• Title/Summary/Keyword: 양중관리

Search Result 77, Processing Time 0.02 seconds

Decision Support Model for Selecting of Lifting Methods for Large Spatial Roof Construction (대공간 지붕철골공사 양중공법 선정을 위한 의사결정지원모델)

  • Cha, Min-Su;Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.489-498
    • /
    • 2018
  • The purpose of this study was to propose a decision support model for selecting a lifting method of large spatial roof construction. First, we deducted influential factors consist of 6 factors and 19 sub-factors through literature reviews and expert's advices. Second, the relative importance of each factor was calculated by Analytic Hierarchy Process. As a result, 'site condition(0.237)' among 6 factors and 'available space of the site(0.118)' among 19 sub-factors were identified as the most important factor for selecting lifting method. In addition, methods and procedures were established for evaluating alternatives of lifting methods for each influential factor. A decision support model was completed by providing the Site Suitability Index(SSI) of each lifting method. Finally, we got advices form experts who were actually in charge of the works for large spatial construction project to validate the model. The model proposed in this study was analyzed to be useful in selecting the lifting method. The findings of this study are expected to support the decision making of on-site managers when they select the lifting method on the beginning of the project.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building (센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발)

  • Shin, Joong-Hwan;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.153-163
    • /
    • 2013
  • As recent buildings have been more higher and larger, construction vertical lifting planning and operation is a key factor for successful project in tall building. Although many studies have been trying to set up a construction lifting planning system at early stage, there's not existing a control real-time lift operation control system with respect to during construction stage. Therefore, In this study, we use the sensor device to collect the lift operating data for improvement of lift operation efficiency and develope optimum lift operating system which can perform real-time analysis. Finally, we verify the efficiency of proposed system through comparison between realtime operating data and simulated data using proposing system. In this paper, the proposed system show more efficient moving line compared with previous system. This can contribute to development of unmanned lift system.

Optimization of Multiple Tower Cranes and Material Stockyards Layout (다중 양중장비와 자재 야적 위치의 최적 결정을 위한 모델 개발)

  • Kim, Kyong-Ju;Kim, Kyoung-Min;Lee, Sang-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.127-134
    • /
    • 2009
  • This study aims to provide an optimal model for the layout of multiple tower cranes and material stockyards which have multiple candidate positions. In a high-rise building construction, the positional allocation of tower cranes and material stockyard has an effect on the travel time of material hauling. In addition, in case of using multiple tower cranes, specific location of a tower crane allocated to each material determines the efficiency of the works. Current optimal model limited to the optimization of position of single tower crane and material stockyards. This study suggests optimal model both for the positions of multiple tower cranes and material stockyards. Layout of multiple tower cranes requires additional allocation of each crane to each material hauling and control on the minimum distance between tower cranes. This optimization model utilizes genetic algorithm to deal with complex interaction on the candidate positions of multiple tower cranes, material stockyards, and types of materials. In order to identify its utility, case study was performed.

A Study on Analysis and Improvement of Furniture Work for Just-in-Time (적시생산방식을 이용한 가구공사 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Ahn Jae-Bong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.71-78
    • /
    • 2004
  • In this study, the concept of Just-In-Time, Lean Construction and Supply Chain Management have been applied to furniture works of high-rise residental building. For the purpose of systematic furniture work planning, it should be established to analyse furniture-work process from design phase through contract, and procurement to construction phase. The analysis of process and data for furniture-work provides the roles of conducting subjects and presents management items at each phase. This proposal will provide the systematic furniture-work managements and reduce construction time and cost, and also raise the quality of furniture works.

Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction (모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출)

  • Kim, Min Ju;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.211-212
    • /
    • 2015
  • Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).

  • PDF

A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning (양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.

A Decision-Making Model of Integrated Vertical and Horizontal Move Plan for Finishing Material in Righ-Rise Building Construction (고층건물공사 마감자재의 수직$\cdot$수평이동계획이 통합된 의사결정모델)

  • Ahn Byung-Ju;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.47-58
    • /
    • 2001
  • Of all the site logistics technologies in high-rise building construction, both vertical and horizontal move plan, are the most imperative factors. And the horizontal plan follows lift-up plan as of the vertical plan. However though it may be, temporary lifts on site are numbered by heuristic formulas. The quantity of finishing material cannot be converted into lift-up load per finishing material. The lift-up plan cannot be evaluated the feasibility for finishing material move plan by a reasonable evaluation methodology. The horizontal plan is far from the vertical one. And the information as an input data for the horizontal plan is devoid of package unit size, length, and volume per finishing material. These can hardly result in reasonable and detail decision on how much to use temporary lifts, how long to use these, and where to deposit each finishing material. Therefore, this study is to suggest a decision-making model that can integrate vertical and horizontal material move plan in high-rise building construction and make a decision the plans systematically. And the study is to explain the concept, methodology, and contents of the model applied to a virtual project, named as MT 130 (Millennium Tower 130). By the model, the planner can shift his/her thinking framework on site logistics management products-oriented Into process-oriented. He/she can manage a project by the framework as system thinking, evaluate the feasibility of a lift-up plan, and decide the horizontal plan integrated with the lift-up.

  • PDF

The Optimization Algorithm for Wall Bracing Supports of Tower Cranes (타워크레인의 횡지지 최적설계 알고리즘 개발)

  • Lee, Hyun-Min;Ho, Jong-Kwan;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.130-141
    • /
    • 2010
  • Poor expertise in equipment operation and installation, coupled with unpredictable natural disaster, usually directly leads to disastrous accidents of large lifting equipment such as tower cranes. For example, 52 tower cranes fell down due to the unstable support in Korea at the attack of Typhoon "Maemi" in 2003, which damaged property and caused loss of life. In high-rise construction projects, top-slewing or luffing-jib tower cranes needs checking the stability of lateral-support in addition to the bottom support such as the foundation. In this study, the optimization algorithm for lateral-support of tower cranes is conducted, which is expected to enhance the structural stability of tower cranes and save the cost in conflict with the safety.

Efficiency Analysis of Tower Crane Lifting Work for Project Management of Construction (건축공사의 공정관리를 위한 타워크레인 양중 효율성 분석)

  • Bae, Jeong-Hyeon;Kim, Ki-Hyuk;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.2
    • /
    • pp.63-69
    • /
    • 2019
  • Building Construction projects are getting higher and larger. Therefore, the use of Tower Crane, which is more productive than any other lifting plan shows a trend of continuous increases. However as equipment for transporting heavy goods, are is too expensive for the monthly rent and used inefficiently for construction. site so it is analyzed that it has problems of reducing productivity and efficiency of lifting work. Inefficient situations are arising like poor communications between operator and worker, occurrence of blind spots, securing the shortest distance of fire during movement after lifting plan, influences of weather, location of materials, movement radius of tower crane by each locations and ever-changing working environments. Therefore, in this study, we first made a list of tower cranes that are inefficiently used at the site, and then we made a checklist. After that, through field visits, we derived checklist for Tower Crane to comprehensive data value.