• Title/Summary/Keyword: 사후분석

Search Result 2,557, Processing Time 0.025 seconds

A Study on the Improved Post-Analysis Development System in the Naval Combat System

  • Seo, Chang-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.12
    • /
    • pp.197-207
    • /
    • 2022
  • The Naval Combat System operates in multiple software components for efficient functional processing. Data transmission and reception between components is performed in real time using DDS(Data Distribution Service). Reliable Post-Analysis requires the collection of all DDS messages. However, Software workload and development costs increase because common functions for all messages must be developed directly. In the paper, We propose an improved Post-Analysis based on the Feature Model and a new development system using it. Functions for the modified message were applied as variable domains of the Feature Model. When Build Center updates Post-Analysis, it automatically processes all software tasks associated with Post-Analysis. The proposed development system simplified the overall work procedure, and work time was significantly reduced compared to the existing development system.

A study on the Improvement of the Construction Post-evaluation System in Public Construction Projects (건설공사 사후평가시스템의 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk;Yang, Sung-Hoon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.305-308
    • /
    • 2015
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 국토교통부에서는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 이를 활용할 수 있도록 건설공사 사후평가 시행지침을 기초로 한 건설공사 사후평가시스템을 구축하여 운영 중에 있다. 하지만 사후평가 시행지침의 개정에 따라 입력양식 및 관리항목이 변경되고, 축적된 사후평가 결과정보의 분석기능 등의 부족으로 유사 건설사업 수행시 활용 체계가 미흡한 실정이다. 본 연구에서는 건설공사 사후평가 시행지침의 개정과 분석 및 통계기능 강화를 위해 따라 건설공사 사후평가시스템의 개선방안을 제시하고자 한다. 이를 통해 사후평가시스템의 활용도를 제고하고 유사 공공건설사업 수행시 시행의 효율성을 도모할 수 있으리라 예상된다.

  • PDF

A Study on the Development of Efficient Naval Combat System Tactical Record and Replay Software (효율적인 해양 전투체계 전술정보 기록 및 재생 소프트웨어 개발에 대한 연구)

  • Jung, Seung-Mo;Yang, Moon-Seok
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2019.07a
    • /
    • pp.35-36
    • /
    • 2019
  • 최근 해양 전투체계에서는 사후분석에 대한 기능이 중요시 되고 있다. 그 이유는 사후분석을 통해 작전을 분석하고 더 나은 작전을 수행할 수 있기 때문이다. 이를 가능하게하기 위해 해양 전투체계에는 전술정보 기록 및 재생 기능이 탑재되어 있다. 전술정보 기록 및 재생은 작전상황에서 전투체계 콘솔에 전시된 전술정보들을 기록해서 사후분석 및 평가를 위해 재생하는 기능이다. 본 논문에서는 전술정보 기록 및 재생 개발에 대한 효율화 방법을 제시한다. 모델 중심의 개발방식 적용과 재생시간의 효율화를 통해 기존방식 보다 효율적인 전술정보 기록 및 재생 소프트웨어를 개발하는데 그 목적을 가진다.

  • PDF

Effective Analysis Framework for Construction Post Evaluation (건설공사 사후평가 수행결과의 효과적인 분석방법)

  • Kim, Tae Yeong;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1145-1152
    • /
    • 2016
  • A construction post evaluation is introduced to provide information that can be used for similar construction projects in the future through the evaluation of the efficiency of a public construction project and the verification of the appropriateness of the project results. However, it is not widely used due to a lack of awareness of the method. For this reason, the aim of this study is to provide a basic frame that can be utilized as a reference for a similar project in the future based on the construction post evaluation. More specifically, a more effective analysis method for the construction post evaluation is proposed and then an exemplary analysis is performed based on the method. The paper analyzes 293 cases stored in construction CALS. Construction cost growth rates of railway projects are tend to be greater than other project types like highway, expressway, and harbour. Then, construction schedule grwoth rates of expressway are greater than others. This is expected to provide useful information for a future project, and serve as a basic frame. Moreover, it is also meaningful that a project can be analyzed from different perspectives through the construction post evaluation.

An Establishment of Guideline and Evaluation Items for Before-and-After Study in Railroad Construction Projects (철도건설공사 사후평가 항목 및 지침 수립방안)

  • Kim, Yeon Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.315-322
    • /
    • 2011
  • The Korea government set a Act called as Before and After Study for a huge SOC projects in order to check their feasibility again at the time of design, construction and completion period. However, the evaluation items and analysis method are so vague that its effectiveness has been challenged. Especially railroad projects need to be evaluated differently by railroad construction types and rolling stocks. This paper suggests the evaluation items as a common items and exclusive items on the type of construction and rolling stocks. Also data collection in the standardized form and GIS techniques and are introduced to analyze evaluation items effectively.

A Study of Error Analysis for Post Evaluation System on the Construction Projects (건설공사 사후평가시스템 입력오류 분석에 관한 연구)

  • Kim, Kyong-Hoon;Lee, Du-Heon;Kim, Tae-Yeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.77-85
    • /
    • 2015
  • The data are often missed and many errors of the data are generated in the input process for the post evaluation system on the construction projects, and the reliability of the data falls down much. Accordingly, the detailed analysis about missing and error of data was conducted to ensure reliability of the analysis results about post evaluation on the construction projects. As results in this study, a lot of input data were missed at the initial construction phase, and the data errors were found in the inaccuracy of reference reports, the lack of understanding about input data, and the failure of KRW unit.

A Case Study on the post-monitoring programs under the energy efficiency labeling program (주요국의 에너지효율등급제 사후관리 사례 분석)

  • Lim, Ki Choo
    • Journal of Energy Engineering
    • /
    • v.23 no.3
    • /
    • pp.58-65
    • /
    • 2014
  • The study examined the post-monitoring programs under the energy efficiency labeling program in developed countries. This study suggests a few solutions to improve the post-monitoring activities under the program. First, samples should be selected from each category for the post-monitoring activities, taking account of the consumer's continuous buying behavior. Second, it is necessary to check of detailed label contents and to perform the frequent monitoring the reinforcement of the measurement of items which have violated labeling more than once over the past few years. Last, this study suggests that the entire post-monitoring process should be disclosed and be posted on the websites on the internet in general.

Association between Object and Sonar Target for Post Analysis of Submarine Engaged Warfare Simulation (잠수함 교전 시뮬레이션의 사후분석을 위한 객체와 소나 표적간의 연관 기법)

  • Kim, Junhyeong;Bae, Keunsung
    • Journal of the Korea Society for Simulation
    • /
    • v.26 no.3
    • /
    • pp.65-72
    • /
    • 2017
  • We propose a method to generate the object-target identifier mapping information for system performance and effectiveness analysis of submarine engage system and verify the validity of the proposed method through experiments. In the submarine model of the engage simulator, the signal processing algorithm of the actual sonar system is installed. In the target information obtained through the sonar or signal processing process, the actual object information is not known, and the simulator does not provide such information. Therefore, in this study, we generated identifier mapping information for simulation post-analysis by using bearing, range, and speed of the target obtaind from sonar signal processing and the object collected.

Reliability Analysis of Agricultural Machinery Parts using Weibull Distribution (와이블 분포를 이용한 농기계 부품의 신뢰도 분석)

  • 박영준;이윤세;김경욱
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2002.07a
    • /
    • pp.148-153
    • /
    • 2002
  • 사후봉사의 핵심은 신속한 고장 수리와 원활한 부품 공급이다. 일정 지역을 담당하고 있는 사후봉사 업소가 보유해야 할 수리 부품에 대한 적정 재고량 산정은 사후봉사 업소의 안정적인 경영뿐만 아니라 원활한 사후봉사의 기능을 위해서도 대단히 중요한 일이다. (중략)

  • PDF

"사전조사.분석" 활성화를 통한 전력투자사업의 효율성.경제성 제고

  • Jeong, Gi-Hyeon
    • Defense and Technology
    • /
    • no.10 s.296
    • /
    • pp.26-37
    • /
    • 2003
  • 사전조사.분석은 사후분석 및 조치에 비해 매우 효과적이며 불필요한 예산의 낭비를 막을 수 있는 첩경이다. 전력증강에 종사하는 담당자들이 사전조사.분석의 중요성을 제대로 인식하지 못하고 소홀히 해 왔던 것이 사실이며, 이제는 전력투자사업에 대해 사업착수 전에 늦어도 사업추진 초기에 군 내부뿐만 아니라 외부의 전문가들과 종합적이고 전문적인 사전조사.분석을 수행하도록 해야 한다.

  • PDF