A Study on the Economical Efficiency and Cost Analysis of Winter Construction by Application of Insulated Gang-form (동절기 단열갱폼으로 인한 경제성 효과 및 투입 원가 분석 연구)

  • Won, Joon-Yuen;Lee, Young-Do;Nam, Kyung-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.347-354
    • /
    • 2018
  • This paper verifies the superiority of warming work in winter by applying the insulation gang-form to the apartment housing site and analyzes the economic feasibility of the application. According to the experimental results, the actual cost of warming work was about 52 million won less than planned, and 160 million won less than the existing average.(Note - The cost of gang form material increased from 260 million won to 310 million won after the change) As a result, the construction cost could be reduced by about 110 million won. As the costs of warming work can change depending on the number of floors, the building number, and the area of each site, it is deemed necessary to conduct a thorough review in advance at the site where the cost of warming work is to be applied.

An Application of Simulation Method to Planning of Road Pavement Operation (시뮬레이션을 이용한 도로포장 공정계획의 수립방안)

  • Ohn, Seong-Won;Kim, Ok-Ki;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.124-131
    • /
    • 2007
  • Project management means usually managing the rate of construction progress. But it also contains preparing scheme of execution and establishing plan for equipment, material, labor force to finish project within expected duration. In this paper to establish effective project planning a road pavement operation is selected as a case and simulation method is used for analyzing it. Next probability distributions are created after analyzing collected data and these are reflected in simulation model. Simulated result is compared with real project planning using models of lean concrete pavement process and concrete slab pavement process to verify efficiency of this model. In the event we know that project planning using simulation is more effective than one of the field in the aspects of duration and cost. Meanwhile simulated result in this paper has a limitation in accuracy because various constraints of filed are not reflected in it. However if we reflect this constraints in model through examining field in future this limitation is expected to be improved.

Deformation Characteristics of Flexible Pipe with Variation of Buried Conditions (매설조건에 따른 연성관의 변형특성)

  • Lee, Bongjik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.10
    • /
    • pp.53-62
    • /
    • 2014
  • In Korea, the pipe type that has been well used as sewage pipe from the past is primarily a rigid pipe which is represented by concrete hume pipe, but the use of it is being decreased sharply because of the problems such as tube erosion and incomplete watertightness securing through the time. On the other hand, the use of flexible pipe has been increased because its construction ability is excellent on account of its light weight as well as it is resistant to corrosion. However, because there are lacks of market's confidence in flexible pipe and occurrence cases of partial damage incomplete caused by compaction control, cause analysis and management for them are needed. Therefore, this study tried to estimate the deformation characteristics of pipe caused by each condition through numerical analysis changing construction sequence, rigidity of pipe, strength of ground concrete under the pipe, relative compaction ratio of sand foundation under the pipe and relative compaction ratio of backfill material above the pipe. Evaluation result is that influence on each factor is confirmed and the quality control of sand around the pipe are turned up to be important.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

A study on the choice of the best method of construction for building insulation and waterproof (건축물의 단열방수의 최적 공법및 구법 선정 방법론에 관한 연구)

  • Lee, Sung-Goo;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.654-658
    • /
    • 2006
  • To solve some problems that reveals in the exiting stickiness problem of the housetop, the housetop finishing impact layer can be displaced by the existing concrete block. By doing in this way, this need is rising that the excess cost should be reduced and the materials should be recycled in repairing. According to the above, this study is going to suggest the basic data on building and using of the dry process method by estimating and analyzing a overall determinate quantity through the experiment on the insulation performance among the capacity items on the outside insulation waterproof dry process suggested. In addition, choosing the building method according to the use, the peculiar property and the importance of the building can be possible by analyzing the defect causes happening in the rooftop insulation and waterproof, suggesting the better method and classifying the most proper choosing methods for the need of the building according to the importance of the main factors.

  • PDF

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM) (DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구)

  • Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.151-159
    • /
    • 2016
  • Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.

Daily Reporting System using Digital Pen at Construction Site (디지털펜 기반의 건설현장 작업일보시스템 개발)

  • Shin, Yoonseok;Kim, Daewon;Kim, Tae-Yong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.177-183
    • /
    • 2016
  • The daily report includes the most detailed information and various daily planning and performance data recorded at a site, and includes work types, the number of workers, and the equipment and materials used. However, in the daily reporting process, some information can be omitted or distorted or even made redundant due to there being several steps of manual input. For this reason, the daily report is utilized for a simple report rather than for an appropriate purpose. Thus, to resolve the issues of the existing daily report system mentioned above, a daily report system using a digital pen was developed and then applied to an actual construction site to verify its applicability. As a result, it was found that 96.610% recognition accuracy of handwritten letters could be achieved. In addition, it was no longer necessary to enter the same information multiple times and no additional training or education for using a mobile device was needed. The digital pen-based daily report program developed in this study is expected to contribute to an improvement of information management efficiency and site document management work by addressing the problems of the existing report system.

An Improved Process System to File a Claim in Construction Projects (건설공사 시 클레임 제기를 위한 프로세스 시스템 개선 방안)

  • Bang, Taewon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.22-32
    • /
    • 2017
  • Judging from the past cases, the contractor has frequently suffered losses caused by disapproved requests or reduced payments since it has not known the conditions of the contract or it has filed a claim to the owner without any proper claim system. Therefore, the existing claim process needs to be reformed. In order to reform the claim process, the contractor should consolidate the organizational structure, grant accurate duty assignments to the claims manager, implement regular staff training on how to deal with claims. In addition to this reformation, the contractor needs to improve the management of construction period and process control, and manage related documents thoroughly. Regular meetings are also necessary in claims. This study attempts to prove the effectiveness of the reformed process applied to Project "A", where the owner was responsible for the delayed supply of materials, inaccurate oral instructions, insufficient information on the work, and frequent changes of design. The project was completed in 96 months, which was extended by 34 months from the initial construction period of 62 months. The reformed claim process is expected to be of great help not only to largescale construction works but also to smallscale ones.

Pore Characterisitics and Adsorption Performance Evaluation of Magnesium Oxide Matrix by Active Carbon Particle Size (활성탄소 입도에 따른 산화마그네슘 경화체의 공극특성과 흡착성능 평가)

  • Pyeon, Su-Jeong;Lee, Sang-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.59-65
    • /
    • 2018
  • Radon gas is a colorless, odorless, tasteless gas that occurs when uranium, a natural radioactive material in rocks and soils, collapses. 85% of the annual radiation exposure of the human body is due to natural radiation, of which 50% is radon. According to the US Environmental Protection Agency (EPA) survey, 62 out of 1,000 smokers and 7 out of 1,000 nonsmokers are exposed to lung cancer when exposed to radon gas for a long time. In order to reduce the risk of radon gas, activate carbon was used to fabricate matrix, and the pore properties and radon reduction properties were investigated. When the activate carbon was used, the radon gas concentration was drastically reduced and the graph was changed as the measurement period became longer. The pore distribution and microporous properties, which are one of the material properties of activate carbon, can be grasped.