• Title/Summary/Keyword: 시공수준

Search Result 554, Processing Time 0.029 seconds

A Study on the Possibility of 2D Design Drawing Implementation by Revit Architecture (Revit Architecture를 이용한 2D 설계도면 구현 가능성에 관한 연구)

  • Cho, Yong-Sang;Lee, Heewon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5243-5250
    • /
    • 2013
  • BIM(Building Information Modeling) enables 3D model-base management for all information produced by construction project during its life cycle. Also as a national policy, BIM has been institutionalized as design criteria. But, on the matter of 2D drawing using BIM software (Revit Architecture), it has been recognized as difficult to realize the same quality drawing drawn by CAD. The purpose of this study is verifying the possibility of printable design drawing implemented by BIM software at the same quality of 2D shop drawing drawn by 2D CAD. Through the analysis of basic design elements of 3D BIM software and 2D CAD software, with the case of partial cross sectional drawing which is most faithful representation of the basic design elements, this study find out that the 3D BIM software can produce the same quality 2D printable drawing utilizing its implicit function.

Investigation on Level of Emergency Treatment Performance on Building Construction Sites in Jeju (제주지역 건설현장의 응급처치 대응수준에 대한 조사연구)

  • Kang, Soon-Min;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.211-219
    • /
    • 2012
  • On January 27, 2005, the central government of the Republic of Korea designated Jeju Island as an Island of World Peace based on Article 12 of the Special Act for the Jeju Free International City, and the WHO designated Safe Community Jeju in July, 2007. Whenever an industrial accident occurs on Jeju Island, reports in the media raise the question of whether Jeju is a safe city or not. But due to the characteristics of construction sites in Jeju, it is very difficult to employ workers of a certain level. For the safety of workers, it is also thought that owners should make a decisive investment to introduce an education and reward system in order to improve the consciousness level of workers. This research focuses on first-aid on construction sites. It then surveys the level of construction safety management, and suggests improvements in construction safety control and first-aid.

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

평면 개발의 산실, '현대산업개발'

  • Choe, Bo-Yun
    • 주택과사람들
    • /
    • s.208
    • /
    • pp.90-93
    • /
    • 2007
  • 현대산업개발은 정몽규 회장이 취임하면서 현재 단순한 시공사가 아닌 세계적인 수준의 경쟁력을 갖춘 부동산 개발 업체 및 인프라 건설 기업으로 도약하기 위해 외형 성장이 아닌 철저히 수익 위주의 사업을 전개하고 있다. 지난해 창립 30주년을 맞이한 현대산업개발의 새로운 전략을 통해 국내 건설사가 나아갈 방향을 가늠해보자.

  • PDF

환경오염이 건설안전에 미치는 영향

  • 갈원모;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.11a
    • /
    • pp.384-389
    • /
    • 2002
  • 건설현장에 환경과 관련된 압박요인이 작용한 것은 불과 몇 년 전이었으나 그 강도는 크게 증가하여 실행예산 내에서 공사를 마무리하기 위한 큰 부담요인이 되고 있다. 대부분의 건설 공사는 설계단계에 있어서는 환경문제의 수준을 예상치 못하고 착공에 들어가는 경우가 많다. 분진이나 기타 소음, 진동 등의 환경적 문제는 부지굴착 중이나 시공 중에 그 중요성이 인식된다.(중략)

  • PDF

국내 최초로 아파트 세대 내부까지 ESCO사업 적용

  • 에너지절약전문기업협회
    • The Magazine for Energy Service Companies
    • /
    • s.12
    • /
    • pp.26-29
    • /
    • 2001
  • 한라건설(대표 김재영)은 상하수도 처리시설 등의 환경사업, 아파트, 빌라, 주거용 오피스텔 등의 주택사업을 영위하고 있는 종합건설업체로 2001년 현재 국내 시공능력 평가순위 36위업체다. 이와 같은 경험과 능력을 바탕으로 지난해 ESCO사업에 진출한 한라건설은 국내 최초로 아파트 세대 내부까지 ESCO사업을 적용하는 등 ESCO사업의 수준을 끌어올리기 위해 노력하고 있다.

  • PDF

Taipei Financial Center Project (Taipei F.C 건물의 신공법 시공사례 -세계 최고층(508m) 프로젝트-)

  • 옥유곤
    • Journal of the Korean Professional Engineers Association
    • /
    • v.37 no.2
    • /
    • pp.37-41
    • /
    • 2004
  • 왜 이렇게 높이 지어야 하는가? 그 가장 큰 목적은 초고층 건축물의 건축을 통해 세계와 경쟁하고, 인간의 능력, 즉 현시점의 건축기술 한계에 대한 도전이자 경제, 문화수준의 발산일 것이다. 그런 관점에서 아무도 세계에서 제일 높은 건축물을 대만에 지으리라 생각하지 않았을 것이다.(중략)

  • PDF

Reinforcement of Shotcrete Lining on the Side Wall of Tunnel in Enlargement of Existing ASSM Road Tunnel (측벽부 숏크리트 보강에 의한 재래식 도로터널 단면확대)

  • Kim, Donggyou;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.81-89
    • /
    • 2012
  • The existing tunnel in urban area can be enlarged because of requirement of road-widening by traffic growth. The protector with rectangular cross section can be set up in the tunnel, which will be constructed for enlargement of width, to solve traffic jam around the tunnel. It is impossible to install the rockbolt in the lower area of tunnel due to a limited space between the protector and cutting surface. The objective of this study is to suggest the method of shotcrete thickness increase instead of rockbolt installation in the side wall of tunnel for the stability of tunnel. Numerical analysis was performed to evaluate displacement at the crown of tunnel, convergence of tunnel, and stress in shotcrete lining in 3-lane and 4-lane NATM tunnels enlarged from 2-lane conventional tunnel. There were three types of analysis condition, rockbolt installation, no rockbolt installation, and increase of shotcrete thickness without rockbolt in the side wall of tunnel. There was no difference on the displacement at the crown and the convergence of upper tunnel. In the lower tunnel, the convergence in case of no rockbolt installation was larger as maximum 1.3mm than that in case of rockbolt installation. The stress in shotcrete lining in case of no rockbolt installation was larger as maximum 1.3MPa than that in case of rockbolt installation. Numerical analysis was performed to compare the behavior of shotcrete with rockbolt with that of shotcrete, which its thickness was increased, without rockbolt. The shotcrete has an increase of 20%(250mm ${\rightarrow}$ 300mm, 4-lane tunnel)~25%(200mm ${\rightarrow}$ 250mm, 3-lane tunnel) in its thickness to reduce the stress in shotcrete lining. The behavior of shotcrete lining increased the shotcrete thickness by 20%~25% was similar to that of existing shotcrete lining with rockbolt.

Development of Design Process Management Model using Dependency Structure Matrix for Constructability (시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발)

  • Park, Moon-Seo;Ham, Young-Jib;Lee, Hyun-Soo;Kim, Woo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.65-74
    • /
    • 2010
  • The design with construction knowledge and experience can eliminate inefficiency in the process of construction and improve productivity in all phase of construction project. To utilize constructability knowledge most effectively in design phase, the information must be made available to the design team at the proper point in time. Current methods for effective utilization of constructability knowledge have focused on the structuralization of constructability knowledge such as checklist, which lack the consideration of the proper point in time. However, constructability knowledge which is used at the inapposite point in time consequently leads to unnecessary rework. To minimize this inefficiency and improve productivity, project manager needs to consider the design process and know what constructability knowledge is required for specific design activities. This paper therefore presents a design process management using Dependency Structure Matrix (DSM) that focus on information flows between design activities and constructability knowledge. We expect that the results of this paper will support that design process management become comprehensive management related to every phase of construction project beyond design review or inspection in design phase, and be used as a basis of the integration of design and construction.

Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP - (시공단계 BIM 활용을 위한 모델 요구조건 체크리스트 개발 - MEP를 중심으로 -)

  • Kim, Woojin;Park, Jinho;Cha, Yongwoon;Hyun, Changtaek;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.22-31
    • /
    • 2019
  • The application of BIM that can manage and integrate information generated during the entire life cycle of buildings in domestic and overseas construction projects is becoming active. When BIM is utilized in the construction phase, it can shorten the construction period, reduce the occurrence of reworks and improve collaboration capability. However, there are limitations in applying BIM to the construction phase due to the insufficient definition level of domestic BIM guidelines and inadequate design standards. In this regard, this study developed BIM model requirements checklist for the application of BIM in the construction phase. To develop the checklists, 21 domestic and overseas BIM guidelines, three public construction projects and four private construction projects to which construction BIM was applied, were analyzed. Based on the guidelines and cases, a total of 62 construction BIM model requirements (31 model objects and 31 attribute rules) and proposed construction BIM model requirement checklists by dividing the 61 requirements according to the requirement and purpose for utilization were identified. It is expected that the practical applications of the checklists proposed in this study will improve the level of BIM model in construction phase. In addition, this study has its significance as a basic research that can be used in the development of standardized guidelines for BIM model in construction phase from academic aspects.