 수치해석적 연구)

  • Jo, Seon-Ah;Jin, Gyu-Nam;Sim, Young-Jong;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.123-134
    • /
    • 2013
  • Urban underground structures at low ground elevations (i.e. shallow substructures) unlike typical tunnel structures are subjected to low overburden and high water pressures. This often causes the underground structures to become damaged. Various conventional methods for the urban underpass structures such as dead weight increasement, round anchors, and tension piles, are significantly conservative and provok concerns about the costly, time-consuming installation process. Recently, permanent drainage system becomes to widely use for supplementing the conventional method's shortcomings, but, it is applied without the considerations for ground conditions and water table. In this study, therefore, numerical analyses are performed with various parameters such as groundwater level, wall height, and ground conditions in order to establish design guidelines for induced drainage system which is a kind of the permanent drainage method constructed at the Y-area. According to the numerical results, the induced drainage system is very effective in reducing the uplift pressure that acts on the base of underpass structures.