• Title/Summary/Keyword: 실비

Search Result 127, Processing Time 0.02 seconds

Feasibility Analysis of Introducing CM at Risk Delivery Method to the Korean Public Construction Industry by Analyzing Attributes of the Projects (대상공사의 특성요인 적합도 분석에 의한 공공부문 'CM at Risk 방식' 도입의 타당성 분석)

  • Koh, Min-Hyeok;Kim, Yea-Sang;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.3-14
    • /
    • 2010
  • A high degree of management skills and functions is essential to the success of construction projects. While the various construction management delivery methods have been realized as the solutions, Korean government is planning to introduce 'CM at Risk Method' to the public construction projects. However, even if its effect has been verified successful in the international market, it must be considered before legally adapting the method that it would be suitable to our public sector, In this respect, the purpose of this study is to evaluate and analyze feasibility of 'CM at Risk Method'. In order to do that, 15 attributes of construction projects were found, which were suitable to 'CM at Risk Method' in general, 'CM at Risk-GMP Method', and 'CM at Risk-Cost Reimbursable Method' and suitability of each attribute to each of 9 categories of public construction facilities was evaluated by questionnaire survey to CM specialists. Results showed that 'CM at Risk Method' might not bring improper effect to the industry but due to the characteristic of public sector, the effect would be very limited.

Study on the Fish Community in the Seagrass Belt around Cheju Island I. Species composition and seasonal variations offish community (제주도 연안 해초지대의 어류군집에 관한연구 I. 종조성과 계절변화)

  • Go, You-Bong;Cho, Sung-Hwan
    • Korean Journal of Ichthyology
    • /
    • v.9 no.1
    • /
    • pp.48-60
    • /
    • 1997
  • The species composition and seasonal variations of fish community in the Zostera marina belt at the coastal water off Hamduck, northern part of Cheju Island, were analyzed based on day and night samples collected by a small beam trawl from May 1993 to May 1994. The dominant species among the 58 fish species in 35 family were tubesnout, Aulichthys japonicus, gobie, Pterogobius zonoleucus, filefish, Rudarius ercodes, pipefish, Syngnathus schlegeli and sea catfish, Plotosus lineatus. These species comprised 86.1% in the number of individuals and 62% in biomass. The number of individuals and biomass were high between October and December, and low between January and April. About 90% of fishes were noncommercial and small-sized fishes, less than 14cm in total length. The larvae and juvenile fishes were collected in the study area throughout the year. The recruitments of dominant species were related to the seasonal variations of Z. marina utilized as a shelter or feeding ground. A japonicus, P. zonoleucus, Zoarchias glaber and Hexagrammos agrammus recruited between January and June, and R. ercodes, S. schlegeli, P. lineatus and Petroscirtes breviceps between July and December.

  • PDF

Species Composition of Fish Assemblages in Eelgrass Bed of Myeongsa on Geoje Island, Korea (경남 거제 명사 잘피밭의 어류군집에 관한 연구)

  • Kim, Jun-Sop;Lee, Dae-Hee;Park, Jun-Su;Han, Dong-Hun;Gwak, Woo-Seok
    • Korean Journal of Ichthyology
    • /
    • v.23 no.2
    • /
    • pp.119-127
    • /
    • 2011
  • Fish species composition in eelgrass bed of Geoje island, Korea was determined using monthly samples collected by a surf net from August 2009 to July 2010. A total of 31 species, 1,387 individuals and 4,776.5 g of fishes were collected. The dominant species were Rudarius ercodes, Gymnogobius heptacanthus, Ditrema temminckii, Takifugu niphobles, Hypodytes rubripinnis, Chaenogobius annularis, Aulichthys japonicus, Syngnathus schlegeli, Pterogobius elapoides which accounted for 89.3% of total number of individuals of fish collected. Eelgrass biomass showed a peak in August (DW 154 g/$m^2$), low values in November (DW 31 g/$m^2$) to February (DW 41 g/$m^2$), and started growing from May (DW 78 g/$m^2$). The biomass of fish increased by the catch of a large number of Gymnogobius heptacanthus, Chaenogobius annularis, Pterogobius elapoides, Rudarius ercodes and Pseudoblennius percoides in May and September when the eelgrass grew fast. Meanwhile, Syngnathus schlegeli, Urocampus nanus and Aulichthys japonicus were collected year-round with no clear relationship to the biomass of eelgrass bed.

A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects (공공건설공사의 공기연장에 따른 추가간접비 산출을 위한 요율방식 제안)

  • Lee, Seung-Joon;Cha, Yongwoon;Han, Sangwon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.79-90
    • /
    • 2021
  • In domestic public construction, disputes are increasing due to differences among stakeholders regarding contract price adjustment. In particular, the actual cost-plus fee for overhead costs due to the schedule extension cannot be agreed upon at the administrative phase, and most of them seek judicial judgment. Thus, this study aims to propose a 'sufficiently satisfactory' alternative to reach an agreement before disputes in order to minimize disputes related to the calculation of additional overhead costs. To this end, this study proposes three alternatives based on the rate method. Firstly, when calculating additional overhead costs, it is not calculated as an actual cost-plus-fee method, but as a rate compared to direct labor costs among net direct costs. Secondly, the calculated indirect labor costs are compensated for up to the legal maximum of legal limit costs such as general management costs, profits and so on. Thirdly, it reflects overhead costs increased or decreased due to change orders. Risks were analyzed by collecting expert opinions on the proposed methods and applying actual cases. Finally, as a result of investigating the level of consensus for each stakeholder, it was confirmed that all stakeholders could agree regardless of the size of the company. The result of this study is expected to as a useful tool among stakeholders in the construction fields that can be able to easily agreed upon.

Improvement of CM Fee Estimation Criteria for Efficient CM Service (건설사업관리업무 효율화를 위한 대가 산출기준 개선방향)

  • Cho, Youngjun;Sung, Youngmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.105-112
    • /
    • 2019
  • As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

Strategies to Improve Use of Medicines (의약품의 적정 사용을 위한 전략)

  • Park, Sylvia
    • Quality Improvement in Health Care
    • /
    • v.12 no.2
    • /
    • pp.93-112
    • /
    • 2006
  • This study reviewed published studies on interventions used by hospitals, health insurance programs, or governments to improve use of medicines in foreign countries. Interventions to improve use of medicines are classified into two categories: 1) information strategies-dissemination of educational materials, group education, one-to-one educational outreach, drug utilization review, and feedback; 2) managerial strategies- formularies, prior authorization, and financial incentives. Dissemination of educational materials, which is a common intervention, was unsuccessful in changing physicians' prescribing behaviors. Problem-based small group education was more likely to change behaviors than didactic large group education. One-to-one educational outreach(academic detailing) was among the most effective strategies used to change prescribing behaviors. Prospective drug utilization review (DUR) program was more successful in improving use of medicines than retrospective DUR program. Feedback intervention has been reported to be ineffective to change behaviors. Formularies are frequently used to control medication use by most health insurance programs. Financial incentives provide physicians economic incentives according to appropriateness of prescribing. However, few published studies have assessed the efficacy of formularies or financial incentives. Prior authorization requires physicians to get authorization from health insurers before prescribing a certain group of drugs which is usually of high costs or risk. There is no magic bullet for quality use of medicines. Multifaceted interventions that help to predispose, enable, and reinforce desired behaviors are more likely to be successful.

  • PDF

A Study on the Efficient Energy & Manpower Management in Post Office Building : Focused on Introduction of Total Resource Group Management System (우정건축물(郵政建築物)의 효율적(效率的)인 에너지 및 인력(人力) 관리(管理) 방안(方案) - 통합 자원 군(群) 관리시스템의 도입을 중심으로 -)

  • Gang, Oh-Sik;Lee, Sang-Joong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.25-30
    • /
    • 2007
  • Most part of the energy consumption of MIC(Ministry of Information and Communication) is mainly due to operation/maintenance of the post office buildings. In this paper, the pattern of energy consumption & operating status in post office buildings in Korea is analyzed. The authors suggest integrated and grouped management of the dispersed post office buildings using internet, through which we can expect increased efficiency.

  • PDF

The Effects of Yukmijihwang-tang, Taeksa-tang, Silbi-um on Mesangial cell Proliferation, Fibronectin Synthesis, MHC-class II Expression (육미지황탕(六味地黃湯),택사탕(澤瀉湯), 실비음(實脾飮)이 메산지움세포 증식, Fibronectin 합성 및 MHC-class II 발현에 미치는 영향(影響))

  • Ahn, Sae-Young;Doo, Ho-Kyung;Lee, Jin-Sin
    • The Journal of Internal Korean Medicine
    • /
    • v.21 no.3
    • /
    • pp.433-441
    • /
    • 2000
  • Objective : To analyze the effects of Yukmijihwang-tang, Taeksa-tang, Silbi-um on mesangial cell proliferation, fibronectin synthesis and MHC-class II expression. Methods : Laboratory studies were performed with the method of surface enzyme immunoassays or flow cytometry after addition of peripheral blood mononuclear cells(PBMC) supernatants treated with medications using the cultured human mesangial cells. Results : 1. Silbi-um produces more suppressive effect than control group and hydrocortisone group on the mesangial cell proliferation. In Yukmijihwang-tang, Taeksa-tang and Silbi-um, mesangial cell proliferation significantly decreased than in hydrocortisone group 2. In the 'without fetal bovine serum' study, Yukmijihwang-tang take more suppressive effect than Control group on the fibronectin synthesis. In the 'with fetal bovine serum' study, Yukmijihwang-tang, Taeksa-tang, Silbi-um all have suppressive effect, but it hasn' t any statistical significance. 3. Yukmijihwang-tang, Taeksa-tang, Silbi-um all have a suppressive effect on the MHC-class II expression. Conclusions : Herb medicine generally show a suppressive effect on the suppression of the mesangial cell proliferation, fibronectin synthesis and MHC-class II expression.

  • PDF

The Design of Master Station for Intelligent Distribution Automation System (배전지능화시스템 개발을 위한 중앙제어장치 설계)

  • Park, Shin-Yeol;Ha, Bok-Nam;Shin, Chang-Hoon;Kwon, Seong-Chul;Park, So-Young
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.261-263
    • /
    • 2006
  • 전력 계통은 발전설비, 송전설비, 변전설비, 배전설비 등으로 크게 나눌 수 있다. 전력계통을 구성하는 이런 설비들을 원격 감시하고 제어하는 시스템을 전력자동화 시스템이라고 한다. 이런 전력자동화 시스템은 국내 전체 에너지의 수요, 공급, 수송을 제어하는 에너지 관리시스템(EMS : Energy Management System), 송전 및 변전설비의 감시제어를 담당하는 송변전소 감시제어 시스템(SCADA : Supervisory Control And Data Acquisition), 배전계통의 실비관리 및 운영을 담당하는 배전자동화시스템(DAS : Distribution Automation System), 수용가의 계량기를 원격으로 읽어오는 원격검침시스템 (AMR : Automatic Meter Reading) 통으로 구성되어 있다. 국내에서 운용중인 배전자동화 시스템은 배전선로에 설치되어 있는 개폐기만을 원격 감시 및 제어 하는 보편적인 시스템이다. 한편, 2005년도 전력IT 국가 전략과제로 수행하고 있는 배전지능화 시스템 개발 과제에서는 변전소부터 배전계통과 수용가까지의 모든 전력 설비에 대한 원격감시제어가 가능한 시스템을 배전지능화 시스템이라고 정의하고 이의 개발을 추진하고 있다. 본 논문에서는 ABB, SIEMENS, GE와 같은 국외의 배전 자동화 시스템들을 소개하고, 배전지능화 시스템에서 목표로 하고 있는 GIS 기반 위에서 고 저압 배전설비를 관리하고, SCADA, DAS, GIS(Geographic Information System), AMR, TCS(Trouble Call System) 등 배전지능화 시스템의 중앙제어장치가 갖추어야 하는 주요 기능들에 대해 기술하고자 한다.

  • PDF