• Title/Summary/Keyword: 엔지니어링 전문가

Search Result 78, Processing Time 0.031 seconds

Fuzzy Rule Based Trajectory Control of Mobile Robot (이동용 로봇의 퍼지 기반 추적 제어)

  • Lee, Yun-Hyung;Jin, Gang-Gyoo;Choi, Hyeung-Sik;Park, Han-Il;Jang, Ha-Lyong;So, Myung-Ok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.34 no.1
    • /
    • pp.109-115
    • /
    • 2010
  • This paper deals with trajectory control of computer simulated mobile robot via fuzzy control. Mobile robot is controlled by Mamdani type fuzzy controller. Inputs of the fuzzy controller are angle between mobil robot and target, changed angle and output is the steering angle, which is control input. Fuzzy rules have seven rules and are selected by human experiential knowledge. Also we propose a scaling factors tuning scheme which is the another focus in designing fuzzy controller. In this paper, we adapt the RCGA which is well known in parameter optimization to adjust scaling factors. The simulation results show that the fuzzy control effectively realize trajectory stabilization of the mobile robot along a given reference target from various initial steering angles.

A Study on the Risk Reduction of Real Estate Development Projects and Improvement Schemes of Main Participant's Role - A Case Study Focused on Housing Development Projects - (부동산 개발사업의 리스크 저감 및 사업 주체간 역할의 개선방안에 관한 연구 - 주택개발사업을 중심으로 한 사례연구 -)

  • Roh Jae-Hyun;Hwang Uk-Sun;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.135-143
    • /
    • 2005
  • The purpose of this study is to diminish the risk through identifying the risk factors occurring in the process of real estate development projects, and analyzing and coping with the risk factors, and enable stable advance in the development process by improving the roles and work distribution of the project investor. The results of this study are as follows : 1) identifying the risks of contractions from the step of selecting the sites must be made possible through supplemental human resources expertise in plan and construction of the operation 2) as an improvement scheme, heightening the penetration wall of development projects from the investors, proposing a registration law and a selection standard of construction companies to investors' cooperating companies enabling the growth of superior investors.

Direction to Produce International Owner's Basic Specifications;Focus on Water Resource Projects (국제 전문시방서(영문) 작성방향;수자원개발사업을 중심으로)

  • Kim, Tae-Song;Koo, Jai-Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.624-627
    • /
    • 2006
  • This study is to establish the direction to produce owner's basic specifications (English version) necessary for producing project specifications available internationally in the projects to develop water resources. The principal conclusions of this study are as follows; (1) The original text necessary for producing the international owner's basic specifications should be specifications of one part between northern America and Europe. (2) The work break down structure of the international owner's basic specifications shall be conform to the international break down structure of specifications, and the MasterFormat(2004) of CSI is recommended. (3) The construction management methods, for example, as to standards, laws, and etc. in the international owner's basic specifications should be available internationally.

  • PDF

A Study on the Collaboration of User Interface Design for Software Developments (소프트웨어개발을 위한 사용자 인터페이스 디자인 협동작업에 관한 연구)

  • 김소영
    • Archives of design research
    • /
    • v.12 no.1
    • /
    • pp.15-24
    • /
    • 1999
  • The deVelopment of technologies changes the thinking of people and the ways of IMngs. The software developers as well as users are now aware of the importance of graphic user interface design, and the usage of graphic elements is getting rrore and more easier due to the technological improvements based on the windows system(Microsoft). For these reasons, people who engaged in software developments do much more efforts to get user-oentered design solutions, in other words, the usability improvements. And the interdisciplinary projects teams which consist of experts of various fields are increasing in number. But, the lack of understanding on software developments and the proceeding of design work without the consideration of entire process of a project make interface design work difficult. For exampIe, some engineers often think designers as persons who decorate their products in the final stage. In this thesis, through the investigation of user interface design and software development process, the frarnework of effective team projects is proposed. The main purposes of this thesis are to define the work area and position of designers and to propose the interface design process for the cooperative software development projects within the interdiociplinary teams.

  • PDF

The Analysis of the Weights of Country Risk by Participants of Overseas Construction Projects (건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석)

  • An, Byung-Ho;Kim, Jin-Eon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.150-159
    • /
    • 2013
  • The government has focused on activation of overseas construction projects and strengthening competitiveness in the long term. In recent years Public construction contract as well as design, engineering, construction management(CM) are gradually expanding into other countries, but risk analysis cases in the field are slight. In this study, We utilized PI scale and drew a conclusion about the importance of overseas risk by participants. We compared its features from the risk factor based on Risk Matrix. As a result of this study total of 6 section 31 Country Risk factors for the importance of overseas risk by participants were drawn, and the key risk factors (17 constructor, 14 designers, 17 CMr) based on Risk Matrix were derived. By utilizing the result of this study will be used as the basic data for establishing risk management strategy to meet each business and planning evaluation model.

A Study on the RPA Module Implementation of Cloud Travel and Expense Management System (클라우드 경비지출관리 솔루션의 RPA 모듈 구현에 관한 연구)

  • Lee, In-Sung;Oh, In-Ha
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.4
    • /
    • pp.46-54
    • /
    • 2021
  • As the realization of the 4th industrial revolution is approaching, the paradigm of the corporate work environment is changing to digital, from the traditional work environment. In particular, technologies like RPA(robotic process automation) and chatbot reduce the need for human labor or task by automating simple repetitive tasks, enabling humans to focus on more valuable tasks. In this study, corporates operating expense management services in public cloud computing environments develop a cloud module that simplifies expense report management by grafting robotic process automation and chatbot technology. According to the result of the expert evaluation, the developed system marked 80.3% of satisfaction levels and the highest satisfaction level 94% was confirmed in terms of easy of use. Based on the research result, future research can be suggested to expand the works occurring inside and outside the company to a single RPA environment by additionally linking the work system related to expense management.

Development of Configuration Management Methodology for Rocket Development Test Facilities (발사체 개발 시험시설의 형상관리 방법론 개발)

  • Jeon, Chanmin;Choi, Minchan;Park, Taekeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.31-41
    • /
    • 2023
  • This study is a study to develop a configuration management methodology for efficient and systematic management in the event of configuration changes such as deformation, explosion, and remodeling of launch vehicle development test facilities, which are emerging as important national facilities in the era of full-scale space competition. Through the analysis of international standards for configuration management, a configuration management process framework to be applied to launch vehicle development test facilities is extracted, a survey was conducted on experts who performed life cycle engineering of launch vehicle development test facilities, and a configuration management methodology optimized for operation/management of domestic launch vehicle development test facilities was proposed. Identify the configuration for launch vehicle development test facilities, the configuration management manager, configuration management organization, and configuration management board approve/process the configuration changes, and after construction is completed according to design requirements, launch vehicle development test facilities try to manage the configuration in a controlled state.

An Analysis of the Specialist's Preference for the Model of Park-Based Mixed-Use Districts in Securing Urban Parks and Green Spaces Via Private Development (민간개발 주도형 도시공원.녹지 확보를 위한 공원복합용도지구 모형에 대한 전문가 선호도 분석)

  • Lee, Jeung-Eun;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.6
    • /
    • pp.1-11
    • /
    • 2011
  • The research was aimed to verify the feasibility of the model of Park-Based Mixed-Use Districts(PBMUD) around urban large park to secure private-based urban parks through the revision of the urban zoning system. The PBMUD is a type of urban zoning district in which park-oriented land use is mixed with the urban land uses of residents, advertising, business, culture, education and research. The PBMUD, delineated from and based on a new paradigm of landscape urbanism, is a new urban strategy to secure urban parks and to cultivate urban regeneration around parks and green spaces to enhance the quality of the urban landscape and to ameliorate urban environmental disasters like climate change. This study performed a questionnaire survey and analysis after a review of literature related to PBMUD. The study looked for specialists in the fields of urban planning and landscape architecture such as officials, researchers and engineers to respond to the questionnaire, which asked about degree of preference. The conclusions of this study were as follows. Firstly, specialists prefer the PBMUD at 79.3% for to 20.7% against ratio, indicating the feasibility of the model of PBMUD. The second, the most preferable reasons for the model, were the possibility of securing park space around urban parks and green spaces that assures access to park and communication with each area. The third, the main reason for non-preference for the model, was a lack of understanding of PBMUD added to the problems of unprofitable laws and regulations related to urban planning and development. These proposed a revision of the related laws and regulations such as the laws for planning and use of national land, laws for architecture etc. The fourth, the most preferred type of PBMUD, was cultural use mixed with park use in every kind of mix of land use. The degree of preference was lower in the order of use of commercial, residential, business, and education(research) when mixed with park use. The number of mixed-use amenities with in the park was found to be an indicator determining preference. The greater the number, the lower was preference frequencies, especially when related to research and business use. The fifth, the preference frequencies of the more than 70% among the respondents to the mixed-use ratio between park use and the others, was in a ratio of 60% park use and 40% other urban use. These research results will help to launch new future research subjects on the revision of zoning regulations in the laws for the planning and uses of national land and architectural law as well as criteria and indicators of subdivision planning as related to a PBMUD model.

A Study on the Architectural Education System for Globalization (국제화시대에 대비한 우리나라 건축교육제도 개선 연구)

  • Yim Chang-Bok
    • Journal of Engineering Education Research
    • /
    • v.2 no.1
    • /
    • pp.39-50
    • /
    • 1999
  • In recent globalization era, Korean architectural education and profession are emerging as the fields with serious problems. There are two major reasons. One is an internal factor caused by Ministry of Education's full scale shift from department to faculty system. Due to the drastic change in this system, most of schools have serious difficulties to deliver the proper professional education. And the other is an external factor. In WTO era, Union of International Architects has adopted $\ulcorner$UIA Accord on Recommended International Standards of Professionalism In Architectural Practice$\lrcorner$. According to the education section of the Accord, it requires 5 years of professional education in the accredited school. So, if it is formally adopted in the Beijing Congress, which is scheduled to be held in June 1999, we may face very serious problems in architectural education. As mentioned above, with the present education system it is believed not easy to meet their new criteria. Within the present system, which does not have any mandatory relationship with professional licence, students might go on to diverse fields such as architectural design, structural engineering, construction management and building equipment engineering. However, if UIA Accord and Engineering Accreditation are required at the same time, it will not be easy to meet their new criteria with present architectural education system. The goal of this paper is to suggest the models to meet the standards of international community while keeping the strengths of existing systems.

  • PDF

Development of BIM-based Work Process Model in Construction Phase (시공단계의 BIM기반 건설사업관리 업무절차 모델 개발)

  • Yu, Yongsin;Jeong, Jiseong;Jung, Insu;Yoon, Hobin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.133-143
    • /
    • 2013
  • BIM can be utilized variously in construction management(CM) in the respect that it helps to manage comprehensively the construction information and make reliable decisions, but the adoption of BIM is insufficient in the CM area. The purpose of this study is to develop work process models and their guides in order to utilize BIM effectively in CM work at construction stage. This study defined BIM functions as 'BIM converting design', 'Model review', 'Data extraction', 'Automatic estimate', '4D simulation', 'Drawing creation', 'Engineering sector linkage analysis' through literature search, and generated CM works applicable to BIM by analyzing the CM work and process. This study developed BIM-based CM work process models by reconstructing the existing work process in connection with BIM function through an analysis on the relationship between BIM function and CM work, and reconstructing the role of each project participants. In order to improve the usefulness of the developed models, guides that described the BIM works of project participants were prepared through interviews and case studies. To validate the utilization of the models, a comparative analysis on the BIM process of precedent studies was also made and a survey was conducted on experts. This study can contribute to increasing the utilization of BIM in the CM area and can be helpful for CM companies to develop an in-house BIM guide. In the future, it will be necessary to make an assessment on the models from a business perspective through case applications and constantly update BIM-based CM work process model in consideration of the expansion of CM work due to the application of BIM.