DOI QR코드

DOI QR Code

A Study on Supporting Design Decision Making in Office Building Remodeling Projects by Introducing Mixed Reality

혼합현실 도입 오피스 건물 리모델링 프로젝트 설계 의사결정 지원

  • Han, Mooyeul (Department of Architectural Engineering, Hanyang University) ;
  • Baek, Kwanyup (CM Operating Dept, Junglim Architect) ;
  • Lee, Kyung-Tae (Department of Architectural Engineering, Hanyang University) ;
  • Ko, Seonju (Department of Architectural Engineering, Hanyang University) ;
  • Kim, Ju-Hyung (Department of Architectural Engineering, Hanyang University)
  • Received : 2020.09.19
  • Accepted : 2020.12.02
  • Published : 2021.01.31

Abstract

In the remodeling projects, clients without architectural expertise have limitations in presenting requirements accurately. In some cases, designers and contractors may not recognize their demands exactly, and deliver final products that are different from the clients' intentions. 3D modeling visualizing final products in previous has been regarded as a solution to enhance understanding and communication. However, this approach has the limitation that the final results are presented as a virtual outputs. In the remodeling project, an alternative, mixed-reality, is likely to reinforce the reality as it enables to present remain structure and the parts to be built together. This paper examines the mixed reality as a solution to support decision making of clients and practitioners in remodeling projects. The examinations is conducted in high-rise office remodeling projects by means of action-research. Clients and practitioners, overview product models presented in the format of 2D drawings, BIM and mixed reality asked to evaluate the effectiveness of each methods in 12 standards. The results have shown that mixed reality has improved the sense of reality, making it easier to predict results, but recognizing patterns is difficult in some areas such as the floor, and it caused dizziness.

리모델링사업에서 건축적 전문 지식이 없는 클라이언트의 경우 요구사항을 정확하게 제시하는데 한계가 있다. 그 결과, 시공자와 설계자는 요구를 정확하게 인지하지 못해 클라이언트의 의도와 다른 설계를 진행하기도 한다. 이를 극복하기 위해 3차원 모델링 방법이 도입되고 있지만, 향후 지어질 결과를 가상으로 보여주는 이러한 방식도 한계가 있다. 리모델링 프로젝트의 경우 남겨진 구조물에 새로 지어질 부분을 더해 이해도를 높일 수 있는 증강현실을 도입할 경우 프로젝트 참여자의 이해도를 높일 수 있을 것으로 기대된다. 이에 본 연구에서는 고층 오피스 건물 리모델링 프로젝트를 대상으로 혼합현실을 도입했을 때 클라이언트가 설계 내용을 어느 정도 이해할 수 있고, 이를 바탕으로 의사결정을 원활하게 내릴 수 있는지를 검증하고자 한다. 실행연구를 통해 클라이언트, 프로젝트참여자가 2D CAD 도면, BIM, 혼합현실을 각각 체험한 후 12가지 의사결정 준거별로 어느 정도 지원 효과가 있는지 분석했다. 혼합현실의 경우 현실감 향상을 통해 향후 결과를 예측할 수 있는 장점이 부각된 반면, 바닥과 같은 일부 부위의 경우 패턴 인식에 어려움이 있었고 어지럼증을 호소하는 단점이 파악되었다.

Keywords

References

  1. Cho, K.M., and Kim, T.H. (2018). "Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects-" Journal of the Korea Institute of Building Construction, JKIBC, 18(4), pp. 385-394. https://doi.org/10.5345/JKIBC.2018.18.4.385
  2. Choi, K.S., Lee, H.K., Park, Y.H., and Paek, J.H. (2003). "A Study on validity of CM at Risk for Discount Store Remodeling Projects." Architectural Institute of Korea, 23(2), pp. 527-530.
  3. Gang, J.M., and Lee, G.J. (2019). "A Study on the BIM Practice in Architectural Office." Journal of the Architectural Institute of Korea, 39(1), pp. 154-155.
  4. Hong, J.H., Yeom, D.J., Choi, S.J., and Kim, Y.S. (2017). "A Study of the Decision Support Model to Select an Appropriate Alternative Plan in Apartment Remodeling." Architectural Institute of Korea, 33(3), pp. 41-50.
  5. Hong, S.W., and Ahn, Y.S. (2004). "A Study on Countermeasures for the Strategic Risk Management of Remodeling in Construction Projects." Architectural Institute of Korea, 20(11), pp. 153-160.
  6. Jensen, P. A., and Maslesa, E. (2015). "Value based building renovation-A tool for decision-making and evaluation." Building and Environment, 92, pp. 1-9. https://doi.org/10.1016/j.buildenv.2015.04.008
  7. Ju, J.J., Kim, C.H., and Jeong, E.Y. (2007). "A Study on the Analysis of Satisfaction Index in Library Remodeling." Architectural Institute of Korea, 23(8), pp. 53-62.
  8. Kemmis, S. (1998). "System and lifeworld, and the conditions of learning in late modernity." Curriculum Studies, 6(3), pp. 269-305. https://doi.org/10.1080/14681369800200043
  9. Kim. J.H., Yoon. S.M., and Lee. S.Y. (2006). "Classifying Building Industry Clients and Investigating Their Attitude and Behavior: Supplement Research on Individual Clients." Architectural Institute of Korea, 8(4), pp. 123-130.
  10. Kim, K.T. (2009). "A study on the implementation of USN technologies for safety management monitoring of architectural construction site." Journal of the Korea Institute of Building Construction, JKIBC, 9(4), pp. 103-109. https://doi.org/10.5345/JKIC.2009.9.4.103
  11. Kim, Y.H., and Park, H.J. (2005). "Environmentally Friendly Remodeling of Interior Space : Implementation of Construction Process." Journal of Korean Institute of Interior Design, 14(6), pp. 270-279.
  12. Kim, Y.H., Lee, S.W., and Lee, J.S. (2009). "e-Learning Technology based on Mixed Reality." Electronics and telecommunications trends, 24(1), pp. 90-100. https://doi.org/10.22648/ETRI.2009.J.240110
  13. Lee, J.H., Han, S.H., and Cheon, S.U. (2009). "Recognition of Safety Sign Panel for Mixed Reality Application in a Factory Layout Planning." Korean Journal of Construction Engineering and Management, KICEM, 14(1), pp. 42-49.
  14. Lee, S.G. (2007). "Survey on Mixed Reality R&D." Journal of the Korea Computer Graphics Society, 13(2), pp. 1-15.
  15. Likert, R. (1932). "A technique for the measurement of attitudes." Archives of psychology.
  16. Min, J.H., and Choi, G.S. (2014). "Study on Color & Texture Image of Finishing Material by Interior Component - Centered on Interior Design Style Type-" Journal of Korean Society of color Studies, 28(4), pp. 75-87. https://doi.org/10.17289/jkscs.28.4.201411.75
  17. Park, D.J. (2010). "A Study on Application BIM for Project Parties Decision-Making Support of Construction Pre-Design." MS thesis, Dong-Eui Univ., Busan.
  18. Park, H.J., Seo, M.B., and Ju, K.B. (2019). "A Study on Development of Design Support Tool for Building 3D Printing." Journal of Korea Academia-Industrial cooperation Society, 20(12), pp. 182-189. https://doi.org/10.5762/KAIS.2019.20.12.182
  19. Webb, E.J. (1981). "Nonreactive measures in the social sciences." Houghton Mifflin School.
  20. Yoo, H.K., Kim, H.J., Kim, S.A., Hong, J.S., Lee, K.U.N., Kim, S.Y., and Lee, J.W. (2014). "AR Book Contents Authoring System on Augmented Reality." Journal of the Korea Institute of Information and Communication Engineering, 2014(6), pp. 1335-1337.
  21. Yoo, S.Y., Yi, J.S., Kim, S.B., Choi, S.I., Jang, H.S., and Jun, J.K. (2008). "A Study on the Integrated Management Methods of the Claim in Apartment Housing Project through Analysis of Moment of Truth." Architectural Institute of Korea, 24(4), pp. 161-171.
  22. Yu, C.S. (2017). "Analysis of Differences in Decision Making Process acoording to the Business Type and Role of Construction Project Clients." MS thesis, Hanyang Univ., Seoul.
  23. Zhao, X. (2017). "A scientometric review of global BIM research: Analysis and visualization." Automation in Construction, 80, pp. 37-47. https://doi.org/10.1016/j.autcon.2017.04.002