• Title/Summary/Keyword: 시공프로세스

Search Result 336, Processing Time 0.026 seconds

Ineffective Factors that Lie on the Detailed Design Processes of the Major Domestic EPC Companies (EPC업체의 상세설계 프로세스상의 문제점 분석)

  • Goh, Yoon-Hyuck;Cha, Hun-Ju;Chin, Mee-Youn;Choi, Jong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.155-158
    • /
    • 2006
  • This study aims to uncover the problems that are embedded on the detailed design processes of the major domestic EPC companies. To set the research frame, previous studies were analyzed and interviews were conducted for the industry experts. To draw fundamental factors that may affect on the effectiveness of detailed design processes, questionnaire surveys were conducted to those who involved in detailed design and who have design experiences. Analysis results indicated that there are rooms for improvement on the detailed design processes. This study will be a guidance for future researches that must be followed.

  • PDF

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

A study of Building Mix-Design and Construction Process to Reduce the Combined Deterioration of Plain Concrete. (옥상 무근콘크리트 복합열화 방지를 위한 시공 프로세스 구축 및 배합 설계에 관한 연구)

  • Kim, Dae-Geon;Lee, Woo-Geun;Kang, Ye-Jin;Yeo, Dong-Kyu;Kim, Do-Hun;Lee, Dong-Oun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.85-86
    • /
    • 2018
  • In the case where the building's rooftop was laid without any foundation, the combined deterioration, such as the repetition of shrinkage and expansion caused by temperature changes, caused further cost generation and damage. To prevent this, the concrete mixing design and construction process shall be established to resist combined deterioration.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

A Study of the Identify about Scheduling Process at Owner's Position (IDEF 방법론을 이용한 발주자 공정관리 프로세스 규명에 관한 연구)

  • Lee Tai Sik;Kim Young Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.454-457
    • /
    • 2001
  • All of the partner must manage continually scheduling for the successful project in construction. Besides, that is not a important only contracter's managing but also owner's managing which is a very important about project finishing in time. Especially, in the case of mega project, the owner has to manage progress of scheduling to control contractor. And the case of progress to delay or to change, owner, contractor, and inspector must make a plan of recovery scheduling. This study proposes a construction process model from IDEF Methodology.

  • PDF

Construction Process Modelling Method Improving the Traceability of ICT Applications (ICT 적용 추적성 개선을 위한 시공관리 프로세스 모델링)

  • Go, Taeyong;Lim, Taekyung;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.114-123
    • /
    • 2019
  • Tracking ICT applications on construction business processes is critical to the success of ICT-applied construction projects. Existing IDEF0 is a representative modeling method for visualizing and analyzing business processes. It defines a construction production process into a visual information model, hence, encouraging the project participant to understand the activities, their deliverable, and control flow of the process. However, IDEF0 dose not lend itself to ICT-applied construction processes, because it does not provide a mean to define how, in what order, by which each and every activity that ICT applied implements. This paper presents a new business modeling method that improves the traceability of ICT application (IAMB: ICT Application tracking Model for Business process) for construction management. The IAMB contributes to handle the sophisticated features of construction management processes to which ICT are applied. The method categorizes the process into three types: management, construction, and information exchange. The validity of IAMB was confirmed by analyzing the performance when it is used for tracking each modeling step of lift reservation process which making use of ICT. The test case provides an admissible evidence that the method encourage to define who, what, how, which order, and by which ICT tools the construction process exchanges production information.

Establishment of Collaborative Decision Making Support Process in Pre-Final Design Step (건축 중간설계단계의 협력 의사결정 지원 프로세스 구축)

  • Oh Seung-Jun;Kwon Won;Kim kyung-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.315-318
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support process for the cooperative design in order to provides improved design coordination and optimize the building system.

  • PDF

A Conceptual Model of Construction Information to Be Used According to Construction Process (현장 시공 프로세스에 따른 시공정보관리 개념 모델)

  • Kwon Young-Sang;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.39-47
    • /
    • 2001
  • Nowadays, the enormous information from each industry has been brought out. According to the advanced information technology, those data have been useful to the point of Cost & Time in the domestic construction industry. Due to the temporary characteristics of construction industry, the various information have only been used just one time and not recycled. There are few studies for the use and management of construction information. Compared with other stages in project life-cycle, the construction stage includes the most important and various information from field. It will be desirable that one should study for developing the use of construction information. With this thesis, this study suggests the conceptual classification model for construction information management.

  • PDF

Decision Model of Construction Errors Management Based on Modular Method Construction Process (모듈러 공법의 시공 프로세스 기반 시공 오차 관리 의사 결정 모델)

  • Shin, HyunKyu;Kim, SuYoung;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.98-108
    • /
    • 2017
  • Recently, the development of middle and high-rise building technology using modular construction method has emphasized the importance of site construction error management. The modular construction method is very limited to adjust the construction error in the field because of the factory production characteristics. Therefore, in order to prevent the construction error in advance, a management plan reflecting the characteristics of the modular construction method is required, and it is important to make the decision of the construction participant at each stage. This study analyzed the factor of construction error of modular construction and suggested a decision support model for construction error management based on construction process. The result of this study is expected to be a guideline for the modular construction participant to derive the construction error management plan.

Automation System for the Outfitting Hole (의장홀 자동화 시스템)

  • Ruy, Won-Sun;Ko, Dae-Eun;Yu, Yun-Sik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.12b
    • /
    • pp.375-378
    • /
    • 2011
  • 본 논문에서는 선체 설계 시에 의장 장비의 설치를 위해서 시공되는 의장홀이 생성되는 과정 및 이에 관련해 업무부서 간에 발생되는 각종 프로세스에 관해서 알아본다. 의장홀의 설계는 설치되어야 하는 의장 장비와 이미 설계되어 있는 선체 구조물을 바탕으로 의장 부서에서 이루어지지만, 선체 구조물에 직접 시공은 각종 제한 조건의 검토가 필수적이며 충분한 고려 후에 선체 부서에서 수행된다. 의장 설비의 특성상 해당 작업은 설계 및 생산과정에서 빈번하고 반복적으로 발생되고 선체 설계에 있어서 큰 병목현상을 발생시킨다. 본 논문에서는 의장홀 시공에 필요한 다양한 프로세스와 정보의 흐름을 자동화하여 조선 설계 및 생산의 효율성을 향상시키는데 기여 하고자 한다.

  • PDF