• Title/Summary/Keyword: 설계용역대가

Search Result 10, Processing Time 0.024 seconds

A Study on the Estimating Strategy for the Design Phase VE Consulting Fee (설계VE 용역대가 산정방안에 관한 연구)

  • Kim Chul-Woong;Jung Young Il;Kim Yang-Taek;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.97-106
    • /
    • 2002
  • at the design phase and the effective design phase VE application, it is not sufficient to implement VE study at the design phase in the domestic construction industry. The method for estimating design phase VE consulting Fee regulated in current guideline and the insufficient incentive system according to the result of design phase VE application are major problems among the problems related to the roadblock of the active implementation Design phase VE. In this paper, firstly the current methods for estimating Engineering business consulting fee analogous to design phase VE and the domestic and foreign design VE consulting fee were examined, and detailed problems related to the method for estimating design VE consulting fee were indicated, and the Improvement direction were established. Secondly, the estimating strategy for the design phase VE consulting fee and the payment strategy of incentive according to the result of savings were proposed. Finally, the strategies were verified by interview with the experts.

An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.

A basic study for Introduction of Standards Governing Compensation for Design Service of Mechanical Facilities of Buildings (건축기계설비 설계용역 대가기준 도입을 위한 기초연구)

  • Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.189-190
    • /
    • 2017
  • As buildings take on more advanced features, mechanical facilities of buildings are accounting for increasingly greater significance in building construction projects. However, mechanical facility designers are forced to be content with design service fees that do not properly compensate their excessive workload, with lowest-bid-first tendering practices compounding their economic woes. In relation to this, this Study aims to offer suggestions for better standards for compensation of design service for mechanical facilities of buildings, highlighting five key suggestions in consideration of relatively small size of work and unmatched long duration of work.

  • PDF

Improvements for Ordering and Bidding of VE in Convergence Era (융복합시대 설계의 경제성 등 검토(VE) 발주 및 입찰시 문제점과 개선방안에 관한 연구)

  • Park, Myeong-Su;Yang, Hae-Sool
    • Journal of Digital Convergence
    • /
    • v.14 no.3
    • /
    • pp.25-33
    • /
    • 2016
  • The author of this study conducted a survey with the expert groups who are currently handling hands-on works in convergence cities, ordering organizations, construction management companies, contractors, schools and research institutes, etc. The results of empirical analysis can be summarized as follows: First, there is no difference in distribution among the problems with position and the bidding system of private contracts. Second, there is relevance between position and the adequacy of current design VE ordering system, indicating different recognition. Third, there is no difference in distribution between organizations and the adequacy of current design VE ordering system. Fourth, there is difference in distribution between organizations and service price adequacy and there is difference in recognition by organization when organizations mutually recognize the service price adequacy. Fifth, there is difference in distribution between career and the necessity of the participating companies' qualification. Sixth, there is difference in distribution for the adequacy of career and the adequacy of participating companies' requirements. No problems have been found with the adequate service period according to private contract bidding system, but the necessity of participating companies' qualification and participating companies' requirements.

A Study on the Method for the Estimate of Construction Management in the Program Management (종합건설사업관리 사업관리비용산정을 위한 방법연구 - 기획단계에서 실시설계 입찰까지 -)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.3-12
    • /
    • 2014
  • With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work.

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

A Study on the status and improvement of construction management through the Accomplishment instance DeaHakRo Complex cultural space (대학로 복합문화공간 수행사례를 통한 건설사업관리 향후 발전 방향에 관한 연구)

  • Moon, Youn-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.419-423
    • /
    • 2008
  • The necessity of specialized and systematic management has been a tendency to accomplish the goal of business efficiently according the trend of construction industry has become bigger, complicated and specialized as well as Placing an order of CM(Construction Management) Service has been Increased because it made viable and positive effect. Institutional plan is necessary CM application from planning, realistic estimation of CM service charge, converting understanding among paticipants for the business and inducing specialization through certifyizing CM qualification to develop CM. But, it makes some realistic and unexpected pro41ems in the middle of step-by-step CM management for doing its business. So we need to consider a measure. This study suggests problems in practical a)fairs and improved idea that it summarized each stage of a bid for CM, planning, construction contract. It shows direction to take root successfully and develop.

  • PDF

Process Improvements for Reducing Apartment Defects after Completion (준공후 아파트 하자 저감을 위한 절차개선 방안 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.355-361
    • /
    • 2018
  • Many defects are occurring in apartments, the main residential area in Korea. This is due to a lack of construction skills and a lack of management. As many apartments are provided to buyers, the dispute over defects after completion is increasing rapidly. The Housing Act was amended so that local governments could order contractors to repair defects. However, even if defects are resolved after a defect is generated, it is not a fundamental solution that can be satisfied because buyers have to endure the pain caused by the defect. So, it is necessary to protect the interests of buyers by fundamentally reducing defects in apartments. Therefore, in this study, it was suggested that the asymmetry of the information about the apartment buyers should be resolved at the time of sale of the apartment, the final drawings should be a contract document, the review period of the apartment house supervision should be secured, the appropriate supervisory fee should be secured at the time of contract change and the payment procedure should be improved.