• Title/Summary/Keyword: 사업비

Search Result 3,105, Processing Time 0.028 seconds

레미콘에 의한 사방댐 시공방안

  • 한국레미콘공업협회
    • 레미콘
    • /
    • no.12 s.10
    • /
    • pp.85-87
    • /
    • 1986
  • 다음 자료는 산림청이 11월 12일 개최한 제17회 전국 사방실무세미나에서 경기도치산사업소 여재만씨가 개발, 발표한 내용이다. 「레미콘을 이용한 사방댐시공법」은 깬돌, 자갈, 잡석 등을 이용한 종래의 사방사업 시행때에 인력, 자재 확보난 등의 어려움을 해소하고 공기단축과 사업비를 절감할 수 있는 효과적인 방안으로 평가받고 있다. 새로 개발된 「레미콘을 이용한 사방댐시공법 」은 산림청에서 87년도 최우수 과제로 선정되어 전국적으로 확대 실시할 계획이다.

  • PDF

Estimation of Support Working Expenses for Dam Area using GIS Spatial Analysis (GIS 공간분석을 이용한 댐 주변지역 지원사업비 산정)

  • Hwang, Eui-Ho;Lee, Geun-Sang;Chae, Hyuo-Suck;Koh, Deuk-Koo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.4
    • /
    • pp.24-32
    • /
    • 2005
  • Budget distribution system suporting dam area was changed largely in 2005, and thus, population survey and area calculation for dam and needed to be performed based upon the new criteria. According to the former regulations, dam area was confined to inside of 5km from the H.W.L-line. However, new regulations divide it into two categories : inside and outside of catchment area within 2km from the H. W. L-line and those belong to 2~5km from the same line. In this study, topography, DEM, TIN and Hydrological Unit Map were build for the analysis of the Namgang Dam area. It shows that analysis of dam area using GIS methods produces a good results to be used for rational distribution of budget.

  • PDF

A Study on Improvement of Rationality and Stability of Allocation and Procurement of Defense Capability Improvement Cost -Focused on the Yearly Allocation and Procurement of Mid-Term Defense Plan- (방위력개선사업비 편성.확보의 합리성과 안정성 제고방안 -국방중기계획 연부액의 편성 및 확보방안을 중심으로-)

  • Choi, Joon-Hyouck;Lee, Pil-Jung
    • Journal of the military operations research society of Korea
    • /
    • v.34 no.1
    • /
    • pp.117-135
    • /
    • 2008
  • The ROK's military is attempting to change to advanced information science force through 'the Defense Reform 2020', which essentially creates the requirements of new military force. Therefore, the importance of defense industry and defense budget have been emphasized in order to successfully promote military build-up. However, the ROK defence industry has been going serious difficulties in the present day, and what is worse, unreliable rationality stability of Defense Capability Improvement Cost put the industry in the harder situation. In this circumstances, the improvement measures of the rationality stability of Defense Capability Improvement Cost should be immediately studied to satisfy the requirements of ROK military force in a suitable time and the development of ROK defense industry. The purpose of this study was to propose reinforcement measures to improve the arrangement system of yearly allocation for Mid-term Defense Plan of defense capability improvement programs and connect Mid-term Defense Plan to National Fiscal Management Plan to raise the rationality stability of ROK Defense Capability Improvement Cost.

Performance Analysis of the National IT R&D Program (정보통신연구개발사업의 성과 제고방안)

  • Song, Hag-Hyun;Choi, Se-Ha;Kim, Yoon-Ho
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.2 no.2
    • /
    • pp.85-94
    • /
    • 2003
  • 정부에서는 정보통신기술개발을 위해 1993년부터 정보화 촉진기금을 설치하고 "정보통신연구개발사업"을 통해 이를 집중 지원하여 왔는데 정보통신 산업발전 및 정보화촉진을 위해 $1993{\sim}2001$년간 총 5조 8,252억원을 투입하였고 출연사업으로는 3조 1,012억원을 투입하였다. 정보통신연구개발사업 중 출연사업은 정보통신분야의 기술진흥과 정보통신산업 발전을 선도하기 위한 선도기술개발사업과 IT 신시장 창출 및 IT 산업경쟁력 제고를 위하여 산업체를 대상으로 지원하는 산업기술개발사업, 정보통신분야기 우수한 신기술을 보유하고도 자금부족 등으로 사업화를 못하는 개인 또는 중소기업에게 시제품개발 또는 산업화에 소요되는 사업비를 지원하는 우수신기술지정지원사업, 그리고 표준화사업과 연구기반조성사업 등이 대표적인 정보통신연구개발사업으로 사업별 지원 내용을 살펴보았다. 또한 인력양성을 제외한 정보통신연구개발 출연사업에 $1993{\sim}2001$년간 총 2조 1,755억원을 투자하여 매출이 28조원 이상 발생하는 등의 각종 성과가 있었는데 사업별 성과를 살펴보고 개선방안을 제시하였다.

  • PDF

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.

A Study on Developing the Calculation System of Disbursement for Government on the BTL Projects (BTL사업을 위한 정부지급금 산출 시스템 개발 연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Jung, Young-Han;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.93-101
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

VE.LCC Case Analysis on the Build-Transfer-Lease(BTL) Projects of School facility (학교시설 임대형민간투자사업(BTL)의 VE.LCC 사례 분석)

  • Lee, Do-Hyung;Park, Woo-Jin;Chu, Gook-Sik;Cho, Ki-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.143-148
    • /
    • 2008
  • This study is VE LCC case analysis on two school BTL projects which is constructed by Private sector and rented to government. Then private sector payback their initial cost and profit by rental fee from government. The VE in Korea, revised by the method of the Construction Technique - Enforcement Ordinance in 2005 is applicable to construction business which size is over 10 billion won. The VE well known as a way of productivity elevation is already proven and outstanding management method In construction industry inside and outside of the courtly. As its unique personality of BTL business, VE workshop period is too short. There is a few accomplished BTL project and data base, because BTL business begun from year of 2006. So we are trying to proof effect of VE LCC through case study of school BTL projects.

  • PDF

A Study on the Effects of Industry Types and Business Characteristics on Management Performance: For Japanese Logistics Companies (물류기업의 업종과 사업특성이 경영성과에 미치는 영향에 관한 연구 -일본 물류기업을 대상으로-)

  • Koo, Kyoung-Mo
    • Journal of Korea Port Economic Association
    • /
    • v.34 no.2
    • /
    • pp.51-68
    • /
    • 2018
  • This paper compares the differences in management performance in the logistics market and analyzes the differences in business characteristics depending on the industry types. In addition, the effects of industry types and business characteristics on management performance are examined. The analysis method used is ANOVA and K-means clustering. The implication of the study are as follows. First, in the logistics market in Japan, there was a difference in management performance among the types of industry. The warehousing service type had the highest profitability and stability among all the industry types. Second, differences in business characteristics by industry types were tested. It was found that offshore cargo transportation type was more capital intensive than the other types. In addition, warehousing service type had higher business leadership and credit transaction than others. Third, industry types and clusters based on business characteristics had a significant impact on management performance through interaction effects. For the profitability variables in detail, other clusters had a significant effect between transportation types(onshore and offshore cargo) and warehousing service type. On the other hand, in stability variables, one cluster was effective in all types, which is a characteristic that lowers both capital intensity and business leadership.

Hyper-resolution 1D-2D coupled urban inundation modelling using LiDAR and hybrid parallelization (하이브리드 병렬화 기반 초고해상도 1D-2D 도시침수 모의)

  • Lee, Seung-soo;Noh, Seong Jin;Lee, Junhak;Kawike, Kenji;Seo, Dong-Jun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.7-7
    • /
    • 2018
  • 1차원 하수관로 해석 모형과 2차원 지표면 유출 해석 모형을 연계한 1D-2D 결합 도시침수 모델은 도시지역의 유출 현상과 침수 모의에 널리 이용되고 있다. 그러나 도시 지역의 복잡한 지형이 지표면 유출 흐름에 미치는 영향을 보다 자세히 파악하기 위해서는 보다 높은 해상도의 지형자료를 활용한 모의가 필요하다. 본 연구에서는 도시침수 해석을 위한 1D-2D 결합 하이브리드(Hybrid) 병렬화 코드(H12)를 개발하여 넓은 도시 유역에 대해서 고해상도 지형자료를 활용한 모의가 유역단위로 가능하도록 하였다. H12는 Open Multi-Processing(OpenMP)와 Message Passing Interface(MPI) 병렬 계산을 동시에 수행하여 매우 넓은 지역에 대해서도 도로의 형태를 확인 할 수 있는 수준의 고해상도 침수 해석 모의가 가능하다. 또한 도시지역의 복잡한 지형을 자세히 재현하고 계산의 효율을 높이기 위하여 격자세분화 기법이 적용되었다. H12의 적용성을 평가하기 위하여 미국 텍사스 알링턴 지역의 Johnson Creek 유역(${\sim}40km^2$)유역에 대한 시범 모의를 수행하였으며 도시유역의 지형을 표현하기 위하여 1m 해상도의 LiDAR자료를 사용하여 침수발생시 보다 자세한 유출수의 흐름을 해석할 수 있도록 하였다. 모의 결과 하이브리드 병렬 계산은 순차적 계산에 비하여 최고 79배 이상 빠른 계산속도 효율 향상을 보여주었으며, OpenMP나 MPI를 단독으로 사용하는 것에 비하여 더욱 효율적인 계산속도 효율 향상을 보여주었다.

  • PDF

The Satisfaction of Employment Promotion and the Intension of Participation Continuity of the Elderly: Focusing on the Intension of the Participants of the Public Sector Employment Promotion Program (노인일자리사업 참여만족도와 참여지속의사에 관한 연구: 공공분야 노인일자리 사업 참여자를 중심으로)

  • Kim, Jin Wook;Son, Ji-yun
    • 한국노년학
    • /
    • v.29 no.4
    • /
    • pp.1295-1311
    • /
    • 2009
  • The aims of the study is to analyse the participation satisfaction and the intension continuing participation through volunteering of the elderly who take part in the employment promotion programme for the elderly. The major findings can be summarised as follows; first, although the level of satisfaction of the public sector programme participants seems relatively high, the satisfaction level on the payments is not. Secondly, there was differences in the level of volunteering intension according to different kinds of the programmes. Thirdly, higher socio-economic status, the sorts of the programme, and the level of satisfaction affects the odds of the participation intention of the elderly. Based on these findings, the study suggests various directions of the employment promotion programme for the elderly such as need assessment for the elderly, the increase of the payment, promoting the quality of employment, and the administrative system for supporting elderly volunteering.