• Title/Summary/Keyword: 사업화 모형

Search Result 316, Processing Time 0.027 seconds

A Study on the Relationship between TLO Organization and Technology Transfer Performance: Focused on Government-Funded Research Institutes (TLO 조직과 기술이전 성과의 관계에 관한 연구: 정부출연연구기관을 중심으로)

  • Yun, Jang-ho
    • Journal of Technology Innovation
    • /
    • v.25 no.4
    • /
    • pp.165-187
    • /
    • 2017
  • This study analyzed the effects of TLO's organization size, expertise, and economic compensation on technology transfer performance using the panel data of Government-Funded Research Institutes in 2013-2016. First, the size of TLO personnel and budget have a positive effect on the technology transfer performance. However, in the case of TLO manpower, the statistical significance of the effect on the number of technology transfers was only 90%, and it did not affect royalty. Second, TLO expertise has a strong impact on technology transfer performance. It shows that the number of professional license holders, such as patent attorney or a technology valuer, has a statistically significant effect on the increase of the technology transfer number and the royalty under the 99% confidence level. However, unlike expected, the size of the Ph.D. did not seem to have any effect on technology transfer performance. Finally, the economic compensation for TLO does not affect both the number of technology transfers and the royalty. It does not seem to work as an appropriate incentive system, because the absolute size of the compensation is too small. The results of the above analysis suggest that it is important to secure expertise in order for the TLO organization to play a substantial role, and it is necessary to improve the economic compensation system to attract TLOs to technology transfer.

Estimation of future probabilistic precipitation in urban watersheds and river flooding simulation considering IPCC Sixth Assessment Report (AR6) (IPCC 6차 평가 보고서(AR6)를 고려한 도시 유역 확률 강우량 산정과 하천 침수 모의)

  • Jun Seo Yoon;Im Gook Jung;Da Hong Kim;Jae Pil Cho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.88-88
    • /
    • 2023
  • 지난 100년 동안 전 지구의 기상 이변이 꾸준히 증가하고 있다. 기후 변화는 도시 홍수 피해에 큰 영향을 끼치는데 급속한 도시화와 이상 기후로 인한 돌발 강우 패턴의 증가는 도시 침수의 취약성을 가중시킨다. 또한 급격한 도시 발전으로 인한 도심지의 불투수율 또한 꾸준히 증가하였다. 특히 2022년 8월 8일에 강남역과 도림천 일대에 내린 기록적인 강우는 기후 변화를 실감하게 하는 사회적 이슈가 되었으며 도심지 미래 수방 대책 변화를 상기시키는 계기가 되었다. 이로 인한 재해 피해에 최소화하기 위해 미래 기후 변화를 고려한 도심지의 새로운 방재 목표강우량 설정이 필요하다. 하지만 전 지구 모형(GCM)의 기후 변화 시나리오는 일 단위(Daily) 상세화 자료를 보편적으로 사용하고 있다. 하지만 이는 단기 강우 자료를 필요로 하는 도시 홍수 모의에서 제대로 활용할 수 없는 한계를 가지고 있다. 따라서 본 연구는 2019년에 발간된 IPCC 6차 평가 보고서(AR6)가 제안하는 SSP(Shared Socioeconomic Pathways, 공통사회경제경로) 시나리오를 기반하여 상세화된 일 단위(Daily) 강우 데이터를 비모수적 통계 기법을 사용하여 시간 단위(Hourly)로 상세화하였다. 또한 지속 시간별 연 최대치 강우를 추출하여 빈도 해석을 통해 도시 유역의 미래 확률 강우량을 제시하였으며, 서울시 상습적인 침수 취약 지역인 도림천 유역에 강우-유출 모형(XP-SWMM)을 사용하여 미래전망 기후 자료인 SSP2-4.5와 SSP5-8.5에 따른 미래 확률 강우 침수 모의를 실시하였다. 본 연구의 결과는 최신 기후 변화 시나리오를 고려한 서울시 방재 성능 목표 강우량 산정에 활용 가능할 것으로 사료되며 미래 강우량 침수 모의를 통해 침수 취약 구역인 도림천 일대 홍수피해의 근거 자료가 되는 것에 의의를 둔다. 또한 치수 분야에서 기후 변화를 고려하기 위해서는 기후 변화 시나리오에 따른 시간 단위 자료의 상세화가 필요함을 시사한다.

  • PDF

A Study on Models of Economic Performance Analysis for Science and Technology Information Management Distribution Project (과학기술정보 관리·유통사업의 경제성 분석 모델 수립에 관한 연구)

  • Park, Sung-Uk;Lee, Pill-Woo;Hahn, Sun-Hwa;Lee, Sang-Hwan;Hwang, Seog-Won
    • Journal of Information Management
    • /
    • v.43 no.3
    • /
    • pp.43-59
    • /
    • 2012
  • We established economic models for economic performance analysis in order to respond to changes in a rapidly changing environment. We tried to maximize business efficiency and performance of science and technology information management distribution project. The science and technology information management distribution project is significantly different from general R&D project. In this paper, it is meaningful to develop economic models to analyze economic outcomes for science and technology information management distribution project. We anticipate that these models will contribute greatly to economic performance analysis for science and technology information management distribution project.

Quantitative Assessment of Nonpoint Source using the Basin Model (유역모형을 이용한 비점오염원의 정량적 평가)

  • Kwon, Heon-Gak;Kim, Dong-Il;Lee, Jea-Woon;Han, Kun-Yeun;Cheon, Se-Uk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.141-141
    • /
    • 2012
  • 비점오염물질은 강우 시 유출되기 때문에 일간, 계절 간 유출량 변화가 대단히 크게 나타나며, 기후, 지형, 토지이용, 토양 등과 지역적인 특성과 유역 형상에 따라 변화되므로 비점오염원 유출량에 대한 정량화를 위해서는 강우지속시간동안 정확한 수질과 유량에 대한 측정 자료가 요구된다. 따라서 본 연구에서는 비점오염물질에 대해 현장 모니터링 및 현장 실측 관련 기존 연구자료 수집을 통해 중분류 토지피복분류별 원단위를 산정하였다. 또한 특정 유역에 중분류 토지피복 분류별 산정된 원단위를 적용하여 유역기반의 비점오염부하량을 산정 하였다. 대상 유역에 해당하는 하천 말단에서의 실측 자료를 활용하여 유역모형을 구축하고, 강우를 입력 자료로 하여 비점오염 물질별 부하량을 모의 산정하였다. 유역모형으로 HSPF(Hydrologic Simulation Program - Fortran)을 실제 대상유역에 적용하였고, 이에 따른 모의 결과를 실측치와 비교하여 부하량을 산정하였다. 이렇게 모의 산정된 부하량은 실측자료를 기반으로 산정된 원단위의 적용에 따른 부하량과 비교 검토하여 유역에 대한 비점오염원 부하량 산정 시 모형의 적용 가능성을 평가하였다. 본 연구에 적용된 대상유역은 동천유역으로 병성천의 주요 지류로서 유역의 상단에 위치하고 있다. 중분류 토지피복 중 공업지역, 교통지역, 과수원재배지, 비닐하우스재배지, 기타재배지에 대해서는 2008년부터 2010년까지 모니터링을 실시하였고, 이외의 중분류 토지피복에 대한 결과는 수계별 현재까지 진행되고 있는 환경기초조사사업 중 '주요 비점오염원 유출 장기 모니터링'사업의 자료를 활용하였다. 동천유역의 비점오염원 발생부하량을 산정한 결과, BOD 부하량은 대지의 경우 391.4 kg/day로서 중분류 군으로 구분한 결과에 비해 높게 산정되었다. T-N, T-P 발생부하량도 토지피복군이 대분류에서 중분류로 변화됨에 따라 부하량의 차이가 발생 하였다. 또한 동천유역에 대해 구축된 HSPF 모형의 적합도를 시기별 4개의 Case로 구분하여 평가해 보았는데 그 결과, 모형 모의치의 실측치에 대한 적합도가 높게 평가 되었다. 현재 특정 지역에 편중되어 조사되고 있는 중분류 토지피복을 조사 기관간의 교차 조사를 통해 지역적 제한성을 낮추고, 중분류에 속하는 세부피복지점을 확대하여 모니터링 지점의 다양성을 확보하여야 할 것으로 판단된다. 이와 동시에 한시적인 조사가 아닌, 장기간에 걸쳐 연구가 진행 될 경우 원단위에 대한 현재의 불확실성 및 제한성을 줄일 수 있을 것으로 판단되므로, 이러한 기초 자료 확보에 대한 장기적인 투자와 노력이 수반될 시 우리나라에 대표적으로 적용할 수 있는 비점오염원 원단위가 산정될 것으로 생각되며, 이러한 기틀이 마련되어야 비점오염원에 대한 적절한 유역관리방안을 수립할 수 있을 것으로 생각된다.

  • PDF

Comparative Analysis of Default Risk of Construction Company during Macroeconomic Fluctuations (거시경제변동 전후 건설기업의 부실화 비교분석 - IMF 외환위기 및 서브프라임 금융위기 전후를 중심으로 -)

  • Choi, Jae-Kyu;Yoo, Seung-Kyu;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.60-68
    • /
    • 2012
  • The past IMF foreign exchange crisis and subprime financial crisis had a big influence on variability of macroeconomics, even if the origin of its occurrence might be different. This not only had a significant infrequence on the overall industries, but also produced many insolvent companies by being closely linked with a management environment of an individual construction company leading the construction industry. Actually, the level of default risk of construction companies before and after fluctuation of macroeconomics gets to experience a rapid changing process, and a difference in reaction against shock exists according to each company. Accordingly, the purpose of this paper is to confirm the fluctuation process of the default risk of construction companies under the fluctuation of macroeconomics such as the IMF financial crisis and the subprime mortgage crisis. As an analysis result, it is judged that the subprime financial crisis gave bigger shock to construction companies than the foreign exchange crisis, and it is expected that this would have a relation with the construction market before shock of macroeconomics. In addition, it was analyzed that when comparing insolvent companies with normal companies, the recovery speed of normal companies is faster. It is judged that this was affected by a difference of internal business capacity between insolvent companies and normal companies.

An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project (택지개발사업의 공공주택건설공사비 추정의 실증적 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.81-88
    • /
    • 2011
  • Providers haven't recently had a flexible construction cost estimation system to meet various needs of consumers about public housing. So the subject of this study is to estimate construction cost reasonably in early project stage of public housing and then develop reliable means which is able to support construction cost management and establish a adequate funding investment plan as a provider. In this study, Regression analysis was performed by the case on 20 public apartment complex which were designed from the first half of 2007 to the first half of 2008. A total construction cost of construction, civil engineering, machinery, elevator, land scape, electricity and communication work was used as one sample for increasing explanation and representativeness of the case. In addition, The total construction cost which is devided into design, contract and completion cost was variously analysed for increasing relevance of model and actual utilization. The result of estimation model based on a total construction cost set up completion and design cost showed that error rate is within 2%, which is a excellent result. The estimation model of the construction cost developed by this study is expected to estimate approximate construction cost which is adjacent real construction cost in early stage of the project by using some data.

A Study of Considerations and Way to promote Enterprise Risk Management in Construction Company (건설기업의 전사적 리스크 관리 체계 적용을 위한 고려 사항 및 추진 방안에 대한 연구)

  • Kim, Seung-Won;Lee, Jae-Ho;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.539-544
    • /
    • 2007
  • Owing to diversification of social desire and increase of demand as economic growth, construction industry recently is trending toward diversification, complication, gigantism. It means that is changing to difficult environment as existing construction company operation. Specially, some big construction companies are promoting get down to construction business risk management skill & development. Enterprise risk management system, recognized to risk portfolio, is suggested. instead of individually risk management. This study indicates ERM basic model, considering construction risk character, for apply to ERM to field of construction . And it is including analysis of recognition level and reality about ERM in construction company.

  • PDF

Improvement of Disaster Prevention Performance Target Rainfall Considering Climate Change (기후변화를 고려한 방재성능목표 강우량 개선 방향)

  • Lee, Jeonghoon;Kim, Kyungmin;Kim, Sangdan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.175-175
    • /
    • 2018
  • 우리나라에서 발생하는 대규모 자연재해의 상당부분은 강우에 의한 홍수피해이다. 최근 이러한 홍수피해는 기후변화와 더불어 극한강우 현상의 빈발에 의한 새로운 재해양상으로 전개되고 있으며, 이에 따라 정부에서도 재해발생시 원상복구의 개념이 아닌 항구복구의 개념으로 복구사업을 수행하고 있다. 그러나 설계에 기후변화에 대한 영향을 반영하고 있지 못하기 때문에 기후변화에 의하여 미래에 발생할 극한강우로 반복적인 피해가 예상되고 있으므로 기존의 방재성능목표 강우량의 설정 방법에 대한 개선이 필요하다. 전 세계적으로 이러한 기후변화에 의한 현상을 모의하기 위한 연구로 전지구기후모델(Global Climate Model, 이하 GCM)과 지역기후모델(Reginal Climate Model, 이하 RCM)을 사용하고 있다.우리나라 기상청에서도 CMIP5 국제사업의 표준 실험체계를 통해 전지구 기후변화 시나리오 산출을 위해서 영국 기상청 해들리센터의 GCM인 HadGEM2-AO를 도입하였다. 또한 한반도 기후변화 시나리오를 산출하기 위해 HadGEM3-RA 모형을 이용하여 전지구 기후변화 시나리오를 역학적으로 상세화하고 이를 한반도에 대해 12.5km 공간 해상도로 일 자료를 제공하고 있다. 하지만 유역규모 혹은 지점규모에서 사용하기 위해서는 이러한 일자료의 시 공간적인 상세화기법이 요구된다. 본 연구에서는 기후변화를 고려한 방재성능목표 강우량 개선 방향을 제안하기 위해 다양한 연구단에서 도출된 상세화 결과를 수집하고 비교분석을 통해 기후변화를 고려하고자 하였다. 다양한 연구기관에서 생산된 미래 확률 전망을 살펴본 결과, 동일한 GCM자료를 사용하더라도 상세화 방법론에 따라 서로 다른 결과가 도출되는 것을 확인하였다. 미래 예측의 불확실성을 고려하면 특정한 방법론이 우수하다고 평가하기는 어려움에 따라 앙상블 평균을 활용한 개선방향을 제안한다. 본 연구의 결과는 전국 지자체의 강우특성만을 고려한 것으로, 연안지역의 경우 해수면 상승을 고려하여 추가적인 대책이 필요할 것으로 판단된다.

  • PDF

A Study on the Economic Impacts and the Development Strategies of the Regional Development Plan by the City of Andong in Establishing the Foundation for Cultural Eco-tourism in 3 Cultural Areas ('안동시 3대문화권 문화·생태·관광 기반조성 사업'의 지역경제 파급효과 및 발전 방안 연구)

  • Gwon, Gi-Chang;An, Geon-Mi
    • 지역과문화
    • /
    • v.4 no.2
    • /
    • pp.1-23
    • /
    • 2017
  • The regional development plan by the city of Andong in establishing the foundation for cultural eco-tourism in the cultural area of confucianism(2010-2020) consists of 2 leading projects (the World Confucian Scholar Culture Park, the Korean Culture Theme Park) and 2 strategic projects (the Confucian Scholars' Literature Park, the Sunsunghyun Culture Complex, the Traditional Bittarae Weaving Village). By inter-regional input-output analysis, their multiplier effects of output, value-added, income and employment are estimated respectively 990.2 billion won(multiplier 2.23), 318.2 billion won(multiplier 0.72), 187.7 billion won(multiplier 0.42), and 4,791 workers(multiplier 10.6 workers/billion won). The ongoing project has been, however, delayed due to various issues and has hit a ceiling towards achieving the original objectives of the familiarization, industrialization and globalization of Confucian culture. To overcome these problems, the associated plans of constructing the Korean SMART LINK LINE, of developing contents blending traditional culture and ICT, of establishing tourist complexes and infrastructure around Lake Andong, and of constructing interactive attractions of traditional culture were proposed as new growth-leading plans.

A Study on Mixed RP/SP Models of Demand Forecasting for Rail Rapid Transit (급행철도 수요예측을 위한 RP와 SP 결합모형에 관한 연구)

  • Bae, Choon Bong;Jung, Byung Doo;Hwang, Young Ki;Kim, Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.671-677
    • /
    • 2011
  • A diversity of railway network function enhancement projects such as the double tracking, electrification, and direct operation have been actively executed to improve the railway service. When the new rapid transit is provided, how many people will use it instead of other transports? How will the railway choice behavior be changed? Accordingly, in this paper, the applicability of diverted travel demand forecast methods, by Revealed Preference(RP) and Stated Preference(SP) data was reviewed for Daegu metropolitan rail rapid transit service. As the result of combining RP and SP data, including the sequential and simultaneous approach, the total travel time and travel cost parameters are of the right sign and are highly significant. The simultaneous approach is more efficient in terms of the estimation of coefficients. In particular, methods to improve validity of the Mixed RP/SP models, when RP data is used proportionally, the diverted travel demand can be easily identified by railway fare and travel time service level. Therefore, it is considered that this will practically apply even in other regions as well as Daegu metropolitan railway.