• Title/Summary/Keyword: 사후관리제도

Search Result 136, Processing Time 0.023 seconds

A Study on Future Direction and Practical Strategy for the Development of Environmental Impact Assessment Follow-Up (환경영향평가 사후관리의 발전방향 설정과 실천전략 모색)

  • Park, Ji Hyeon;Choi, Joon Gyu
    • Journal of Environmental Impact Assessment
    • /
    • v.25 no.3
    • /
    • pp.165-174
    • /
    • 2016
  • The Environmental Impact Assessment(EIA) follow-up is integral phase of the EIA system. The EIA is complemented and completed by the EIA follow-up and the experience and data accumulated during the process contributes to the advancement of the EIA system. In Korea, institutional foundation of EIA is acknowledged as having been settled. Therefore, eyes are now on the qualitative growth of the EIA system including the normalization of the EIA follow-up management. In relevant prior studies there are many suggestions to make advancement of the EIA system. Nevertheless, it is difficult to apply the real system because most suggestions need prior preparation. Given the context, we propose a practical step-by-step strategies for the vitalization and advancement of the EIA follow-up system while recommending the direction for the development in this study.

A Comparative Study on Domestic and Foreign the Follow-up Service of Temporary Equipment and Materials (국내외 가설기자재 사후관리제도 비교 연구)

  • Woo Kwang-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.74-82
    • /
    • 2002
  • The performance testing system of temporary construction equipment and materials are a previous inspect institution to produce only goods beyond the limited-performance, be certificated through a previous test, the purpose of which is to prevent an illegal goods from spreading abroad. The formal certification not only pass the test in an ordinary means but also isn't the term of validity on a certificated goods. Because of the above two reasons, an accident doesn't reduce, and a illegal goods become to be circulated. So, in this study, we analysis the problem of the follow-up service based on the formal certification and we suggest the improvement through comparative study on the follow-up of domestic and foreign.

A Study on Adopting an Ex Post Facto Management System and Reforming the Maritime Traffic Safety Audit Scheme (해상교통안전진단 사후관리제도의 도입 및 제도개선에 관한 고찰)

  • Kim, Inchul
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.7
    • /
    • pp.807-813
    • /
    • 2016
  • The Maritime Traffic Safety Audit Scheme was institutionalized in 2009 to provide for professional surveys, measurement and the evaluation of navigational hazards that might occur in coastal waters in the course of marine work. Related researches that dealt with the reform of the Maritime Traffic Safety Audit Scheme found that there were no rules or regulations for verifying whether marine work conformed to audit results and reviewing the exactitude of ship handling simulations which were a crucial part of the scheme. According to the necessity of adopting an ex post facto management system in the field of maritime traffic, this study analyzed the similar audit acts such as the Natural Environment Impact Audit Scheme and the Road Traffic Safety Audit Scheme, and proposed specific articles for revising Maritime Safety Act in order to break out from the institutional inertia of the current Maritime Traffic Safety Audit Scheme. It is expected that a newly proposed legal system for verifying the performance of audit results and the exactitude of audits will help improve maritime traffic safety by eradicating potentially hidden hazards related to marine work.

An Empirical Research on the AEO utilization satisfaction effect from the AEO system's government support and post management (AEO 제도의 정부지원과 사후관리가 AEO 활용 만족도에 미치는 영향에 대한 실증적 연구)

  • Kim, Chang Bong;Han, Young Tak
    • International Commerce and Information Review
    • /
    • v.17 no.2
    • /
    • pp.151-171
    • /
    • 2015
  • Recent companies have introduced AEO (Authorized Economic Operator) system for a smooth and fast customs clearance to meet the conflicting objectives of trade security and trade facilitation in international trades. The present study was to verify 150 companies that have acquired Korea's AEO certification and its impact from the government and financial support, the effects of AEO certification post management, and the AEO system's utilization satisfaction to seek ways to further activate the AEO system. The research hypothesis and model was derived on the basis of existing theory and empirical research, and obtain the following results. First, government policy supporting the AEO system after certification post management showed positive (+) effect for the AEO satisfaction. Second, AEO certification post management showed positive (+) effect for AEO satisfaction. Third, government funded factor showed negative (-) effect for AEO certification post management. The present study is differentiated from previous research information. The study evaluated the company's satisfaction with the AEO certification, and the government support has empirically evaluated the relationship between the post management and the satisfaction. Academic contribution was conducted for Korea's AEO system's post follow-up research while a practical contribution suggested the direction for our country's organization to take advantage of the AEO system.

  • PDF

Improvement scheme of utilization of the results of the post-construction evaluation system (건설공사 사후평가 수행결과 활용도 개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.78-89
    • /
    • 2013
  • Post-evaluation system reflects the results of performing a public construction project in the future similar public construction projects to be utilized in the planning. However, the current system simply compares the expected values, such as demand, B/C ratio, cost of construction, construction period, with the actual values after the completion of construction. In addition, most public owner does not actively conduct the post-construction evaluation tasks, so that the evaluation results has not been returned to early stage of a construction project. In this study, status of the post-construction evaluation system is investigated by a survey of the public owner and the construction project evaluation system of the United States and Japan was analyzed. This paper presents the improvement scheme of utilization of the results of the post-construction evaluation system. Through improving the post-construction evaluation system, it is expected that public agencies would easily utilize the post-construction evaluation.

Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.

Research for Relations between Satisfaction of Participants and Intension of Participation in terms of Evaluation Indicators of Public Management System (공공관리제도의 평가지표에 대한 사업참여자의 만족도 및 사업참여의사에 관한 연구)

  • Lee, Jeong-Jae;Kim, Gu-Hoi;Lee, Joo-Hyung
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.5
    • /
    • pp.269-281
    • /
    • 2016
  • This research made a evaluation indicators of public management system for operating efficient urban and housing redevelopment. We analyzed how satisfaction of participants about the evaluation indicators are used to parameters and affects intension of participation structure by using PLS structural equation model. We choose result evaluation tools: Foucs Group Interview and Balanced Score Card for appraising public management system. Specifically, We categorized setting business planning and selecting business tool, operating participation groups, motivating participation, post management and sustainability, and economics of business. As a results of the evaluation, setting business planning and selecting business tool, post management and sustainability, and economics of business influence comprehensive satisfaction. Post management and sustainability, economics of business, and setting business planning and selecting business tool turned out that they are very influential in the arranged order.