• Title/Summary/Keyword: 시공 방법

Search Result 2,442, Processing Time 0.027 seconds

Evaluation of Installation Damage Factor for Geogrid using Maximum Particle Size of Backfill Material (뒤채움 최대입도를 이용한 지오그리드 보강재의 시공손상계수 산정 방법)

  • Kim, Kyung-Suk;Choi, Young-Chul;Kim, Tae-Soo;Lim, Seoung-Yoon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.6 no.4
    • /
    • pp.29-37
    • /
    • 2007
  • Reduction Factor for Installation Damage required for calculation of design strength of geogrid used in MSEW(mechanically stabilized earth wall) design is usually obtained in the field test simulating real construction condition. However, damages occurred in geogrid during backfill work are influenced by many factors such as polymer types, unit weight per area, backfill construction method and gradation of backfill material and field test considering these factors demands lots of time and costs. In this study, factors affecting installation damage are analyzed and empirical method for evaluating reduction factor for installation damage using maximum particle size in backfill material is suggested.

  • PDF

Hanger Tension Variation of Self-Anchored Suspension Bridge in Construction (시공중 자정식 현수교의 행거 장력변화)

  • Kim, Ho Kyung;Suh, Jeong In
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.6
    • /
    • pp.1309-1317
    • /
    • 1994
  • Because the stiffening girders are constructed after the installation of hangers for typical suspension bridge, no additional tensioning to hangers in construction is necessary for this bridge type in which main cable is earth-anchored. However, for self-anchored suspension bridge, hangers are installed after temporarily supporting stiffening girders constructed in previous stage. Therefore, initial tension is required on installing hangers. Tension of hangers varies as the construction proceeds. Hence, it is necessary to determine the most efficient method of installing hangers among several methods. This study presents finite element procedures and the algorithms of construction stage analysis to simulate construction processes. Geometric nonlinear analysis scheme is also included. The most effective method regarding the installation of hangers is presented through the examples of actual bridge model.

  • PDF

Verification and Improvement of Structural Behavior Response Performance Evaluation Method for the Standard Establishment of Adhesive Composite Waterproofing Sheets (점착형 복합 방수시트의 표준(안)제정을 위한 구조물 거동대응성능 시험방법 개선 및 검증 평가 연구)

  • Kim, Soo-Yeon;Park, Jong-Sun;Oh, Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.377-386
    • /
    • 2021
  • In April 2019, this study was enacted as a test method for the performance of waterproof layers in an environment where complex deterioration and structural behavior are simultaneously applied, but some existing standards were implemented to point out the errors of the method that should be supplemented. Thus, in establishing standards for (tentative) adhesive waterproofing sheets, field workability and quantification of test results were studied on the structural behavior response performance test methods included as test items. In addition, the performance evaluation of adhesive-type composite waterproof sheets was conducted based on the considered contents to review improvements such as applicability as an item of standard standards and field workability related problems.

A Study on the Success Model for Design-Build Delivery Method Process (설계시공일괄방식 프로세스 성공모델에 관한 연구)

  • Kim Jeong-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.119-127
    • /
    • 2003
  • Among project delivery methods, Design-Build method is becoming an increasingly preferable alternative to traditional contracting method. The Design-Build delivery method was first introduced in Korea, 1975. But it still has been producing many problems. The previous researches had been suggested several ways to improve the Design-Build project delivery but it seemed to have had no effect whatsoever. This research proposes the success model for Design-Build delivery method through the 4 steps. First, find the proper modeling method. Second, establish the As-Is model for analyzing the circumstances of Design-Build method. Third, to begin with analyzing the As-Is Design-Build model and previous researches, establish the problem model. Finally, find success factors and circumstances through the overseas Design-Build system, and then establish the success Design-Build model.

Construction Sequence Analysis for Checking Stability in Complex-Shaped High-Rise Building under Construction (비정형 초고층 건물의 시공 중 안정성 검토를 위한 시공단계해석)

  • Jang, Dong-Woon;Kang, Ji-Hun;Chea, Seung-Yun;Eom, Tae-Sung;Kim, Jae-Yo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.263-266
    • /
    • 2010
  • 비정형 형상의 초고층 건물이 증가함에 따라, 설계 시공 계획 단계에서의 시공 중 건물의 구조적 안정성 검토가 핵심 사항으로 부각되고 있다. 시공 중 비정형 초고층 건물의 안정성을 확보하기 위해서는, 횡력저항시스템이 완전히 형성되기 전 구조체 자중의 불균형 분포에 의해 발생하는 수직부재의 불균등 축소, 골조의 기울어짐 혹은 횡변위 등이 시공단계해석에 의하여 검토되어야 하며, 시공단계해석은 구조건전성모니터링, 시공 보정 프로그램, 시공계획 수립 등과 체계적으로 결합되어 진행되어야 한다. 이 논문은 시공 중 비정형 초고층 건물의 구조 안정성 검토를 위하여, 실제 비정형 초고층 프로젝트에 시공단계해석을 적용하였으며, 시공 중 초고층 건물의 안정성 확보를 위한 주요 검토 항목 및 방법을 제시하였다.

  • PDF

Simulation Function of Railway Station Project by Virtual Construction Technology (가상건설기법에 의한 철도역사 시설물 시공시뮬레이션 기능 구축)

  • Kang, Leen-Seok;Moon, Jin-Seok;Kwon, Jung-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.433-440
    • /
    • 2008
  • Virtual construction methodology enables to construct project facility from design phase to construction phase in 3D virtual environment. It is a technique that can solve problems of construction in virtual construction process. This study suggests some methodologies of virtual construction and developed a system for a railway station in Honam express railway project based on suggested methodologies. This study developed layout review and layer simulation functions. Those functions can improve the effectiveness of 3D simulation and the virtual construction system can be used as a verification tool for construction process of various construction projects.

How Different Material of Wood Deck Impact Workability and Defect Occurrence (목재데크 소재의 차이가 시공성 및 하자발생에 미치는 영향)

  • LEE, Hyukjae
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.1
    • /
    • pp.463-469
    • /
    • 2020
  • People enjoy more leisure time these days as the government introduced the workweek last year and there is a growing interest on living healthy life. Amidst such change in society, trekking in forest has gained popularity along more people spending leisure time by walking for health. As a result, there are many scenic trails being built using wood deck. Usually certain parts of trails are built with wood deck where the path maybe too dangerous for walking or where nature needs to be protected. However wood material used for deck is easily prone to defects which can lead to safety issues. This study aims to understand the differences by materials used for wood deck and to investigate a link between different materials used and causes for defect occurrence. And further, the study aims to identify materials and construction methods for high workability and safety. The study was able to conclude that different materials used and different construction methods of applied for wood deck yield different results in terms of workability and defect occurrence.

Current Status and Appropriate Check Method of Construction Quality Control for Rebar Coupler Splice (철근 커플러이음의 시공품질 확인 현황 및 적정 시공품질 확인 방안)

  • Kim, Ju-Yong;Kim, Jin-Dong;Lee, Young-Do;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.531-542
    • /
    • 2022
  • As buildings become taller, the strength of structural materials must increase and the amount of rebar reinforcement also increases while the application of an appropriate rebar splice method in the construction process become one of the essential factors. In this research, the current status of quality check for rebar coupler is identified by an expert questionnaire and an appropriate quality check method is proposed through a quality test on specimens similar to actual on-site construction. In the test results, it was revealed that, among the quality check methods for rebar coupler joints, the coupler tightening method and face to face degree of between upper and lower rebar did not affect the strength the specimen. Therefore, it is considered to be an appropriate way to check the coupler quality check to check whether the threads are completely assembled during on-site construction through manufacture the number of threads of rebar and coupler with a margin beyond the calculated thread number.

A Study on the Near Construction Range Considering the Factors Affecting the Stability of Water Tunnel (수로터널 안정성에 미치는 요소를 고려한 근접시공범위에 대한 연구)

  • Mingyu Lee;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.5
    • /
    • pp.5-12
    • /
    • 2023
  • Recently, due to urban development and expansion, construction plans have been increasing adjacent to existing tunnel structures such as subways, roads, and large pipelines. Structural plans adjacent to existing tunnels have different effects on tunnel stability depending on the construction method, degree of proximity, and location of new structures. In particular, the pressure water tunnel shows a very large difference from other road tunnels and railway tunnels in geotechnical characteristics and operation characteristics. Therefore, it is necessary to review the safety zone due to adjacent construction in consideration of the geotechnical characteristics of the water tunnel and the new sturure construction method. In this study, the existing tunnel safety zone standards were investigated. A stability evaluation performed numerical analysis considering the deterioration of concrete lining in operation and the characteristics of water tunnel. In addition, the impact of vibration caused by pile construction and blasting excavation of new structures was reviewed. Based on this, a pressure water tunnel safety zone was proposed in consideration of adjacent construction.

Experimental Study on the Behavior of Building Hardware with Joint Details (접합 방법에 따른 하지철물 구조물의 거동에 관한 실험적 연구)

  • Hong, Seonguk;Kim, Seunghun;Baek, Kiyoul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.190-198
    • /
    • 2018
  • In recent years, non-welded building hardware has been installed by bolt assembly is used. The non-welded building hardware method can reduce accidents caused by welding, and can be constructed by bolt assembly, which can reduce labor costs and shorten the construction period. However, there is a need for a method to compensate for the occurrence of buckling at the time of construction. The purpose of this study is to evaluate the behavior of joints between steel pipe and fastener and to evaluate the behavior of joints of non-welded and welded hardware frame. As a result, it was found that the foundation steel structure without welded joints was deformed to a rotation angle of member much larger than the allowable interlayer displacement angle 0.01 to 0.02 required according to the seismic load rating in the seismic load resistance system.