BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Capacitated Satellite Facility Modeling for Inventory Routing Problems (위성창고를 가진 시스템에서의 재고보충일정 및 경로결정 문제에 관한 연구)

  • 이현지;최경현
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.522-525
    • /
    • 2000
  • 본 연구에서는 고객의 재고 수준을 고려하면서 동시에 연간 수송비용을 최소로 하는 차량 경로결정문제 IRP(Inventory Routing Problem)에 새로운 위성창고 (Satellite facility)개념을 도입한 수리모델과 알고리즘을 개발하였다. 위성창고는 수송 가능 용량을 초과하는 수요가 발생했을 때 수송 도중에 물량을 보충하여 재고 보충 일정 시간 내에 운반을 할 수 있도록 하는 장치이며 여기서는 용량의 한계를 고려한 위성창고 개념을 도입하였다. 또한 재고 보충 일정 관리 문제와 차량 경로 결정 문제를 분리하여 순차적으로 발견적 기법을 이용하는 기존의 방법을 통합 최적화 알고리즘으로 구현하였다.

  • PDF

Development of Progress Management System based on Quality Inspection Information - Case Study on Nuclear Power Plant Construction - (품질관리 정보를 기반으로 한 진척도 관리 시스템 개발 - 원자력발전소 건설공사 사례를 중심으로 -)

  • Kwahk, Kil-Jong;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.73-84
    • /
    • 2011
  • This study represents construction progress management model based on quality inspection process in addition to cost-schedule integration. Quality inspection process cycle, resource estimate as progress measurement parameter, hierarchical structure of schedule, and inspection lots linking quality inspection to resource estimate are addressed as four main information areas. The authors established several process models to give a structure and correlations among information elements on each of these areas. Applying the process models proposed, an information system was implemented and utilized for nuclear power plant construction. It reveals that the system achieves accurate and objective progress information in near real time with significantly reduced time and effort as well as administrative efficiencies from making quality inspection process online.

Function Organization of nD CAD System for Plant Project by Linking Cost and Resource Information (비용과 자원을 연계한 플랜트공사 nD CAD 시스템 기능 구성 방안)

  • Kang, Leen-Seok;Ji, Sang-Bok;Moon, Hyoun-Seok;An, Jae-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.809-812
    • /
    • 2007
  • This study suggests a methodology for organizing functions of nD CAD model which 4D object is linked with cost and resource information. And the suggested model is composed of process analysis function of plant project based on visualized scenario analysis. That is, it is possible to manage effectively not only construction schedule plan, but also resource and cost information by integrating construction management information into nD CAD object. And the suggested model can be utilized as information of a effective decision-making tool through analyzing of optimal process scenario and sharing of an analyzed information.

  • PDF

A Study on Modularization of a Decommissioning Information Evaluation System (해체 정보 평가 시스템의 모듈 연구)

  • Park, Hee-Seoung;Kim, Sung-Kyun;Lee, Kyne-Woo;Oh, Won-Jin
    • Annual Conference of KIPS
    • /
    • 2005.05a
    • /
    • pp.305-308
    • /
    • 2005
  • 해체 준비 작업부터 해체 후 처리까지 가상의 디지털 해체 환경에서 해체 활동의 예측에 필요한 모듈별 기능들을 요소별로 검토 분석하였다. 해체 정보 통합 관리 시스템의 기본 정보를 제공할 수 있는 모듈을 확립하기위해 해체 데이터베이스와 3D CAD 를 연동시키는 방안에 대하여 연구하였다. 3 차원 dosimetric mapping 기술로 방사능 오염 분포를 입체적으로 묘사할 수 있는 모듈과 제염 해체 단위 작업별 평가식과 가중치 값을 이용하여 해체 작업자수와 해체 시간을 평가할 수 있는 모듈을 연구하였다. 연구 결과 가상의 해체 환경에서 연구로 및 원자력 시설 해체시 경제성과 안전성에 영향을 미치는 해체 일정과 해체 비용을 평가할 수 있는 단위 모듈들의 기능을 활용하여 해체 통합 관리 시스템의 설계 기준과 요구 조건 및 기능을 도출하였다.

  • PDF