Development of the Design Management Guidelines to Enhance the Capability of Public Clients (공공 발주자 역량 향상을 위한 설계관리 지침서 및 절차서 개발)

  • Shin, Kyoo-Chul;Park, Hyung-Keun;Lee, Young-Ho;Kwak, Jun-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.143-151
    • /
    • 2011
  • The process of design management by public client has not performed effectively due to lack of the formal guidelines and procedures in domestic public projects. The purpose of this research is to develop the guidelines and procedures of design management for public clients. The research methodology is to analyze current status of design management process in domestic and overseas cases and to develop the guidelines based on the administrative stages of design process along the project. The guidelines of design management developed by the design stages of pre-contract, contract, and post-contract stages to classify administrative procedures. The outcome of this research is able to be utilized by the public clients and design firms to standardize the process of design management and minimize potential risk during the process of the project.

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

Real-time Text Analysis with Dialogue State Tracking and Summarizing to Assist Emergency Call Reporting (긴급 신고 접수 지원을 위한 대화 상태 추적 및 요약 기반 실시간 텍스트 분석)

  • Oh, Kyo-Joong;Kim, Jinwon;Kim, Ilhoon;Lim, Chae-Gyun;Choi, Ho-Jin
    • Annual Conference on Human and Language Technology
    • /
    • 2021.10a
    • /
    • pp.16-21
    • /
    • 2021
  • 소방 본부의 119 종합상황실에서는 24시간 국민의 안전을 위해 긴급 신고를 접수한다. 수보사 분들은 24시간 교대 근무를 하며 신고 전화에 접수 및 응대 뿐만 아니라 출동, 지휘, 관제 업무를 함께 수행한다. 이 논문에서는 이 같은 수보사의 업무 지원을 위해 우리가 구축한 음성 인식과 결합된 실시간 텍스트 분석 시스템에 대해서 소개하고, 출동 지령서 자동 작성을 위한 키워드 검출 및 대화 요약 및 개체명 인식에 기반한 대화 상태 추척 방법에 대해 설명하고자 한다. 대화 요약 기술은 음성 인식 결과를 실시간으로 분석하여 중요한 키워드의 검출 및 지령서 자동 작성을 위한 후처리를 수행하며, 문장 수준에서 개체명 인식 및 관계 분석을 통한 목적 대화의 대화 상태 추적을 수행한다. 이 같은 응용 시스템은 딥러닝 및 기계학습 기반의 자연어 처리 시스템이 실시간으로 텍스트 분석을 수행할 수 있는 기술 수준이 되었음을 보여주며, 긴급한 상황에서 많은 신고 전화를 접수하는 수보사의 업무 효율 증진 뿐만 아니라, 정확하고 신속한 위치 파악으로 신고자를 도와주어 국민안전 증진에 도움을 줄 수 있을 것으로 기대된다.

  • PDF

감리업무수행지침서(하)

  • korea construction safety engineering association
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.12
    • /
    • pp.101-126
    • /
    • 1994
  • 정부에서는 건설산업의 부실요인을 근원적으로 제거하기 위하여 ‘부실공사방지대책’을 수립ㆍ확정하여 관련법령 및 규정을 개정하였는데 이 중 감리업무에 있어서 안전관리사항이 강화되었으며 ‘94. 1월부터 본대책의 핵심부분인 책임감리제도를 도입ㆍ시행하게 되었다. 이에 책임감리업무를 보다 효율적으로 수행할 수 있도록 건설기술관리법령에서 규정하지 못한 감리방법, 요령, 절차에 관한 세부적인 지침과 감리대가기준, 감리표준계약서 및 각종 보고서식등을 수록하여, 감리업무에 종사하는 일선실무자들이 이용하기 쉽도록 편집된 건설부 ’감리업무수행지침서‘를 본협회지 부록란에 2회에 걸쳐 수록하여 도움을 주고자 한다. 지난 11호(’94.봄호)에 (상)을 수록한 데 이어 본호(‘94. 여름호)에 (하)를 수록한다.

  • PDF

비즈니스 프로세스 서술도구 비교 : 은행 자산건전성 평가업무를 중심으로

  • An, Hyeon-Seop;Kim, Yong-Jae;Ham, Yu-Geun
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 2008.10b
    • /
    • pp.113-125
    • /
    • 2008
  • In developing information systems, omissions and redundancies of user requirements are too frequent to increase development cost as they need to be remedied at later stages. In order to cope with this problem, various tools describing business processes have been proposed in the past and yet fewer attempts have been made to systematically and categorically evaluate performance of individual tools describing business processes. In this paper, we offer a general framework for appraising competing tools for describing business processes, including ERD, DFD, and Use Case Diagram in terms of ease of use, completeness, chance of having omissions, and. Based on a exemplary business From the measures proposed in this paper for comparing descriptive tools, ERD turns out to stand out over other often-used methodologies. Despite its problem with poor readability, ERD proves to offer relatively higher expressive power and ease of use. Being supplemented by well-formed job descriptions, ERD would remain a better choice in developing business information systems.

  • PDF

전문가 조사 및 확인적 요인분석 기법을 활용한 지식경영과 업무 통합의 구성요인 도출 연구

  • Seo, Hyeon-Ju
    • 한국경영정보학회:학술대회논문집
    • /
    • 2008.06a
    • /
    • pp.276-281
    • /
    • 2008
  • 본 논문은 지식경영의 기술적 기반을 확보하고 숨어있던 지식을 명시화하여 공유하는 데 성과를 거두고 있는 지식경영 선도기업들이 지식경영 활동을 업무 성과와 직결시키기 위해 시도하고 있는 활동들에 주목한다. 지식경영이 업무와 별개로 이루어지는 것이 아니라 업무 프로세스와 통합되기 위해 필요한 요인들을 탐색하기 위해 우선 현장 전문가들을 대상으로 조사를 실시하였고, 그 결과를 반영한 설문지를 바탕으로 지식경영 사용자들을 대상으로 조사를 실시한 후 확인적 요인분석 기법을 활용하여 각 요인들의 타당성을 검증하였다.

  • PDF