• Title/Summary/Keyword: 수치지도 제작

Search Result 357, Processing Time 0.031 seconds

A study on the Price Policy of the National Base Map (국가기본도의 가격정책에 관한 연구)

  • Park, Kyeong-Sik;Choi, Seok-Keun;Lee, Jae-Kee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.1 s.31
    • /
    • pp.27-35
    • /
    • 2005
  • It is impossible to call in the cost of map-production from the supply cost because the map produced in NGI is the public property. The aims of this research are to calculate a map manufacture cost and to assess the reasonable map prices with considering public property of map. For these aims, We have calculated the cost according to the scale and the form of paper and digital map, have determined the map supply cost, and have analyzed the situation of map supply and the map circulation market. We propose two alternatives. Firstly, supply price of map is reached the goal price after 6-years(raising ratio 30%) and Secondly, supply price of map is reached the goal price after 3-years(raising ratio 50%) because map supply price raising ratio is very much if research results are reflected after 1-year.

  • PDF

Flood Inundation Analysis by Construction Techniques of River Topography (하천지형 구축기법에 따른 홍수범람해석)

  • Lee, Jung-Sik;Moon, Chang-Geon;Sim, Jung-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.411-415
    • /
    • 2011
  • 홍수 및 침수 등의 재해로부터 사전예방 및 신속한 대응을 위한 기초자료로서 홍수위험지도 및 재해지도는 반드시 필요하고, 이러한 위험지도 제작에 있어 가장 핵심적인 내용은 시나리오별 홍수범람해석이다. 현재 우리나라는 국가하천 규모 및 지방하천 중 침수피해가 큰 구간에 대해 제한적 범위내에 2차원 해석을 적용하여 위험지도 제작을 하고 있지만 지방하천 및 소하천의 경우 각종 기본계획 및 종합계획에서 일부 1차원 수리 해석 후 GIS와 연계를 통해 홍수범람해석이 이루어지거나 대부분 수치지도의 등고선과 홍수위를 이용하여 수작업으로 범람구역을 표기하고 있는 실정이다. 따라서 본 연구는 홍수범람해석시 수작업의 동반으로 인한 가장 많은 시간과 인력적 비용이 요구되고 GIS의 고급기능 등을 반드시 숙지해야하므로 인해 범람해석의 걸림돌이었던 하천지형 구축부분에 대해 기존의 방법인 1:5,000 수치지형도부터 DEM 생성 및 적용과 WMS를 통해 전 세계 수치지형을 신속하고 편리하면서 무료로 제공받을 수 있는 ASTE과, SRTM DEM을 각각 적용하여 각각의 하천지형을 구축하여 HEC-RAS 및 HEC-GeoRAS를 이용하여 수리해석 및 범람해석을 수행하였으며 그 결과를 비교 분석하였다. 본 연구의 결과는 WMS에서 제공되는 Online DEM을 적용하여 신속하고 편리하게 하천지형을 구축함으로서 시간 및 인력적 비용을 절감하고 비교적 적절한 홍수범람해석 결과를 얻을 수 있을 것으로 판단된다.

  • PDF

Manufacturing Digital Map Version 2.0 Increased Visual Information (시각적 정보력이 향상된 수치지도 Ver. 2.0제작)

  • Park Kyeong Sik;Lee Jae Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.3
    • /
    • pp.221-231
    • /
    • 2005
  • Though Digital Map Ver. 2.0 is adequate to GIS, the possibility to gain information from its external form and the ease of producing paper map had retrogressed. In this research, concerned with the problems, we plan to make Digital Map Ver. 2.0, which satisfies the conditions of GIS. It will have geometrical and logical data structure, and also possess informative ability as much as that of Ver. 1.0. For the study, the process to analyze the topographic code, color, code priority order, etc. of paper relief map, digital map Ver. 1.0, and digital map Ver. 2.0 was taken. For the topographical feature with diverse expression, we changed the portrayal of digital map Ver. 2.0 to make it fit the regulations of map portrayal. At the point of topographic code priority order, the rule is to arrange them in the same order as the real territory. However, we made a special code in the case of any change of the locational order. According to the property of this study, we observe the regulations of map portrayal, for the elements related to subjective sense, such as colors. And we give priority on the data construction when the portrayal of topographical feature and the schema of GIS database system are contradictory.

A Study on Viewer Program Development for Usage at Mobile Device of Digital Map Ver. 2.0 (수치지도 Ver. 2.0 Mobile Viewer 개발에 관한 연구)

  • Jeon, Jae-Yong;Choi, Young-Taek;Guak, Dong-Wook;Cho, Gi-Sung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.3 s.33
    • /
    • pp.79-85
    • /
    • 2005
  • Early, national basic topographical map has been represented, stored, supplied in form of DXF(Data eXchange Format) and present digital map is equipped as over form. Since many parts of digital map has been equipped newly to use early digital map form for geographic information system. Especially, many structural editing and geographical search are demanded to exclude geometric inconsistency and logical inconsistency included in the existing digital map. As above, DXF is unsuitable data format to use in geographic information system. For the sake of efficient format, Digital Map Ver. 2.0 that is new map format was developed. In this study, we developed the Mobile Viewer program development which can let us see immediately the digital maps produced in the form of Digital Map Ver. 2.0.

  • PDF

A Study on the Digital Map Production and Water Supply management in GIS (GIS에 의한 수치지도 제작과 상수도 관리에 관한 연구)

  • 강준묵;윤희천;한승희
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.11 no.2
    • /
    • pp.59-67
    • /
    • 1993
  • Since society rapidly change, we need accurate and rapid information. Due to complication and rapid change of national infrastructure system, we meet a limitation of 2-D information management. Currently most digital cartographic data is acquired by manual digitizing with a tablet. Recently high cost scanner is widely used and preprocessing and postprocessing software of scanning are developed, so we expect its availability. In this study, we know that scanning is more convenient than digitizing with a tablet for digital mapping, also, possibility of 3-D modeling of vectorized document is suggested. Because information rapidly provided in the planning and implementation, operation efficiency and advance are archived in water supply project. Improvement of service for need of citizen and possibility combined information system connected with other system is presented.

  • PDF

Evaluation of Possibility of Large-scale Digital Map through Precision Sensor Modeling of UAV (무인항공기 정밀 센서모델링을 통한 대축척 수치도화 가능성 평가)

  • Lim, Pyung-chae;Kim, Han-gyeol;Park, Jimin;Rhee, Sooahm
    • Korean Journal of Remote Sensing
    • /
    • v.36 no.6_1
    • /
    • pp.1393-1405
    • /
    • 2020
  • UAV (Unmanned Aerial Vehicle) can acquire high-resolution images due to low-altitude flight, and it can be photographed at any time. Therefore, the UAV images can be updated at any time in map production. Due to these advantages, studies on the possibility of producing large-scale digital maps using UAV images are actively being conducted. Precise digital maps can be used as base data for digital twins or smart cites. For producing a precise digital map, precise sensor modeling using GCPs (Ground Control Points) must be preceded. In this study, geometric models of UAV images were established through a precision sensor modeling algorithm developed in house. Then, a digital map by stereo plotting was produced to evaluate the possibility of large-scale digital map. For this study, images and GCPs were acquired for Ganseok-dong, Incheon and Yeouido, Seoul. As a result of precision sensor modeling accuracy analysis, high accuracy was confirmed within 3 pixels of the average error of the checkpoints and 4 pixels of the RMSE was confirmed for the two study regions. As a result of the mapping accuracy analysis, it satisfied the 1:1,000 mapping accuracy announced by the NGII (National Geographic information Institute). Therefore, the precision sensor modeling technology suggested the possibility of producing a 1:1,000 large-scale digital map by UAV images.

A Pilot Project on Producing Topographic Map Using Medium Resolution Satellite Image (중해상도 위성영상을 이용한 지도제작 시험연구)

  • 박희주;한상득;안기원;박병욱
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.19 no.4
    • /
    • pp.373-383
    • /
    • 2001
  • This study conducted pilot mapping project to know the possibility of mapping with medium resolution satellite imageries. For this purpose, mapping experiments were conducted with each stereo model imageries of SPOT, KOMPSAT, and IRS- lC. And positional accuracy, analysis of detectable and describable features, and comparison with existing digital map were checked, possible mapping scale and cost analysis were conducted with these results. Regarding SPOT imagery, digital photogrammetric workstation was used for stereoplotting. Regarding KOMPSAT and IRS-lC imageries, because there were data format support problems. head-up digitizing was performed with ortho imageries rectified with DEMs generated by image matching. The results of experiments show that such features as wide road, river, coast line, etc are possible to detect and depict but many other features are not for SPOT, KOMPSAT, and IRS-lC imageries. On the aspect of mapping, therefore, SPOT is available for 1/50,000 topographic map revision, KOMPSAT and IRS-lC for 1/25.000 topographic map revision.

  • PDF

A Study on the Generation of Draft Map using Kompsat-1 Satellite Image (아리랑 1호 위성영상을 이용한 도화원도 제작에 관한 연구)

  • Jeong, Soo;Kim, Youn-Soo;Lee, Ho-Nam
    • Proceedings of the KSRS Conference
    • /
    • 2001.03a
    • /
    • pp.15-18
    • /
    • 2001
  • 아리랑 1호 위성은 EOC 센서를 이용하여 지도제작에 활용될 수 있는 고해상도의 입체영상을 제공하는 기능을 포함하고 있다. 그러나, 기존의 사진측량 도화장비나 대부분의 수치사진측량 시스템에서 아리랑 1호 위성영상을 이용한 도화기능이 제공되고 있지 않으므로, 아리랑 1호 위성영상을 이용한 지도제작은 정사영상에 의한 영상지도 제작으로 국한되어 이루어져 왔다. 본 연구에서는 상용 수치사진측량 시스템 상에서 아리랑 1호의 입체위성영상을 DLT 모델에 적용하여 입체표정을 수행한 후에 도화작업을 시범적으로 실시하였다. 또한 그 결과를 분석함으로써 아리랑 1호 입체영상에 의한 도화원도 제작의 범위와 타당성을 분석하였다.

  • PDF

Feature Extraction using Orthophoto in CAD System (CAD 시스템 기반에서 정사영상을 이용한 지형 요소 추출)

  • 김감래;김명배;곽강율
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.04a
    • /
    • pp.393-396
    • /
    • 2003
  • 본 연구에서는 범용 CAD 시스템에서 정사영상을 이용한 지도제작 가능성 판단을 목적으로 하고 있다. 이를 위해 대전시 일부 지역에 대한 항공사진을 영상화 및 정사 보정하여 범용 시스템에서 판독 가능한 지형 요소를 분석하고 추출하였다. 국립지리원 발행 1/5,000 기준 수치 지도와 비교하여 정성적 및 정량적으로 분석하고 표현상의 문제점을 도출하였으며, 범용 시스템에서 정사영상을 이용한 지도 제작 가능성을 검토하였다.

  • PDF

Development of Digital Map On-demand Updating System (수치지도 수시갱신 시스템 개발)

  • Lee, Jae-Kee;Lee, Dong-Ju;Jung, Sung-Heuk
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.5
    • /
    • pp.537-546
    • /
    • 2008
  • The digital map has been updated in every five years in the past. However, it has been changed to make corrections and updated in every two years for metropolitan region and every four years for other regions since year 2008. Although, the correctness and reliability were decreased and updating work is being delayed due to the updating work in a lump. The period update spends a lot of money because this method uses aerial photogrammetry, and the digital map has the time gap between periods. Therefore, this study provides information necessary for digital map produced by the government and develops digital map production system based on objects which can be updated frequently in order to save state and local government budgets that double investment are generated to update digital map. In order to analyze usefulness of the developed system, subject area was selected and errors of updated data were analyzed. As the result of analysis, checked 66 errors were corrected and saved in the database.