Korean Journal of Construction Engineering and Management
/
v.4
no.1
s.13
/
pp.106-113
/
2003
In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.
접든성통제는 고속도로에 있어서 교통사고 감소의 가장 효과적인 수단들 중의 하나로 인식되어져왔다. 이러한 접근통제의 새로운 적용으로서 접근성관리는 과도한 투자 없이 일반도로상에서 교통사고를 감소시키는데 활용되고 있다. 이 연구의 목적은 도시간선도로상에 있어서 접근성관리와 교통사고와의 관계를 교통사고비용의 측면에서 분석하는 것이다. 이를 위해, 이 연구는 미국 텍사스주 대도시 지역내 중앙분리간선도로의 교통사고자료를 다중회귀모형을 이용하여 분석하였다. 이 연구는 자료분석의 결과 다음과 같은 사실을 발견할 수 있었다. 첫째, 접근성관리는 도시간선도로의 교통사고비용과 밀접한 관계를 가지고 있었다. 둘째, 이러한 접근성관리와 교통사고비용과의 관계는 도로의 교통상황과 도로변 토지이용상태에 따라 다양하게 나타났다. 셋째, 대체로 접근성관리와 관련된 요인이 교통상황 및 토지이용상태에 관련된 요인보다 더 교통사고비용과 밀접한 관계를 보였다. 마지막으로, 교통사고비용을 설명하는데 있어 가장 중용한 접근성 관리 요인은 외부접근로의 간격으로 나타났다.
Cost-effective mobility management for the roaming mobile users is very important in the seamless services on next-generation wireless network (NGWN). MIPv6 (Mobile IPv6) is one of the mobility management schemes proposed by the IETF (The Internet Engineering Task Force) and various IPv6-based mobility management schemes have been developed. They are directly involved with data transfer from MN (Mobile Node). In this paper, two kinds of schemes in analyzing of mobility management schemes are proposed. The signaling transfer and packet delivery procedures for each mobility management schemes are analyzed, respectively. The signaling cost for mobility management schemes are calculated, and the cost of each protocol are analyzed numerically. In other word, applying the sum of signaling cost and packet delivery cost to each mobility management scheme, their costs are analyzed. Finally, our performance evaluation results that the network-based mobility management scheme shows better performance in terms of overall cost.
Proceedings of the Turfgrass Society of Korea Conference
/
2011.02a
/
pp.45-45
/
2011
해마다 여름철이면 장마기간 이후 코스에 발생하는 병으로 인해 우리나라의 골프장들은 많은 어려움 처하곤 한다. 그러나 잔디병에 관한 잘못된 상식과 편견으로 인해 병방제에 필요없는 비용이 소요되는 일이 흔히 발생한다. 향후 우리나라의 골프장이 500개가 넘어 설 예정이며 이러한 시점에서 관리비용을 줄이기 위한 대책 마련이 시급한 상황임을 고려할 때 코스를 최적으로 유지관리 하고 동시에 필요없는 관리비용을 줄이기 위한 노력이 요구되는 시점이다. 이러한 맥락에서 우리가 흔히 생각하고 있는 병에 대한 편견과 또 관리비용을 줄이기 위한 병 방제 시스템에 관해 알아보고자 한다.
Proceedings of the Safety Management and Science Conference
/
2003.11a
/
pp.15-20
/
2003
본 연구에서는 계절별 기후인자를 고려하여 정성적 및 정량적 위험성 평가를 실시하여 사고 시나리오를 설정하였고, 비용-편익분석을 실시하여 사고 시나리오별 안전관리 비의 효율을 분석하였다. 그 결과, 최악의 시나리오는 비정상조업에서 유지보수 오류이었고, 가능성 있는 시나리오는 HAZOP 구간#4에서 발생되는 가스 누출사고이었으며, 각 사고 시나리오에서 전체 안전관리 투자비에 대한 편익/비용은 0.043과 0.13이었다. 이때 각 사고 시나리오에서 비용 효과적인 안전관리 항목을 평가할 수 있었다.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.153-161
/
2004
The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.477-480
/
2003
The objective procedure and criterion needs to efficiently perform the safety assessment and improve reliability for results of the cost analysis. There are many studies about cost analysis of safety assessment, but the these studies have problems such as non-quantification of criterions and methods. The purpose of this study to suggest the procedure and criterion for successful cost analysis and quantify cost factors. First, in the cost analysis of the housing reconstruction that is presented this study, determinate the life-cycle and the discount rate, then estimate reconstruction cost and remodeling cost. Finally, compare the annual equivalent LCC of two costs for decision malting to reconstruction or remodeling.
Journal of the Korea Institute of Building Construction
/
v.22
no.4
/
pp.403-414
/
2022
Many studies have been conducted on asset management of public facilities, as the importance of such management has been increasing. This basic study aims to present strategies for the practical use of public asset management, and seeks to propose efficient management and utilization measures from a cost perspective by comparing and analyzing the importance and impact relationship between cost items for public asset management. In this study, 19 sub-items and the top 4 items were chosen by deriving cost factors based on the previous literature. A survey was conducted, and the results of the survey were analyzed by using the Analytic Hierarchy Process(AHP) and Interpretive Structural Modeling (ISM) methods. The AHP was used to derive the priority between items, and ISM was used to identify major groups and mutual influences. As a result, those items showing both high priority and high importance, such as user cost, dismantling/disposal cost, replacement cost, maintenance/repair cost, etc. are determined as priority items to be considered for public asset management of public facilities. Also, it is necessary to minimize the impact on other items in public asset management by those items which are impacted less by other items but have significant impact on the items such as initial construction costs, conceptual design costs, construction costs, and supervision costs. It is expected that the results and analysis methods presented in this study can be used to provide strategies for asset management of public facilities.
Korean Journal of Construction Engineering and Management
/
v.14
no.5
/
pp.144-152
/
2013
Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.
Journal of the Korea institute for structural maintenance and inspection
/
v.20
no.6
/
pp.1-9
/
2016
The paper aims at evaluating effects of preventive maintenance on life cycle cost(LCC) reduction of bridges. The preventive maintenance activities capable to delay bridge deteriorations can reduce overall maintenance costs and extend service life of a bridge by regularly providing maintenance activities and avoiding larger maintenance(repairs or rehabilitations) costs. Couple of prediction models were proposed in order to calculate LCC of a typical bridge: a health score model and repair rehabilitation cost model. In addition, the maintenance activities such as wash and painting were also suggested in order to consider effects of preventive maintenance in the analysis based on literature reviews. According to analysis results, new maintenance strategy(reactive maintenance + preventive maintenance) can save \0.5 billion per bridge for future life-cycle costs over 100 year analysis or \184 billion for entire HBMS(Highway Bridge Management System) inventory over 20 years. Small investments for preventive maintenance in improved bridge management can have a very significant return when considering the large bridge inventory.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.