• Title/Summary/Keyword: 배관 노후도

Search Result 27, Processing Time 0.02 seconds

Experimental Study for the Reinforcement of District Heating Pipe (지역난방 열배관 강화를 위한 실증시험 연구)

  • Kim, Jaemin;Kim, Jooyong;Cho, Chongdu
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.40 no.3
    • /
    • pp.245-252
    • /
    • 2016
  • In this study, an alternative bend design is proposed to overcome the aging problem in piping bends. In this design, the foam pad is not included. Finite element analysis was performed based on the total pipe diameter. From this analysis, the shape of the Shear Control Ring (SCR) was determined. Temperature, stress, and other data of the proposed reinforced pipe were acquired and analyzed after the test was performed. The value of the thermal stress for the reinforced steel pipe satisfied the required standard without the foam pad based on the manufacturing of the reinforced fitting and construction site of the test. The reinforcement provided a shear strength level for the foam pad that resulted in maximum shear stress less than stress based on the original foam pad applied at the pipe bend. Additionally, an increasing factor of safety effect for the reinforced fitting application was discovered.

Development of Risk Based Inspection (RBI) Procedures for Optimized Preventive Maintenance (PM) Planning of Energy Plants (에너지플랜트의 최적 예방점검을 위한 위험도기반 설비 관리(RBI) 절차 개발)

  • Choi, Jeong-Woo;Yoon, Kee-Bong
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.1
    • /
    • pp.74-80
    • /
    • 2011
  • Recently, needs for extending remaining life and integrity of the aged energy plants are increased since the most domestic plants have been operated over 10 years. This need makes RAM (reliability, availability and maintainability) of the plant become more significant. RBI (risk based inspection) is main technology to increase RAM in energy plants. So far RBI has been developed mainly in the field of process plants (chemical/refinery), underground buried pipelines or nuclear power plants. However, the existing RBI procedure is limited mainly to process plants, it need to be extended to the other energy plants such as fossil power plants. In this study, a general RBI procedure for optimized PM (preventive maintenance) is proposed for various energy plants.

Old Service Pipe Cleaning of Polly-pigs Cleaning technique (Polly-pigs를 이용한 노후급수관의 세관에 관한 연구)

  • Lee, Hyun-Dong;Bae, Chul-Ho;Park, Jeong-Hoon;Kim, Gil-Nam
    • Journal of Korean Society on Water Environment
    • /
    • v.18 no.3
    • /
    • pp.303-312
    • /
    • 2002
  • Polly-pigs technique was developed to remove internal rusts and scales from service pipes in the building by using Polly-pigs that were used as various applications in conventional plant pipelines. Results of cleaning experiments on 15mm GSP(Galvanic Steel Pipe) showed that hydraulic cross sectional area was more increased from 3.5% to 15.4% for straight part or elbow parts of several test pieces. Results of optical analysis also showed that rust and scale removed mostly by KDP series(only consisted of Polyurethane) were outside red colored scale ($Fe_2O_3{\cdot}H_2O$), and there was a limitation to the removal of black colored scale($Fe_2O{\cdot}nH_2O$) that was below red colored scale. But it was evaluated that KDPS series coated fine sand with KDP series could remove not only red colored scale but also black colored scale and more increase hydraulic cross sectional areas of 15mm GSP old service pipes from 13.0% to 17.9%. After KDPS series cleaning, hydraulic cross sectional areas of them were recovered from 95.9% to 99.5%. Turning force of Polly-pigs was largely improved by the effect of Helical guide vane(Cleaning v/v) and Rotating wing(Pigs), and the number of pig rotating also more increased sixteen times compared with conventional cleaning system without Helical guide vane and Rotating wing. After KDPC series cleaning of 100mm GSP old service pipes that hydraulic cross sectional areas were 90%, hydraulic cross sectional areas were almost recovered perfectly like new service pipes. Additionally pressure necessary to run Polly-pigs m 100mm GSP was lower and cleaning efficiency also was higher than 15mm GSP cleaning. Therefore it was thought that as the diameter of pipe was more increased, pressure necessary to clean service pipes was more decreased and cleaning efficiency was more increased in Polly-pigs cleaning.

Shape Design of Bends in District Heating Pipe System by Taguchi Method (다구찌 방법을 이용한 지역난방시스템의 벤드형상 설계)

  • Choi, Moon-Deok;Kim, Joo-Yong;Ko, Hyun-Il;Cho, Chong-Du
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.3
    • /
    • pp.307-313
    • /
    • 2010
  • In this study, alternative designs for the bends used in district heating pipes are investigated. The district heating pipes, which are subjected to temperatures of 10 to $120^{\circ}C$ and a water pressure of $16\;kgf/cm^2$, have to withstand thermomechanical cyclic loads when in use. These pipes comprise three concentric tubes: a steel pipe (internal), polyurethane (PUR) insulator (middle), and a high-density polyethylene (HDPE) case (external). In addition, the bends in the district heating pipe system are covered with foam pads that cause aging. In this study, an alternative bend design that does not involve the use of a foam pad is proposed to overcome the aging problem in the bends. In the proposed design, "shear rings" are added to the surface of a bend, and its dimensions are determined by a combination of the statistical (Taguchi) method and FEM. The geometrical parameters such as thickness, height, and number of the rings significantly affect the design optimization, and hence, they affect the results of the FEM.

A Study on the Improvement of Construction Cost Standards for Pipe Laying and Joining Work (관 부설 및 접합공사 공사비산정기준 개선에 관한 연구)

  • Oh, Jae-Hoon;Ahn, Bang-Ryul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.675-684
    • /
    • 2020
  • To prevent safety accidents caused by aging pipe infrastructure and to maintain water quality, construction projects for water and sewage pipes are actively conducted across Korea. This study analyzed the criteria situations, site survey details, and regulation revisions related to the calculation of construction cost standards for pipe laying and joining work. The analysis showed that the major causes for revision are the unclear construction scope, limitations in implementing some pipe materials due to installation facility types, workforce focused on ordinary labor, limitations of manual laying work, and the lack of tool hire cost and machine expense-calculation criteria. Field studies were conducted to categorize the pipes according to their features, in addition to identifying the use of lifting heavy equipment and light equipment. In addition, excavation and testing work conducted in connection to pipe laying, as well as the use of skilled labor, were investigated. The current study clarified the work scope through new common items, provides an organization based on the pipe material, adjusted the workforce ratio to focus more on skilled labor, and developed grounds for calculating machine expenses. These revisions were estimated to save approximately 1.28% of the construction costs in each project according to an analysis of the construction cost impact study. truction costs in each project, according to an analysis of construction cost impact study.

Corrosion control technique for pipeline system through injecting water stabilizer (수질안정화 약품 주입에 따른 상수도관 내부 부식제어 특성 연구)

  • Hwang, Byung-Gi;Woo, Dal-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.1
    • /
    • pp.545-551
    • /
    • 2011
  • Recently, demands for generating high quality tap waters are increasing with high concern of water pollution and corrosion of water pipelines. For the reasons, developing water quality stabilization technique in water purification system is sought rather than replacing to a new pipelines. In this study, high-purity liquid lime($Ca(OH)_2$) was introduced for a water quality stabilization technique in water purification process and simulated water distribution system of pilot-scale size was applied to evaluate anti-corrosion control effect. The effect of anti-corrosion control was calculated in terms of LSI(Langelier Saturation Index) In conclusion, the result of pilot plant showed improvement of corrosiveness by liquid lime($Ca(OH)_2$) with reduction of released iron(Fe). Application of anti-corrosion control technique to the mild steel coupon and the copper coupon were effective by indicating 35.4, 44.5% of improvements. Besides, sample pipes which were treated with liquid lime had formated more thicker layer of corrosion product inside of pipes. As a result, the process of injecting water stabilizer can greatly contribute to the high quality of tap water.

Process Risk Assessment for a Batch Condensation Reaction of Polyester Resin using K-PSR Technique (K-PSR 기법을 활용한 회분식 폴리에스터 축합반응에서의 공정 위험성 평가 연구)

  • Park, Kyung-Min;Lee, Dong-Kyu;Lee, Haakil;Lee, Joon-Man;Ahn, Won-Sool
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.35-42
    • /
    • 2019
  • Risk assessment and analysis for a medium-to-small sized chemical plant that manufactures a polyester resin by the process of batch-type condensation reaction was conducted using K-PSR technique which is one of the risk assessment methods used to implement the Process Safety Management System (PSM). K-PSR is a risk assessment technique developed by KOSHA to compensate for difficulties caused by the lack of infrastructure of medium-to-small sized chemical plants in the re-evaluation. To apply the K-PSR technique, the entire process of a selected chemical palnt was classified in two review sections, i.e., the condensation reaction process and the dilution/filtration process, and the potential risks of the process about these review sections were identified and classified based on the four guide-words (release, fire.explosion, process trouble, and injury). As the results of the research, refer to recommend of risk rating has been confirmed that non-destructive testing of old facilities and the preparation of LOTO procedures for the electrical equipments are necessary as specific measures to prevent the risk of release and fire.explosion. It was also shown that pressure gauges and thermometers should be installed on the hot-oil supply piping to minimize the process trouble, and exhausting hood should be installed to prevent potential injury.