• Title/Summary/Keyword: 사후환경영향조사

Search Result 87, Processing Time 0.023 seconds

Effects on Water Quality in the Development and the Comparative Analysis of Water Quality Results in Post-environmental Impact Investigation - Focused on a Quarry Mine and Sports Facilities - (개발 사업에 의한 수질영향조사 및 사후환경영향조사 수질결과에 대한 비교·분석 -토석채취사업 및 체육시설 조성사업을 중심으로-)

  • Lee, Seyong;Roh, Younghee;Cho, Hanna;Maeng, Junho
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.6
    • /
    • pp.524-537
    • /
    • 2017
  • Post-Environmental impact investigation(Post-EII) plays an important role in investigating and reducing the environmental impacts of construction operations in South Korea. To date, it has been estimated that the results for Post-EII showed the low reliability; however, understanding those reliability has rarely been studied. We investigated the effect on water qualities by construction operations of the quarry mine, training center, and golf club in South Korea. In addition, the results of water quality analysis in this study were compared and analyzed with those in Post-EII. Treated wastewater in a quarry mine showed high concentrations of biochemical oxygen demand(BOD), suspended solid(SS), total nitrogen(T-N), and total phosphorus(T-P). Compared with the water quality results between this study and Post-EII, the concentrations of BOD, SS, T-N, and T-P in the treated wastewater were higher than the interquartile range(IQR) as well as the range of the results from minimum to maximum in Post-EII(p<0.05). The concentrations of BOD, SS, T-N, and T-P in treated wastewater were high under constructions in a training center. The concentrations of BOD and SS exceeded the consultation standard for the treated wastewater. These concentrations showed the significant difference with the IQR and the range from minimum to maximum of the water quality results in Post-EII(p<0.05). Therefore, the management and monitoring for water quality should be conducted in the treated wastewater by of construction operations. In addition, the alternative to enhance the reliability for the water quality results should be sought in Post-EII.

A Study on Future Direction and Practical Strategy for the Development of Environmental Impact Assessment Follow-Up (환경영향평가 사후관리의 발전방향 설정과 실천전략 모색)

  • Park, Ji Hyeon;Choi, Joon Gyu
    • Journal of Environmental Impact Assessment
    • /
    • v.25 no.3
    • /
    • pp.165-174
    • /
    • 2016
  • The Environmental Impact Assessment(EIA) follow-up is integral phase of the EIA system. The EIA is complemented and completed by the EIA follow-up and the experience and data accumulated during the process contributes to the advancement of the EIA system. In Korea, institutional foundation of EIA is acknowledged as having been settled. Therefore, eyes are now on the qualitative growth of the EIA system including the normalization of the EIA follow-up management. In relevant prior studies there are many suggestions to make advancement of the EIA system. Nevertheless, it is difficult to apply the real system because most suggestions need prior preparation. Given the context, we propose a practical step-by-step strategies for the vitalization and advancement of the EIA follow-up system while recommending the direction for the development in this study.

Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.

The research for the influence of air quality by the operation of the sweepings incinerator in Haeundae New Town (해운대 신시가지 종합처리장 내의 소각장 운전에 따른 대기질 영향의 조사)

  • 이영준;성봉조
    • Proceedings of the Korea Air Pollution Research Association Conference
    • /
    • 2001.11a
    • /
    • pp.371-372
    • /
    • 2001
  • 부산광역시 소재의 해운대 종합처리장(소각장, 하수처리장)운전에 따른 사후환경영향조사의 일환으로, 해운대 소각장 주변 반경 2km이내 영향 예상지역에 대한 대기질 조사로서 ⅰ) 아황산가스, 일산화탄소, 이산화질소, 오존 등의 대기환경기준항목 7가지, 알루미늄, 카드뮴, 크롬 등의 중금속류 8개 항목, 벤젠, 톨루엔 등의 휘발성유기화합물질 4개 항목에 대한 측정 및 분석을 실시하고, ⅱ) 종합처리장 주변의 대기질 실측조사를 통하여 나타난 자료를 바탕으로 향후 대기질에 의한 주변 환경상의 영향을 종합 분석하여 그 개선방안을 수립하고자 한다. (중략)

  • PDF

The research for the influence of air quality by the operation of the sweepings incinerator in Haundae New Metropolis (2001년도 해운대 신시가지 종합처리장 내의 소각장 운전에 따른 주변 대기질 영향의 조사)

  • 이영준
    • Proceedings of the Korea Air Pollution Research Association Conference
    • /
    • 2002.11a
    • /
    • pp.367-368
    • /
    • 2002
  • 부산광역시 해운대 신시가지 소재의 생활폐기물 소각장 운전에 따른 사후환경영향조사의 일환으로, 소각장 주변 반경 2km이내의 영향 예상지역에 대한 대기질 조사로서 ⅰ) 아황산가스, 일산화탄소, 이산화질소, 오존, 분진, 납 등의 대기환경기준항목 7가지, 알루미늄, 카드늄, 크롬 둥의 중금속류 8개 항목, 벤젠, 톨루엔 둥의 휘발성유기화합물질 4개 항목에 대한 측정 및 분석을 실시하고, ⅱ) 종합처리장 주변의 대기질 실측조사를 통하여 나타난 자료를 바탕으로 향후 대기질에 의한 주변 환경상의 영향을 종합 분석하여 그 개선방안을 수립하고자 한다. (중략)

  • PDF

Consistency Analysis between Predicted and Measured PM10 and NO2 Air Quality During Environmental Impact Assessment of Linear Construction Projects (선형사업에 대한 환경영향평가 시 대기질 예측치와 실측치의 정합성 분석 - PM10과 NO2를 중심으로 -)

  • No Ol, Lim;Hyun Chan, Sung;Sun Jeong, Kim;Ji Young, Kim;Seong Woo, Jeon
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.6
    • /
    • pp.378-387
    • /
    • 2022
  • Since air pollution has become a global issue to be managed, the Republic of Korea (ROC) is protecting air quality by predicting the air condition before a construction project starts through EnvironmentalImpact Assessment (EIA) and measuring the air condition afterwards the construction project ends through Post-environmental Impact Assessment (PEIA). The aim of this study consists on verifying the predicted and measured concentration data and analyzing their consistency in order to deduce improvement directions. Linear EIA projects which the investigation during operation period have been concluded between years 2017 and 2019 were used. As a result, the following improvement directions were suggested: reduction of EIA air quality standards, strengthen the management of projects with construction duration longer than 5 years, incorporation of first or second quarter (winter or spring) into the investigation period, consideration of construction equipment or conditions for better prediction. The strength of this study is that we arranged and utilized EIA predicted and PEIA measured data to understand the present EIA procedure and made meaningful suggestions through the consistency analysis contributing to air quality maintenance and investigation methodology enhancement.

A Study on the international case studies for SEA follow-up (전략환경평가 사후관리 해외 사례 분석)

  • Cho, Hanna;Park, Joo-Yang
    • Journal of Environmental Impact Assessment
    • /
    • v.24 no.4
    • /
    • pp.375-385
    • /
    • 2015
  • This study analyzed international case studies on Strategic Environmental Assessment (SEA) follow-up and suggested implications based on the study's findings to aid implementation of SEA follow-up in Korea. SEA requires follow-up in order to identify unforseen adverse effects and enable appropriate remedial action to be taken. Tool kits and methodological framework for effective SEA follow-up are only being researched recently. Based on the study's findings, following implications for implementing SEA follow-up in Korea were drawn. First, the system of carrying out SEA follow-up would be different depending on the PPP topic. During the scoping stage, significant impacts should be identified according to the PPP topic, and thus help determine the indicators to be developed in the later stage. Secondly, responsibility, method, time, intervals and actions from SEA follow-up may vary depending on the target SEA consultation. Thirdly, the indicators of SEA follow-up may be considered together with various environmental standards and current political, social and economic indicators which are a big issue in society. Fourthly, SEA follow-up can be used as an integration system of its target planning and environmental planning. Finally, SEA feedback system should be needed. The result of SEA follow-up should be used for target PPP. These would lead to improvements to the target PPP. If SEA follow up is successfully implemented and actively carried out for domestic PPPs, Korea can be a step closer to realization of sustainable development.

A Study on Adopting an Ex Post Facto Management System and Reforming the Maritime Traffic Safety Audit Scheme (해상교통안전진단 사후관리제도의 도입 및 제도개선에 관한 고찰)

  • Kim, Inchul
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.7
    • /
    • pp.807-813
    • /
    • 2016
  • The Maritime Traffic Safety Audit Scheme was institutionalized in 2009 to provide for professional surveys, measurement and the evaluation of navigational hazards that might occur in coastal waters in the course of marine work. Related researches that dealt with the reform of the Maritime Traffic Safety Audit Scheme found that there were no rules or regulations for verifying whether marine work conformed to audit results and reviewing the exactitude of ship handling simulations which were a crucial part of the scheme. According to the necessity of adopting an ex post facto management system in the field of maritime traffic, this study analyzed the similar audit acts such as the Natural Environment Impact Audit Scheme and the Road Traffic Safety Audit Scheme, and proposed specific articles for revising Maritime Safety Act in order to break out from the institutional inertia of the current Maritime Traffic Safety Audit Scheme. It is expected that a newly proposed legal system for verifying the performance of audit results and the exactitude of audits will help improve maritime traffic safety by eradicating potentially hidden hazards related to marine work.

A Study on Environmental Impact Assessment Guidelines for Marine Environments in Harbor Construction Projects (항만건설사업의 해양환경 환경영향평가 가이드라인 개발 연구)

  • Maeng, Junho;Kim, Taeyun;Lee, Haemi
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.3
    • /
    • pp.141-160
    • /
    • 2022
  • The harbor construction projects can lead to various marine environmental problems including habitat degradation and loss, marine water pollution, change of flow patterns, erosion, scour, sedimentation, and so on. The EIA is a measure to prevent various environmental problems in advance from examining and minimizing the environmental impacts before the proposed developments are implemented. In addition, institutions reviewing EIA reports have made efforts to conduct scientific and standardized EIA by applying EIA guidelines for each project. This study aims to create a EIA guideline focusing on the harbor construction projects. Based on the review comments of the harbor construction EIA reports for the past 13 years (2009-2021) and the EIA guidelines of different types of projects, we identified the marine environmental problems and provided the appropriate guideline. This guideline summarizes and presents the contents which must be reviewed in the baseline condition survey, impact assessment, mitigation, and post-environmental impact investigation in the fields of marine fauna and flora, marine physics, and marine water and sediment quality. In the case of a baseline condition survey of marine fauna and flora, a method for selecting survey points considering the characteristics of sea area and project was presented. When estimating the impact of marine fauna and flora, we presented methods for predicting the impact on them due to the spread of suspended sediments and the damage to benthic habitats due to dredging and reclamation. In consideration of the characteristics of the sea area, we divided the survey items of the marine physics into essential items and supplementary items. In predicting the impact of marine physics, various methods for major issues such as seawater circulation, suspended sediment and bottom sediment transport, water temperature and salinity diffusion, seawater exchange, wave transformation, harbor tranquility, and shoreline change were presented. The research results will contribute to protect the marine environment by inducing more systematic and scientific surveys, impact assessments, and mitigation in the EIA process.

Improvement of the Environmental Impact Assessment and Post-environment Impact Survey Reports Using Marine Environment Assessment Indices (해양환경 평가지수를 활용한 환경영향평가서 및 사후환경영향조사결과 통보서 개선 방안 연구)

  • Lee, Eojin;Kim, Taeyun
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.2
    • /
    • pp.61-74
    • /
    • 2021
  • In this study, we used marine environment assessment indices to evaluate impacts of various development projects on the marine environment. TheWaterQuality Index (WQI) was applied in the field of marine water quality and the Cleanup Index of Harmful Chemicals (CIHC), the Cleanup Index of Eutrophication (CIET), the Enrichment Factor(EF) were used in the field of marine sediment. In the field of marine benthic organisms, the Benthic Health Index (BHI) and the Benthic Pollution Index (BPI) were utilized. Each assessment index was calculated using the data observed in the development project, and its characteristics and usefulness were evaluated. The assessment method and criteria were clearly defined for WQI, CIHC, and BHI. Furthermore, through these indices, an integrated environment impact analysis was possible. Apart from the indices presented in this study, there are various indices that can be used for evaluating the marine environment. Therefore, it is important to utilize appropriate indices according to the characteristics of each project.