• Title/Summary/Keyword: 시공중 계측

Search Result 235, Processing Time 0.029 seconds

An Assessment of the Prestress Force on the Bonded Tendon Using the Strain and the Stress Wave Velocity (변형률과 응력파속도를 이용한 부착식 텐던의 긴장력 평가)

  • Jang, Jung Bum;Hwang, Kyeong Min;Lee, Hong Pyo;Kim, Byeong Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3A
    • /
    • pp.183-188
    • /
    • 2012
  • The bonded tendon was adopted to the reactor containment building of some operating nuclear power plants in Korea and the assessment of the prestress force on the bonded tendon is very important for the evaluation of the structural integrity. The prestress force of the bonded tendon at real reactor containment building, was evaluated using the SI technique and impact signal analysis technique which were developed to improve the existing indirect assessmment technique. For these techniques, the strain of the reactor containment building and the stress wave velocity of the bonded tendon were measured. Both SI technique and impact signal analysis technique give the highly reliable results comparison with the existing theoretical approach. Therefore, it is confirmed that the developed techniques are very useful for the evaluation of the prestress force on the bonded tendon.

Analysis on the Characteristics of the Landslide in Maeri (III) - With a Special Reference on Slope Stability Analysis - (매리 땅밀림형 산사태(山沙汰)의 발생특성(發生特性)에 관한 분석(分析) (III) - 사면(斜面)의 안정해석(安定解析)을 중심(中心)으로 -)

  • Park, Jae-Hyeon;Choi, Kyung;Bae, Jong Soon;Ma, Ho-Seop;Lee, Jong-Hak;Youn, Ho-Jung
    • Journal of Korean Society of Forest Science
    • /
    • v.94 no.6
    • /
    • pp.377-386
    • /
    • 2005
  • This study was carried out to analyse the landslide characteristics by ground investigation, borehole image processing system, field seismic test, laboratory test and ground stability analysis at the landsliding area occurred in Maeri, Sangdong-myeon, Gimhaesi, Gyeongsangnam-do. Region I needs to install data logger system to monitor a land displacement during the heavy rainfall events because the region can be liable to occur the land slide by land creeping. It is needed to restore rapidly, if the land displacement occurs in Region I. Region II needs to monitor and repair because of the possibility of slope failure by long-term soil loss. Region III needs constructions to remove ground runoff and ground water to be infiltrated from talus. Region IV where is a stable region, needs to be protected from land cutting or other man-made damage.

Long-term Behavior of Earth Pressure on Integral Abutments (일체식 교대의 장기토압 거동)

  • Nam, Moon-S.;Park, Young-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.4
    • /
    • pp.47-58
    • /
    • 2007
  • The usage of Integral abutment bridges has been increased worldwide because of reducing bridge maintenance costs and resisting seismic loads. Although these attributes make the integral abutment bridge an increasingly popular choice, back-abutment interaction issues remain unresolved. Hence, the earth pressure behavior of an integral abutment bridge having 90 m long PSC beam bridge for the first time in Korea was analyzed by conducting long term monitoring in this study. Based on this study, the results were as follows; the ratio of maximum passive movement to the abutment height (H) of 0.0027 and the maximum passive earth pressure coefficient of 4.8 were developed at 0.82H from the bottom of the abutment during summer season. During winter season, the ratio of maximum active movement to H of 0.0011 and the maximum active earth pressure coefficient of 0.7 were developed at the same location as in summer season. The new earth pressure distributions having a trapezoid type were proposed based on this study.

Stability Test of Stone Mattress Method by Real-scale Hydraulic Experiment (스톤매트리스 공법의 실규모 수리 안정성 실험)

  • Kim, Sung Jung;Kim, Myoung Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.223-223
    • /
    • 2021
  • 호안은 유수로부터 제방과 하안을 보호하는 구조물로 태풍 또는 집중호우로 인한 홍수로부터의 안정성이 확보되어야 한다. 적정한 호안공법 또는 제품의 선정을 위해서는 유속, 소류력 등이 반영된 수리 안정성 검토가 필요하나 현재 국내에는 이와 관련한 객관적인 평가나 시험 기준이 제시되어있지 않기 때문에 국내에서는 실제 수리실험을 통한 호안제품 및 공법의 수리학적 안정성을 제공하는 경우는 찾아보기 어려운 것이 현실이다. 본 연구는 호안공법 중 친환경적 재료를 사용하여 개발된 스톤매트리스 호안공법의 수리적 안정성을 검토하기 위해 수행되었다. 스톤매트리스 공법은 상부망과 하부망의 체결을 통해 돌을 군체로 일체화 시킴으로써 치수 안정성이 매우 뛰어나며, 충분한 식생공간을 확보한 공법으로 재료의 2차 변형 방지가 가능하며 안전한 군체 유지가 가능한 공법이다. 이러한 공법에 대한 안정성 검토를 위한 실규모 실험은 안동 하천연구센터에서 수행하였다. 실험에 사용된 수로는 8°의 경사를 갖는 급경사수로에서 수행되었다. 수로의 제원은 폭 3m, 길이 30m 의 직사각형 형태의 직선수로로 이루어져 있다. 시험체는 실규모로 제작되며 2m × 10m 의 제원을 갖는 별도의 트레이에 시공되어 실험시 크레인을 이용하여 실험수로에 안착시킨다. 수리 안정성 실험은 실험대상유량을 단계별로 나누어 점차적으로 증가시키며, 시험체의 이탈, 파괴 등의 큰 변화가 발생하였을 경우 실험을 종료한다. 수리량 측정은 유속측정, 수위관측 등으로 이루어지며, 재료의 변형은 3D스캐너를 이용하여 변위를 검토하였다. 총 3회에 걸친 실험결과 실험수로에서 발생가능한 최대유량인 4.34cms 조건에서 실험체 바닥에서의 소류력은 약 300N/m2 의 소류력이 발생하는 것으로 확인되었다. 또한 재료의 수직변위는 최대 1.8mm로 계측기 오차범위에 근접한 수치를 보이는 것으로 실험체의 이동이나 석재의 파손은 발생하지 않은 것으로 나타났다.

  • PDF

Estimation of Small Hydropower Resources by Hydrologic Analysis of Han-River Standard Basin (한강수계 표준유역의 수문특성분석을 통한 소수력 자원량 산정)

  • Seo, Sung Ho;Oh, Kuk Ryul;Park, Wan Soon;Jeong, Sang Man
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.47-47
    • /
    • 2011
  • 에너지자원이 부족하여 에너지 해외의존도가 약 80% 이상인 우리나라의 특성상 에너지 해외의존도를 경감시키고 에너지부족 상황을 안정시키기 위하여 국내의 부존에너지를 최대한 활용하는 것이 필요하다. 또한 지구온난화에 대처하는 범세계적인 규제에 대비하기 위하여, 청정에너지를 적극 개발하여 에너지자립도를 향상시켜야 한다. 신재생에너지 중 하나인 소수력은 친환경적인 청정에너지 중 하나로 다른 대체 에너지원에 비해 높은 에너지 밀도를 가지고 있어 개발 가치가 큰 부존자원으로 평가되고 있다. 그리고 소수력은 여러측면의 사회적 환경적 이점으로 최근에는 선진국에서도 매우 큰 관심을 끌고 있으며, 에너지 자원이 빈약하여 대부분 석유수입에 의존하는 우리나라는 지역에너지로 소수력을 적극 개발하여야 한다. 소수력 부존량이 풍부한 우리나라는 1982년에 소수력 개발 활성화 방안이 공표되면서부터 정부주도 하에 소수력 발전소 건설에 관한 연구를 적극적으로 지원하게 되었다. 대수력과 비교하여 소수력의 장점으로는 비교적 짧은 계획 및 시공기간, 낮은 투자비용, 개인이나 기업을 통한 투자참여, 주위 인력이나 자재를 이용한 쉬운 설치, 적은 환경적인 피해 등이 있다. 이와 같이 청정에너지 중 하나인 소수력의 개발과 활용을 위하여 IT 기술을 접목한 다양한 응용시스템 구축이 진행되고 있다. 특히, 한국에너지기술연구원에서는 신재생에너지 개발 및 보급 확대를 목표로 2006년에 신재생에너지 자원지도시스템을 구축하였으며, 이를 웹상에서 제공하고 있다. 소수력 발전시설의 적극적인 활용을 위해서는 초기설계시 장기유출 특성분석을 통해 해당유역의 수자원을 최대로 활용하고, 지형적인 요소를 이용하여 전기의 생산이 최대가 되도록 하는 최적설계가 이루어 져야 한다. 따라서 본 연구에서는 소수력 발전시설의 최적설계를 위해 한강수계 258개 표준유역 중 섬강합류점에 대하여 자원지도를 활용하여 연평균유량을 추정한 후 소수력 자원량을 산정하였고, 그 결과로 시설용량과 연간전기생산량은 각각 1,633kW, 6,224MWh로 산정되었다. 또한 유출량의 미계측 유역에서의 소수력 발전성능을 예측하기 위한 방법으로 Weibull 분포의 특성화 방법을 선택하여 그 적용성을 검토하였다. 섬강합류점 표준유역 내에 위치하고 있는 목계관측소, 앙성관측소에서의 10개년(1999~2008) 강우자료를 바탕으로 유황곡선을 작성하여 상관관계분석을 실시한 결과 목계관측소에서 0.994701, 앙성관측소에서 0.992616으로 관측치와 계산값이 상당히 유사한 것으로 나타났다.

  • PDF

A Case Study on the Application of Vibration Level Units in the Construction Phase (시공단계의 진동레벨 단위적용에 관한 사례 연구)

  • Choi, Hyung-Bin;Kim, Dong-Yeon
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.86-97
    • /
    • 2012
  • Ground vibration induced by a bench blasting in the construction site should cause the damage to the structure and indirect damage to a human body, and the vibration level is most practical descriptor for regulating the damage to human body and peak particle velocity is the descriptor for direct damage assesment of the structure. Meantime, the vibration level has not been considered for the blasting design but this study is the case that apply not only peak particle velocity but also vibration level on the blasting design. Also, we strongly believe that this study will be helpful for the management in the blasting site which some civil appeal is concerned. Total 232 measurements of both ppv and vibration level was used to estimate the scale distance. When the regulating threshold was ppv 0.3 cm/s and vibration level 75 decibel, the charge per delay to be estimated with vibration level could be recommended by 1.2~1.4 times than it of ppv. So, it is proven that considering vibration level on the blasting design is reasonable for not only prevention of the civil appeals but also effective blasting. Again, the blasting design which follows the law, "Noise and Vibration Control Act" can actually serve good condition to carry much more economical and effective blasting. The instruments used for this study are the SV-1 model, as first instrument in korea which can measure vibration velocity and vibration level at the same time.

Structural Design And Analysis of Haeundae Doosan We've The Zenith (해운대 두산 위브 더 제니스 구조설계)

  • Park, Ki-Hong;Park, Suk-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.93-98
    • /
    • 2008
  • Haeundae Doosan We've The Zenith project is adjacent to Suyoung-bay, now it is in the process of excavation and foundation work. The main use of the tower is residence which height is 300m and 80 floor, the highest residential reinforced concrete building through the Orient. It is comprised of 3 high- rised buildings and 1 low-rised building, the basement is 230m wide and 200m length sized mass structure. The lateral resistance system is acted effectively against the lateral load and satisfactorily against the wind vibration by the 4 direction extension of the center core wall($700{\sim}800mm$ thickness) and reinforced concrete column set around the slab. Flat-plate slab system(250mm thickness) is adjusted for the slab system and it enables effective work process and shortening the working term by minimizing the ceiling height and not needing to install perimeter beam and drop panel. The strength and serviceability of the structure is able to be monitored and estimated constantly through the health monitoring system during the construction and after the construction.

  • PDF

Design of Sedimentary Rock Slopes in River Diversion Works (가배수로 터널공사의 퇴적암 사면 안정화 설계)

  • Jee, Wang-Ruel
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.17-32
    • /
    • 1998
  • The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia, The power station will consist of a 210m height concrete faced rockfill dam. During the construction of the dam and the power facilities the Balui river has to be diverted by three diversion tunnels with a length of some 1,400m each. The inner diameter of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet and outlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four. defined Rock Mass Types (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each 'global' slope without any rock support and shotcrete system. In the second stage, it is calculated for each 'local'slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF

The Inclination Characteristics of PSC BOX in FCM Bridge Construction Method (FCM 교량 가설 공법에서 주두부의 기울음 특성)

  • Hyun-Euk Kang;Wan-Shin Park;Young-Il Jang;Sun-Woo Kim;Hyun-Do Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.12-20
    • /
    • 2023
  • This study presents basic data on how to secure stability by analyzing the change in tensile force of steel rod and the inclination characteristics of PSC BOX in the "Temporary fixation system using internal prestressing tendon", which is mainly applied to construction of superstructures by FCM. To date, it has been difficult to confirm the changes in tension force of the steel rod and the inclination of the PSC BOX because the steel rod was installed vertically inside the pier and the PSC BOX. Therefore, measurement of the change in length of the steel rod and the displacement of PSC BOX were performed using a micro-measured FBG sensor. Comparisons of the calculated tensile force and the residual tensile force of the steel rod revealed that the safety factor decreased in all bridges. The cause was mainly identified to be the loss of tensile force in fixation~1segment, and countermeasures are suggested. The analysis of the inclination characteristics showed that the inclination increased with the segment progresses even in bridges with sufficient safety factor, and the difference before and after the segment was confirmed. In addition, the increase in inclination was related to the loss of tension force in the steel rod, and the stress on the opposite sides of the inclination was further reduced. It is believed that upward tensile force is generated in the steel rod on the opposite side of the inclined side due to the unbalanced moment, causing the difference in stress of the steel rod between the two sides.

Development of 3D Underground Information Construction and Visualization System Based on IUGIM (지하공간통합지도 기반 3차원 지하정보 구축 및 가시화시스템 개발)

  • Kang, Kyung Nam;Kim, Wooram;Hwang, Seung Hyun;An, Joon Sang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.497-505
    • /
    • 2021
  • Due to recent underground space accidents, are a frequent occurence in Korea, the government established the basic plan for the construction of the IUGIM (Integrated Underground Geospatial Information Map) in 2015 as a measure for safety management of underground spaces. The development of IUGIM was partially completed as of 2021. The underground space management entity and related organizations are utilizing it. This study is being carried out as part of a plan to improve the usability of IUGIM, and to build a visualization system that compares real-time field data with stored data. A system, equipped with a visualization function for borehole data and 6 types of underground facilities built and managed on IUGIM; a tool capable of comparative analysis with real-time data measured in the field, is being built. The 6 types of underground facilities are water supply pipe, sewage pipe, power pipe, gas pipe, communication pipe, and heating pipe. The completed system was demonstrated at three locations in Seocho-gu, Gangnam-gu in Seoul. The field demonstration was carried out by accessing the mobile center and downloading IUGIM data, visualizing IUGIM data (surface creation, borehole information, underground facilities), and visualizing the GPR(Ground Penetrating Radar)-based data acquired at the field. As a result of the empirical results of IUGIM data and GPR-based field data, it was judged to be suitable. As a result of this study, it is judged that it can be helpful for safe construction at the excavation site.