• Title/Summary/Keyword: 분양공동주택

Search Result 58, Processing Time 0.015 seconds

A Study on the Profitability According to the Different Sales Timing in Apartment Housing Development Projects (공동주택 개발 사업의 분양시기 변동에 따른 수익성 비교.분석에 관한 연구)

  • Yoon, Seung-Hyeon;Kang, Hyun-Wook;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.62-71
    • /
    • 2009
  • The purpose of this study is to analyze of profitability accordance to the different sales timing in apartment housing development projects. The adapted research method about public apartment hosing development projects by a private construction company is concentrated on the middle and large scale housing. The methodology for analysis of profitability through the change of timing for sales is analysed. According to this methodology, the difference of profitability by different timing of first sales is compared and analyzed. The results of this study are as followed 1)The major factors to affect the profitability for apartment housing development project consist of the timing of sales, the method of payment and the rate of sales. 2) The case study was carried out and then the profitability is analyzed the profitability for the three of cases is got worse when the sale after construction especially on the time of construction progress rate 80% is carried out.

The Prediction of the Apartment Construction Project Cashflow with Changing Sales Point (분양시기 변동에 따른 공동주택 건설공사 현금흐름 예측)

  • Bae Jun-Ho;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.234-237
    • /
    • 2003
  • The Korean housing supply have been provided by the Pre-construction sales system. The Pre-construction sales system contributed to large housing supply. But it followed by the market anomaly. Along the housing market is changing to tile market for consumers, it requires new policy and regulations. This market changes and needs to modify the policy make a discussion about introducing the Post-construction sales system. it concerns to change the time to sale. This paper analyzes the present feasibility study and makes a tool to predict construction cashflow considering changed sales point. The sales timing leads to decide the amount of financial costs in the construction project and that cost affects to the feasibility. The accurate cashflow prediction is required for a successful apartment construction delivery.

  • PDF

A Study on Improvements Direction for Applying BIM-based Virtual Reality of Apartment Sales Phase (공동주택 분양 관리 단계의 BIM 기반 가상현실 적용성 확보를 위한 개선방향 도출에 관한 연구)

  • Lee, Juyeon;Kim, Taekjoong;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.86-94
    • /
    • 2019
  • The purpose of this study was to analyzes the problems in terms of transmission the information of architecture in the current apartment housing sales phase, to suggest the way of application the technology of BIM-based virtual reality. For this purpose, each element technology is analyzed through analyzing the exiting studies and international technical trend of BIM-based virtual reality and motion recognition devices. And then this study analyze the present condition of apartment housing sales phase and it conduct the expert interviews for derive the problem and analyzing the importance and priority by AHP method. And finally, this study suggest the solution in terms of information delivery in apartment housing sales phase through plan for support and deriving the function about problems. The system of BIM-based virtual reality viewer that utilize a leap motion that was presented in this study, it is believed to be able to efficiently transfer the information of architecture as building information transmission system user-centric in the future of apartment housing sales phase.

A Study on the Evaluation Criteria for Feasibility Analysis of Apartment House Development Project (공동주택 개발사업 타당성 평가항목에 관한 연구)

  • Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.102-113
    • /
    • 2009
  • When planning and promoting apartment house development project, it is very important to carry on profitability in planning stage through realistic evaluation and analysis about distributability. Especially, the analysis about project feasibility through forecasting the early distribute rate is crucial stage because it could evaluate overall expecting benefit and feasibility of the project. However, researches and studies related with forecasting profitability and distributabilty of construction development project are insufficient. Also there is a big gap of the standard for evaluating early distribute rate between government and individual corporations. So it is necessary to study about the evaluating early distribute rate. In this point, this study aims to present effective evaluating standard(criteria) which is for forecasting profitability and distribute rate through analyzing various factors and weight of apartment house development projects. This study compared and analyzed examples of the real initial rate of private apartment sale based on the government estimated standard. Among estimated index, omitted items and factors to be additionally considered are combined as 33 detail appraisal contents of 4 parts 9 items by allotting them based on the data about priority of all considered factors.

A Study on the Influence of the Characteristics of Planning on the Cost of Apartment (공동주택의 계획특성이 분양원가에 미치는 영향에 대한 분석)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.89-99
    • /
    • 2006
  • Usually feasibility analysis in a narrow sense is a economic analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. Many studies have been executed in qualitative element which include decision-making process or prediction of housing market. But it is difficult to find economic analysis related to characteristics of planning. In this study, floor area ratio, selling area ratio and term of works are adopted as the Characteristics of Planning. So, the purpose of this study is to analyze the Influence of the characteristics of planning on the cost of apartment by means of multiple regression analysis and what-if method.

A Study on the Decreasing the Claim Incidence by Offering Appropriate Information at Subscription Phase (청약단계에서의 적정분양정보 제공을 통한 공동주택 민원성 하자발생 감소방안에 대한 연구)

  • Yoo, Seung-Yeun;Yi, June-Seong;Go, Jong-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.718-721
    • /
    • 2006
  • The purpose of this study is to propose the way of decreasing frequently-occurred complaint by offering proper sale information at subscription phase based-on post-occupancy satisfaction survey. For this purpose, questionnaire surveys of residents were conducted to analyze their cognition of apartment sale information at subscription phase. and deduce appropriate sale information. The results can be summarized as followings: 1) It provides well-managed apartment sale information as utilizing checklists which is based on important items that effects on apartment inhabitants' satisfaction in apartment sale marketing. 2) It establishes a specific management standard of proper items of apartment sale information. 3) It manages and provides apartment sale information by making checklists of apartment sale information which consumers needs in their actual necessities.

  • PDF

The Current State and Application of project Financing followed by Sale after Building System of the Apartment (공동주택 후분양 전환에 따른 프로젝트 금융의 현황 및 활용방안)

  • Lee Sung-Rock;Moon Hwi-Young;Lee Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.218-225
    • /
    • 2004
  • The supply for the apartment complex in Korea has been accomplished by the sale before building system as a way of institutional means to support massive housing supply in the past. Although this sale before building system has helped the provision of the housing, the necessity of that has been weakened in the current housing market. As this market is changed to emphasize on consumer, the necessity of conversion to sale after building system was raised and finally enforced partially. However, the sale after building system has difficulty in ensuring construction fund and the safety of housing business. So, the diversification in the style of business structure we and the strategy for the activation of construction fund will solve these problems. Consequently, this essay examine the change and influence in the construction fund after adopting sale after building system and suggest the appropriate strategy in project financing for providing fund and reducing the risk in construction business.

A Comparative Analysis of Supplier's Profitability According to the Different Sales Timing in Apartment Housing (공동주택의 분양시기 변화에 따른 공급자의 수익성 비교 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.25-34
    • /
    • 2012
  • It has been five years since the Post-Construction Sale System of Housing was introduced. The purpose of this study is to identify objectives and effects of the Post-Construction Sale System of Housing and analyze change of profitability at different sales time from a supplier's point of view. Apartment buildings construction projects performed in Seoul are used for the case study. The present value of sales revenues, sensitivity and the present value of expected sales prices are analyzed. According to the findings, first, profits made from a Pre-construction sales system was 5.1%~6.2% higher than those from a Post-construction sales system. Among four plans of a Pre-construction sales system (A, B, C and D plan), sales revenue from the A plan, which takes a deposit at the time of starting construction, was the greatest. Second, increase of the rate of discount and decrease of sales revenues are in direct proportion. The bigger rate of discount leads actual reduction of sales revenues. Third, for the present value of sales revenues reflecting change in basic model construction cost, a Pre-construction sales system showed a little higher than that of a Post-construction sales system by approximately 2%. It should be known that this study suggests profitability of Pre-and Post-construction sales system by clearly measuring them in the supplier's point of view and calculates sales revenues, considering change of a sale price following change of sales time.