• Title/Summary/Keyword: 오피스건축물

Search Result 20, Processing Time 0.021 seconds

Data interoperability between authoring software and BIM system focused on the office building in conceptual design phase (설계 초기 단계 형상정보 연동 데이터 호환체계 개발 - 오피스 매스를 중심으로)

  • Park, Jung-Dae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.494-500
    • /
    • 2020
  • Owing to the complexity of shapes and elements, some difficulties are found in the modeling and sharing phases in a project at the earlier design stages. This paper extends the boundaries by suggesting the data interoperability between 3D modeling software, McNeel Rhino 3D and BIM system, and Autodesk® Revit® Architecture. The main research methodology is to link the architectural form data in the NURBS supporting the 3DM format, especially for integrating surface properties into the mass family template of Revit. This algorithm-driven interoperability approach using visual programming, such as Dynamo in conjunction with Autodesk®, can be applicable in a theoretical part and also a practical use-case. This paper summarizes these results as sequence guidelines and project template recommendations suggesting an efficient design process to interoperate geometric data with the BIM system to manipulate and control the regular and curved form of office buildings.

An Economic Evaluation Study of Office Remodeling and Green-remodeling Projects : A Simulation Approach to a Rental Office in GBD, Seoul (생애주기를 고려한 오피스 건물의 리모델링과 그린리모델링의 경제성 평가 연구 : 서울시 강남업무지구의 임대오피스 사례)

  • Lee, Seong-Ho;Lee, Jae-Su
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.3
    • /
    • pp.23-34
    • /
    • 2018
  • Due to a waste of energy in korea, about 525,000 which are 75 percent of total buildings are at least 15 years old buildings that need remodeling. There are two current remodeling systems. One is a remodeling system to reduce a waste of resources from the reconstruction. The other is a green-remodeling system aimed to energy savings and reducing environmental costs. This study is to analyze quantitatively these current systems with respect to the cost-benefit caused by the life cycle and suggests the political and institutional implications through the interpretation of the results. For a quantitative analysis, we analyzed reducing maintenance costs and rent benefits with simulation by using opportunity costs, construction costs, plan costs and supervision costs as expense variables and using the reduced floor area ratio, institutional incentives, energy, water resources and certified emission reduction(CER) as benefit variables. As a result of the empirical study, the green-modeling was more beneficial in the field of environment such as the energy savings, however, the final benefits of remodeling which has no green building certification costs but more floor area ratio incentives were more economical. The green-remodeling system focused on reducing environmental costs and energy savings needs a equatable institutional incentive system.

A Study on the Design Technique for Energy Performance Indicators of Existing Office Buildings (기존 오피스건물 에너지성능지표에 따른 설계기법 연구)

  • Jung, Hyungtae;Lee, You Na;Kim, Insoo;Ahn, Jong-Wook
    • Journal of Energy Engineering
    • /
    • v.27 no.3
    • /
    • pp.28-35
    • /
    • 2018
  • Guidelines and institutional support for buildings are being promoted around the world as measures for environmental pollution and energy conservation. In Korea, standards are prepared according to the energy saving design standards of new buildings as amended in 2013.09.01 and the zero energy building for new buildings mandatory process is being prepared from the recommendations. Nevertheless, the government's binding power on smaller buildings is insufficient. Energy savings were analyzed for the recently constructed office buildings (application of external insulation technique) and propose a dual envelope techniques were proposed for energy reduction.

An Experimental Study on the Flexural Behavior of Composite Steel Deck Slab with Bored Openings (천공 개구부가 있는 합성슬래브의 휨거동에 관한 실험적 연구)

  • Eom, Chul Hwan;Kim, Hee Cheul;Park, Jin Young
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.5
    • /
    • pp.607-614
    • /
    • 2006
  • The composite metal deck plate system has been widely used of late for office structures. However, composite floor decks are bored imprudently for installation in building equipment. In this study, experimental investigations of bored composite steel deck slabs were performed to evaluate the flexural capacity of each specimen. The variables set were the shapes and positions of the openings in the composite slabs. The results were analyzed in the form of load-displacement graphs and with respect to the ductility and energy dissipation capacity ofeach specimen to evaluate its structural capacity.

A Study on Supporting Design Decision Making in Office Building Remodeling Projects by Introducing Mixed Reality (혼합현실 도입 오피스 건물 리모델링 프로젝트 설계 의사결정 지원)

  • Han, Mooyeul;Baek, Kwanyup;Lee, Kyung-Tae;Ko, Seonju;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.3-12
    • /
    • 2021
  • In the remodeling projects, clients without architectural expertise have limitations in presenting requirements accurately. In some cases, designers and contractors may not recognize their demands exactly, and deliver final products that are different from the clients' intentions. 3D modeling visualizing final products in previous has been regarded as a solution to enhance understanding and communication. However, this approach has the limitation that the final results are presented as a virtual outputs. In the remodeling project, an alternative, mixed-reality, is likely to reinforce the reality as it enables to present remain structure and the parts to be built together. This paper examines the mixed reality as a solution to support decision making of clients and practitioners in remodeling projects. The examinations is conducted in high-rise office remodeling projects by means of action-research. Clients and practitioners, overview product models presented in the format of 2D drawings, BIM and mixed reality asked to evaluate the effectiveness of each methods in 12 standards. The results have shown that mixed reality has improved the sense of reality, making it easier to predict results, but recognizing patterns is difficult in some areas such as the floor, and it caused dizziness.

An Analysis of the Trend on the Interior Lighting Design of High-rise Office Buildings in Korea (국내 초고층 오피스 건축물의 조명설계 경향 분석)

  • Jeong, Keun-Young;Hong, Seong-Kwan;Choi, An-Seop;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.157-160
    • /
    • 2007
  • Recently, may high-rise buildings have been constructed, and will be constructed so that concerns about high-rise buildings have increased. We need to develop energy saving techniques immediately because the high-rise buildings consume a lot of energy. The most of effective energy saving method is the application of the efficient lighting designs and fixtures. The purpose of this study is to analyze the trend of lighting design, fixture and control system in Korea and it can be used the lighting application guide-line for the high-rise buildings.

  • PDF

Analysis of Characteristics and User's Evaluation for Lightweight Panel in Apartment (공동주택 경량칸막이 벽체구성재 분류별 사용자 평가 및 특성 분석)

  • Park, Hyeon-Ku
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.181-191
    • /
    • 2010
  • Lightweight panels are currently used in many ways, such as inner walls of the skyscrapers and residential buildings in Korea. Moreover there has been an increasing of interest in developing construction method and quality improvement as many buildings became higher, because there are more advantages like constructability, finishability, and economic efficiency, etc. than previous heavy weight concrete wall. It is necessary to analyze the characteristics and evaluate the performance of lightweight panels when selecting proper methods and materials to building characteristics and builder's demand. However, there doesn't exist systematic data with a classification of lightweight panels' type and performance. The purpose of this study is to classify domestic lightweight panels by both type of exterior board and construction method, and also to evaluate each performance by surveying user's opinion.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Bending Behaviour of Composite Slab Using a New-Shaped Steel Deck Plate and Expanded Metal (신형 데크플레이트와 철판망을 적용한 합성슬래브의 휨 거동)

  • Kim, Myoung Mo;Eom, Chul Hwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.4 s.65
    • /
    • pp.403-412
    • /
    • 2003
  • The composite metal deck plate system has been widely used for office structures. Recently, however, the flat deck plate has been developed to apply the composite slab system to residential structures. Reduction in construction cost and time can be expected by using expanded metal instead of wire mesh as crack control reinforcements. This study proposed a composite slab system composed of a new-shaped steel deck plate and expanded metal. Twelve specimens were tested to evaluate the structural performance of the new composite slab system. The test results were summarized mainly in terms of maximum load carrying capacity and failure behaviors of each specimen.

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.