• 제목/요약/키워드: 웹싸이클론

검색결과 6건 처리시간 0.025초

웹싸이클론을 이용한 가스압접공사의 생산성 분석에 관한 연구 (Productivity Analysis of Gas Pressure Welding Work Using Web-CYCLONE)

  • 구신혁;김용우;이동은;허영기;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.273-275
    • /
    • 2012
  • In apartment building with column structure, reinforcing bar of the column is constructed mainly using gas pressure welding job. Therefore, gas pressure welding job in very critical process is construction apartment building with column structure. The purpose of this study is to analyze productivity of gas pressure welding work in column structure apartment using Web-CYCLONE. In this study, a CYCLONE model was developed for the productivity analysis of gas pressure welding work. Through this model, the optimal combination of the resources was obtained. This study will be utilized in the future as a useful tool of productivity analysis and the determination of an optimal combination of resources for gas pressure welding in apartment with column structure.

  • PDF

웹싸이클론을 활용한 알루미늄 폼 공정의 품셈산출 (Estimating Productivity of AL-Form Operation Using Web-CYCLONE System)

  • 이동은;김용우;손창백
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.115-122
    • /
    • 2013
  • 표준품셈은 공공공사의 예정가격 산정을 위한 기초자료로 사용되어 왔다. 이는 매년 제 개정 업무가 수행되고 있으며 그로인해 많은 인원과 시간이 소요되고 있다. 이러한 문제점을 해결하기 위해 본 논문은 싸이클론을 활용한 방법론을 제시한다. 품셈산출을 위해 보조적 작업 및 비생산적 작업을 시뮬레이션 모형에 용이하게 반영할 수 있도록 품셈모듈을 개발하여 적용하는 방법론을 제시한다. 이에 본 연구는 알루미늄 폼 공정을 대상으로 싸이클론 시뮬레이션 및 워크샘플링 기법을 적용하여 품을 산출하고 그 결과를 비교하여 품셈모듈이 탑재된 싸이클론 모델이 품셈 제 개정 업무에서에 효율성 및 사용성이 있음을 검증한다.

조건별 세부공종 시뮬레이션을 통한 아스팔트 포장공사의 생산성 분석 (Productivity Analysis for Asphalt Paving by Means of Simulation Technique for Site Conditions)

  • 김유진;이수민;노재윤;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.34-35
    • /
    • 2021
  • Currently, the Korean Smart Construction Corporation aims to stimulate overseas expansion of smart construction technology centered on Expressway development. In addition, the integrated classification system of construction information with Work Breakdown Structure(WBS) is currently being established in Korea, but its application to the construction industry is limited. In this study, data generation using simulation is carried out at the lowest level of WBS presented by the Korea Expressway Corporation, and detailed process productivity is predicted by site conditions.

  • PDF

토공사 공정관리를 위한 이산형 건설시뮬레이션과 인공신경망 기반 건설성능지표 도출 방법론 (Development of Construction Performance Indicators Using Artificial Neural Network and Discrete Construction Simulation for Earthmoving Operation)

  • 정다현;박성봉;이수민;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.10-11
    • /
    • 2021
  • Demands for digital transformation of the construction industry are increasing to improve the accuracy of the construction operation planning and the performance of the construction operation. Even though large number of studies are being conducted to this date, most of the studies are not likely to be available on the real sites. Therefore, this study provides construction managers with a methodology of drawing construction performance indicators based on productivity analysis using Artificial Neural Network (ANN) models and Web-CYCLONE. This methodology is expected to have high utilization and precision of construction operation planning and management.

  • PDF

시뮬레이션을 이용한 석면 해체공사의 최적화 공정계획 모델 (A Model for Optimization Process of Asbestos Dismantling Work Using Simulation)

  • 조형준;노재윤;이호현;이수민;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2022
  • In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.

  • PDF

석면해체 공사의 작업 위험성 기반 공정 계획 모델 개발 (Development of Process Planning Model for Asbsestos Dismantling Work Based on Performance Risk)

  • 이수민;노재윤;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.71-72
    • /
    • 2023
  • Asbestos is a durable and heat-resistant building material used in various building materials such as slate, ceiling tex, and spray paint. It has been banned since 2009 after found to be a first-class carcinogen that causes various cancers and asbestos lung disease. Since workers are likely to be exposed to asbestos in the process of dismantling and removal of asbestos-made building materials and facilities, laws and work standards are proposed by the Ministry of Employment and Labor to ensure the safety of asbestos dismantling work. In addition, prior studies on exposure levels and analysis methods have been conducted in this regard mainly for residents. However, the relation between the results of the risk assessment of the process conducted during the asbestos investigation and the work is still ambiguous for the safety of workers. Therefore, this study proposes a process model development methodology that considers work risk based on the results of a survey from asbestos dismantling companies.

  • PDF