• Title/Summary/Keyword: 사업선정절차

Search Result 118, Processing Time 0.024 seconds

Determining Relative Weights of Criteria for Evaluating National Quarantine Station by the Analytic Hierarchy Process (AHP방법을 적용한 국립검역소 평가 준거의 가중치 결정)

  • Jeong, Mun-Yong;Lee, Moo-Sik;Kim, Dae-Kyung;Yoo, In-Sook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.1
    • /
    • pp.335-340
    • /
    • 2010
  • In accordance with the increasing possibility that the new and reoccurring epidemics continuously appearing abroad flow into Korea, it is very important to evaluate the efficiency of quarantine management projects of National Quarantine Station. This study adopted the pairwise comparison approach using the analytical hierarchy process(AHP) that has been recognized with its scientific adequacy for allocating the weight, the relative importance of evaluation components. AHP technique is evaluated to be distinguished in measuring the impact by making hierarchy of, simplifying and systemizing the complicated multi-criteria decision making problems. The weights by evaluation indexes were 0.2 in the organization evaluation field and 0.8 in the service and program field. The quarantine business showed the highest value, 0.45, in the service and program field. The indexes were classified into the upper category (organization evaluation field, service and program evaluation field) and lower category (input/process/result/quarantine field, inspection field, hygiene management field, pathogenic organ investigation and monitoring field, epidemics prevention promotion/education field). The evaluation indexes that were finally selected were applied to the actual businesses in National Quarantine Station. Next, the minimum evaluation indexes were selected and so the evaluation system on the businesses in National Quarantine Station was more systemized.

A Study of the Advanced Strategy for ICT-based Public Compensation Business (ICT 기반 공익사업 보상업무 첨단화 방안 연구)

  • Seo, Myoung Bae
    • Smart Media Journal
    • /
    • v.9 no.1
    • /
    • pp.75-83
    • /
    • 2020
  • Compensation services that are indispensable during large-scale public utilities projects have been gradually increasing with the recent increase in construction, but there are no systematic compensation services due to the complicated procedures and manual work. For this reason, various problems such as construction period delays due to various complaints, corruption in compensation work, and impossible to trace the history of compensation data in the past are emerging. In this paper, in order to solve this problem, in-depth interviews and questionnaires were conducted to find out the problems of each compensation status. Based on this, 3 core technologies and 10 technical needs based on ICT were selected to improve the compensation work by deriving STEEP analysis and Issue Tree. The three core technologies are big data-based decision-making and prediction technology, advanced measurement technology, and open cloud-based compensation platform technology. In order to introduce the derived technologies to the institutions in charge of compensation, the possibility of technology diffusion by project operators was suggested based on the results of the current status of informatization by institution. Based on the core technology derived from this paper, it is necessary to make a prototype that can be advanced in compensation work and apply it to each institution and analyze the effect.

Framing an Issue of Building a Nuclear Waste Site on Television News (핵폐기장 유치에 대한 텔레비전 뉴스 프레임 분석 -KBS, MBC의 전국 및 지역(전북지역) 뉴스를 중심으로-)

  • Na, Mi-Su
    • Korean journal of communication and information
    • /
    • v.26
    • /
    • pp.157-208
    • /
    • 2004
  • This study explored how television news constructed an issue of the building of a nuclear waste facility on Wido, an issue which displayed a social conflict in the latter half of the year 2003. To do this, this study conducted frame analysis on KBS and MBC main news including national and local ones, broadcasted from 11 July, 2003 to 10 December, 2003. It was found that television news tended to stress violent protests against site designation and social disorder rather than the causes of a conflict and its solutions. Therefore, news reporting excluded fundamental reasons of conflict such as the governmental decision-making process of site designation, geological suitability, safety issue and nuclear energy policy, emphasizing the confrontation and clash between pro and con groups of site designation. This indicates that television news defines an issue of the building of a nuclear waste facility as the local conflict between groups, the police and demonstrators, or neighbors who approve and protest the site designation, not as the national issue of nuclear policy.

  • PDF

A Study on the Prediction Model of the Warship Construction Period through Statistical Analysis (통계적 분석기법을 통한 함정 건조기간 예측모델에 관한 연구)

  • Choi, Daewook;Ma, Jungmok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.497-502
    • /
    • 2020
  • For the Navy to acquire the desired vessels in time, it is necessary to plan the schedule accurately for warships. On the other hand, until now, there has been only a subjective prediction of the period of warship construction through a survey by a group of experts. No academic studies have been conducted based on actual data. Therefore, this study presents a model for predicting the construction period of a warship through linear regression based on actual data. Experts first identified the factors that can affect the warship construction period. Actual data of the factors were collected, and regression analysis was performed to estimate the ship construction period. As a result, the key factors selected that influence the construction period of a ship were the number of operational test items, number and type of equipment, and the number and type of R&D equipment. The resulting regression model revealed 96.5% accuracy in terms of internal validity.

A Study on a development plan for multi-transportation in Incheon: Focused on Incheon and main cities in Northern China (인천지역의 복합운송체계별 발전방안 연구 - 인천과 상해이북지역 중심으로 -)

  • Chung, Tae-Won
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.1
    • /
    • pp.259-276
    • /
    • 2010
  • This study shows how Incheon will advance into roadmap as multi-transport hub in Northeast Asia hereafter and be proposed an urgent tasks and roles to construct a multi-transportation system for Incheon, which has both an international airport and port. The multi-transportation point of view of inter-major cities competitiveness of total scores was proposed 1. Shanghai(64.8 points), 2 in Hongkong(64.5), 3 in Incheon(62.9), and 4 in Busan(60.4) and Incheon was estimated to have enough competitiveness to be the international multi-transport hub in Northeast Asia. Sea & Air transportation revealed the most important multi-transportation in the Incheon region. In conclusion, this research suggests a development plan for multi-transportation in Incheon. Firstly, it proposes construction of sea & air transportation distribution center and agreement that simplifies logistic process between Incheon and Tianjin, secondly, suggests to activate project for the purpose of creating a better sea-land transportation system between Incheon and Shanghai.

Alternative to Maximize Efficiency for Loan System of Sport Promotion Fund (국민체육진흥기금 융자제도 지원효과 극대화 방안)

  • Kang, Ho-Jung;Kim, Kyong-Sik
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.7
    • /
    • pp.208-215
    • /
    • 2008
  • Sport industry creates value-added by production and distribution of product or service related with sports or sports. Because this industry shows promise in becoming a major industry area, the government is making an effort to bring up or develop it. The financing to firms of sport industry area(sporting goods industry, sport facility industry, sport service industry) with low interest rate and long-term repayment period on the basis of sports promotion fund is excellent scheme to promote sport industry. Nevertheless, Because many people indicate operational inefficiency of it, it is necessary to check operational efficiency through investigation for loan system of sports promotion fund. The purposes of this paper are to present some directions for the improvement of efficiency by the analysis to public loan system using funds of other government organization and to the current status of loan system of sports promotion fund. The result of this study are as follows. First, we propose enlargement of loan size and range. Second, it is necessary to use mortgages loan to technology in case of sporting goods industry and sport service industry. Third, we suggest the mitigation of loan disproportion and flexible application among loam amount of sport industry areas. Fourth, we suggest the construction of loan practical committee. Finally we propose the establishment of selection criteria to firms and ex-post evaluation system related with loan system of sports promotion fund.

Investigation of Korean Forest Carbon Offset Program : Current Status and Cognition of Program Participants (산림탄소상쇄제도의 사업참여자 인식 및 현황 분석)

  • Sa, Yejin;Woo, Heesung;Kim, Joonsoon
    • Journal of Korean Society of Forest Science
    • /
    • v.111 no.1
    • /
    • pp.165-176
    • /
    • 2022
  • To raise awareness of carbon reduction in climate change, the Korea Forest Service has developed and adopted a forest carbon offset program, which aims to reduce carbon levels based on forest management. However, to maintain the forest carbon offset program, challenges such as the lack of a forest monitoring system to manage and maintain the program, must be faced. In this context, we investigated the limitations of conducting forest carbon offset programs using a number of interview techniques, including in-depth interview and questionnaire survey methods. The questionnaire surveys were developed based on the results of a literature review along with a preinterview and in-depth survey of the people in charge of the forest carbon offset program. The Irving Seidman technique was adopted for the in-depth interviews. Additionally, descriptive and frequency analyses were conducted to identify the characteristics of perception. Lastly, logistic regression was used to identify the limiting factors that affect the willingness to perform forest carbon offset monitoring activity. Results showed that the project managers or people in charge of the forest carbon offset program lacked expertise in forest carbon offset programs, which negatively affected their willingness to perform monitoring activity. Additionally, the study revealed a number of limiting factors that hindered the monitoring of forest carbon offset projects. Improving understanding using the approaches presented in this study may contribute to increasing the benefits associated with the forest carbon offset program in South Korea.

An Institutional Approach for Application of the Contracting-out in City Parks - Focused on the Case Study of City Park Management of Seongnam City - (도시공원의 민간위탁 적용을 위한 제도적 방안 - 성남시 도시공원 운영사례를 중심으로 -)

  • Byeon, Jae-Sang;Kim, In-Ho;Shin, Sang-Hyun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.33-47
    • /
    • 2011
  • One of the most fundamental jobs of contemporary government is to look into various ways of providing its citizens with the best service work. This study aims to establish a procedure through which to consign the management of city parks to private companies, thus inviting participation and satisfaction on the part of citizens. In particular, this procedure includes creating a system of selecting private managing companies, for instance, specifying standards of selection and assembling selection committees. The results of this study can be summarized as follows. First, city parks can be managed better by private companies than by local governments in terms of cost cuts, personnel training, business efficiency, and know-how accumulation. The legal background for this is found in central and local legal articles. Second, it is recommended that the selection committee be composed of 6 to 9 members, both insiders and outsiders. In addition to selecting private managing companies for contracting-out, the committee should under take the role of consulting on how to perform and revise selecting standards, so that they can continue to improve these procedures. Third, the decision on private management should be noticed in advance and be made based on standards considering each local government's condition. These standards should consider the aspects of the public good, cost saving, quality of service, managing supervision, and citizen participation. The committee's assessment takes into account both the quality and the quantity of the standards. Fourth, the contracting-out for city park management should follow the order of: announcing consignment and receiving applicants, organizing selection committees and assessing applications, selecting and contracting, midterm evaluation, and re-announcement and re-consignment. To run city parks through the contracting-out is expected to increase the number of park visitors. Additionally, private consignment will involve a participation of diverse citizenship, thus playing an important role in city parks' building of a green-culture community.

A Study on the Establishment of Economic Activity Participation for the Elderly through Work for the Elderly (노인 일자리사업을 통한 노인경제 활동 참여의 구축 방안 연구)

  • Jeong, Kyoung-Ja
    • Industry Promotion Research
    • /
    • v.5 no.1
    • /
    • pp.89-98
    • /
    • 2020
  • This study is to find ways to build economic participation for the elderly through job projects to help the elderly live a pleasant life. The results of this study are as follows. First, the relevant laws must be overhauled. To this end, jobs targeting the elderly should be selected first, and legal procedures should be prepared in the government. Second, they should extend the retirement age and support senior employment businesses. The extension of the retirement age believes that a resumption of the wage structure is inevitable in order to increase employment for senior citizens. It is also desirable to implement policies such as giving tax benefits to companies that employ older people more than a certain percentage of them. Third, there should be self-help efforts by the elderly. Three factors are essential to keep the work of old age pleasant and faithful. In other words, it is important to always learn new knowledge and hone one's ability in order to do a rewarding job of living without health and some economic stability. In conclusion, measures to establish economic participation for the elderly through the work-seeker project will require, among other things, a sufficient extension of the retirement age to allow the elderly to engage in their jobs, while overhauling the system, including legal maintenance.

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.