• Title/Summary/Keyword: 설계업무

Search Result 1,970, Processing Time 0.034 seconds

Development of Framework for Support System on Outfitting Design of Ships (선박 의장설계 지원시스템을 위한 프레임워크의 개발)

  • Park, Min-Gil;Kim, Wan Kyoo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.12
    • /
    • pp.2987-2992
    • /
    • 2015
  • In this paper, we propose the framework under a standardized task configuration to improve data accuracy and to provide unified system for the outfitting production design in shipyards. Due to the mismatching engineering data, the wrong designs or drawings were produced. With these wrong information, the production process can be broken and faced a big problem during production stage. In this study, we propose novel framework and its components which can offer better supporting for the design task and its process to improve productivity and efficiency with knowledge based engineering support system.

A Product Management System for Productivity Enhancement (생산성 향상을 위한 생산 관리 시스템)

  • 김영진;오삼권;임기욱
    • Proceedings of the KAIS Fall Conference
    • /
    • 2001.05a
    • /
    • pp.322-325
    • /
    • 2001
  • 기업 내 관련 업무 및 조직의 유기적 연결을 통한 원활한 정보의 흐름은 생산성의 증대에 많은 영향을 주며 기업의 경쟁력과도 밀접한 관계가 있다. 이러한 이유로 연구개발에서부터 설계, 제조, 판매에 이르기까지 컴퓨터와 통신기술을 활용하여 기업의 업무 흐름을 통합적으로 관리할 수 있는 컴퓨터 시스템이 필요하다. 그러나 기업 내 업무의 성격 및 규모, 어플리케이션 튜닝 등의 충분한 검토가 수행되지 않은 컴퓨팅 시스템은 개발비용의 부담과 더불어 시스템의 성능을 오히려 저하시킬 수 있다 본 논문은 생산 제조 업체의 업무의 성격과 환경에 적합하고 업무의 흐름을 유기적으로 통합 관리할 수 있는 클라이언트/서버 기반 생산 관리 시스템을 설계 및 구현하였다.

A Study of Introduction of CMMI on Design Process for Improving Collaboration (설계협업 프로세스의 개선을 위한 CMMI 도입 방안에 대한 연구)

  • Jun, Joon-Ki;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.436-440
    • /
    • 2008
  • Evaluating the work process of the organization is necessary to improve efficiency and make high quality of results. As size of construction projects are bigger, it is also applied to design firm. By applying efficient process, design team can reduce rework and waste. To make systematic process and keep a continuous progress, process evaluation is required. On this study, CMMI(Capability Maturity Model Integration) concept is benchmarked. Originally CMMI is suggested to evaluating capability of work process of Soft Ware developing organization by SEI(Software Engineering Institute). From CMMI system, direction of making evaluating method of design project performing team is drove. After worked out the evaluation method of capability maturity of process in design team, it could contribute making progress in the design process and satisfying client.

  • PDF

Design of a Framework for Support System of Ship Design Engineering (선박 설계 엔지니어링 지원 시스템을 위한 프레임워크의 설계)

  • Kim, Wan Kyoo;Park, Min Gil;Han, Myeong Ki
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.10
    • /
    • pp.2316-2322
    • /
    • 2012
  • The present study investigates a standardized framework for support system of ship design engineering. The purpose of this research is to improve the efficiency of information gathering and its use in tasks of the ship design engineering support system. Due to their variety and complexity, the existing engineering methods tend to waste time in searching for the standardized method and knowledge or to cause errors on tasks. Generally, these kinds of system have serious problems. The most serious one among them is that the existing system consists of both useful and useless data. This finally leads engineers to a failure in finding out useful information from the system. We have designed a standardized framework, which enables users to properly recompose the menu form depending on the task process, simplifies the methods at several process levels, and provides a more intuitive method in user interface environment in order to resolve the existing problems, minimize the system-operating costs, and improve the efficiency of engineering tasks.

Design and Evaluation of Role-based Personalized Menu in Enterprise Portal (엔터프라이즈 포털에서 업무맞춤메뉴의 설계 및 평가)

  • Song, Sang-Sup;Park, Gyu-Nam;Kwak, Min-Soo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.306-309
    • /
    • 2009
  • 본 논문에서는 업무맞춤메뉴를 설계하여 기존의 연구지원포털에 구현하였고 사용로그를 분석하여 맞춤메뉴 사용비율과 설정유형의 2가지 측면에서 효과를 평가하였다. 사용비율은 연구지원포털의 트리구조메뉴 대비 업무맞춤메뉴의 사용횟수를 비교한 것인데 트리구조메뉴의 메뉴항목수 대비 업무맞춤메뉴의 항목수는 10%에 불과하지만 업무맞춤 메뉴를 사용한 비율은 43%로서 업무맞춤메뉴의 사용비율이 상대적으로 대단히 높은 것으로 나타났다. 설정유형으로는 (1) 사용자별로 사용빈도가 높은 메뉴를 종합하여 모아둔 유형, (2) 담당업무에 자주 사용하는 메뉴를 종합해서 모아둔 유형, (3) 동일업무를 자주 반복하다 보면 메뉴사용순서가 자연스럽게 정해지므로 사용순서 기반으로 메뉴를 설정한 유형의 3종류를 식별할 수 있었다. 이것은 사용자들이 자신의 필요성에 맞추어 적절하게 맞춤메뉴를 설정사용하고 있다는 것을 보여주는 것으로 해석된다. 분석결과로부터 사용편의성 측면에서 업무맞춤메뉴의 도입효과가 뛰어나고 사용자들의 자발적인 설정사용을 확인할 수 있었다. 또한 사용빈도가 낮은 메뉴항목까지 맞춤메뉴화 할 필요는 없으므로 트리구조메뉴와 병행하여 맞춤메뉴를 도입하는 것이 바람직하다는 점도 알게 되었다.

  • PDF

A Study on the Class Design Procedure of Application Design Method in the Business Based (업무중심의 애플리케이션 설계 방법 중 클래스 설계 절차에 관한 연구)

  • Kim, Tae-woo;Park, Sun-yi;Yeo, Jeong-mo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2018.10a
    • /
    • pp.544-546
    • /
    • 2018
  • 하나의 애플리케이션은 기업의 업무를 분석하여 어떻게 만들지 설계를 하고, 설계를 바탕으로 설계의 내용을 그대로 개발로 구현하게 된다. 설계의 내용을 그대로 개발로 반영하기 위해 소스코드에 대한 설계도 이루어져야 한다. 다양한 방법에 대해 연구되어 왔지만, 경험기반의 설계가 반영되어 설계자 및 개발자 간에 의사소통의 오류가 발생하고, 미경험자가 설계절차를 수행하기에는 어려움이 존재한다. 이를 해결하기 위해 본 연구에서는 분석된 업무를 바탕으로 정의된 화면설계를 바탕으로 클래스로 변환되는 절차를 제안하여 초심자가 효율적으로 설계절차를 수행할 수 있을것이며, 개발자 간에 원활한 의사소통이 이루어질 것이라 기대한다.

Consecutive Design VE Process Emphasized on Follow-up Activities (Follow-up 활동을 강조한 연속적 설계VE 프로세스)

  • Yang, Jin Kook;Moon, Sung Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.235-244
    • /
    • 2009
  • Design Value Engineering (VE) has become an import part of the daily design process since it has been introduced in the construction industry. Design VE is usually conducted in the general and execution design stages respectively. In order to increase the effectiveness of the VE process, the outcome from the general design VE activities should be integrated into execution design. The outcome from the execution design should be used again for construction. In this study, a consecutive VE process model has been presented as a way to improve the current practice of design VE activities in the construction industry. In the presented model, follow-up activities are emphasized to increase values from the life-cycle perspective of a construction project. The model was tested in a case study of an actual design VE process. The result of the study demonstrates that the model can: 1) effectively incorporate owners requirements; 2) assist decision making in selecting better construction; 3) increase the interface between general and execution design stages; and 4) trace the value flow more efficiently. Overall, the study results indicates that a the consecutive VE process model can be effectively applied when construction project are contracted for the life-cycle management of construction projects.

An Analysis of the importance in fire-stations' works and redesign by disaster management steps (재난관리 단계별 소방업무 중요도분석 및 업무재설계)

  • Park, Chanseok
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.4
    • /
    • pp.572-582
    • /
    • 2014
  • Fire-stations' works limited to the existing fire protection rescue and emergency services in rapidly changing disaster environment are not difficult to deal with the fire service demand of the people any longer. In this study, after calculating the importance of the disaster management about fire-stations' works by disaster management steps thorough a survey of experts about Fire and Disaster, firefighting tasks are to be redesigned. Experts have the higher rating in preparation step of firefighting tasks. Because securing resources and building systems in preparation step and safety training in prevention step have a high importance, it is required to improve efficiency of firefighting tasks through redesign. The most important point in redesign is to realize fire-stations' works are to expand and to develop such a policy if fire-offices excavate the civil and government cooperation works and provide such legal and institutional basis of establishment and operation. And it should be sought to maintain international cooperation for international disaster response. Ultimately, fire-offices will have further expansion in quality and simultaneously quantitatively by excavating 'collaboration (business cooperation)' or enhancing existing works in addition to existing 'fire and rescue, first aid' business.

A Study on the Critical Success Factors for Engineering step on Plant Project (플랜트 설계단계 핵심성공요인(CSF) 도출에 관한 연구)

  • Son, Jae-Ho;Han, Choong-Hee;Kim, Jae-On;Lee, Sang-Youb
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.227-234
    • /
    • 2007
  • 현재 플랜트 산업이 해외 건설 부문에서 차지하는 비중은 해외 건설 수주액의 60% 이상에 달하고 있다. 하지만 시공부문의 높은 기술경쟁력에 비하여 고부가가치 창출이 가능한 설계부문은 그 기술이 미흡한 실정이다. 따라서 본 연구에서는 플랜트산업의 우수설계능력 확보를 위하여 플랜트 설계단계의 성공에 대한 정의를 내리고, 플랜트 설계업무를 분석한 뒤, 설문조사를 통하여 플랜트 설계단계 프로세스의 업무별 중요도를 파악하였다. 또한 이렇게 파악된 중요도 점수를 공정관리 프로그램에 적용하였고, 이를 바탕으로 제시된 결과에 대한 전문가의 검토를 통하여 최종적으로 플랜트 설계단계의 핵심성공요인(CSF)을 도출하였다. 본 연구의 결과는 플랜트 설계단계 성공의 요인을 파악하고 확인 및 관리를 위한 요소들을 제시하여 설계단계 업무수행의 가이드라인으로 활용될 수 있을 것으로 기대된다. 또한, 향후에는 도출된 핵심성공요인을 이용하여 플랜트의 성공과 실패를 가름할 수 있는 정량적 평가모델 개발 등의 연구가 수행될 수 있을 것이다.

Study to Suggest Improvement Method for Increasing Efficiency of Multi-complex Design Work (복합단지 설계 업무의 효율성 향상을 위한 개선방안 연구)

  • Koo, Ja Kyung;Park, Eun Soo;Jun, Young Joon;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4D
    • /
    • pp.505-512
    • /
    • 2008
  • Over the past years, complex project which has the object to accomplish housing complex, commercial complex etc, recently is changing to multi-complex projects because of development in IT sector. Improvement in the quality of life, life pattern has been and is being changed, these modernized and improved version of life brings the concept of U-city. Department of urban planning and engineering, civil engineering and architecture engineering in every university educate students according to the changing world in order to handle these complex projects in real world. In most cases department of urban planning and engineering teach project planning and department of civil and architecture engineering teach project design and construction. In most of the projects planning followed by design and construction need to be accomplished, but current observation in the present curriculum shows that it is difficult to expect the continuity. The present curriculum of civil engineering has to change as complex projects deal with various different structures during the design and construction phase of these projects. This study examined curriculums from the department of urban and civil engineering related to structural design and construction and survey importance of design works which overlap urban and civil engineering targeted on design engineers. After understanding design works and results obtained from survey we propose for an advanced efficiency method.