A Basic Study on Development of Orchestra Blasting Method - About the Application of Rhythm - (연주식 발파공법 개발에 대한 기초적 연구 - 리듬감 부여에 관하여 -)

  • Yoon, Ji-Sun;Choi, Sung-Hyun;Bae, Sang-Hun
    • Explosives and Blasting
    • /
    • v.26 no.1
    • /
    • pp.39-48
    • /
    • 2008
  • Using Electronic Detonators which is well known for controlling vibration, we have been studying Orchestra Blasting Method, OBM, for many years to transform the unpleasant blasting sound to favorable sound in some job-sites such as tunneling and bench blasting which have to been taken place near some structures needed great care. In this study, we focus on rhythmical sense. First, we acquired individual wave from a shot. With the program named the Program Blasting Wave, PBW, it was analyzed and found that its best delay time was 34ms and 50ms was acceptable. Also, delay time was fitted into the music which was accepted after analyzing the rhythm. As a result, the blasting sound along with the music felt comfortable as if the music was played with base drum.

A Study on Characteristic of The New FINEX of a Emulsion Explosives (에멀션 계열의 New FINEX 특성 고찰)

  • 이천식;정민수;송영석;양난주
    • Explosives and Blasting
    • /
    • v.20 no.1
    • /
    • pp.51-59
    • /
    • 2002
  • 터널의 1차 숏크리트 라이닝의 설계선 외측 부분에 발파시 주변에 방사상으로 발생되는 균열들을 제어하기 위하여 Smooth-Blasting 공법 적용하여 외곽공에 정밀폭약(FINEX)을 사용한다. (주)한화에서는 Smooth-Blasting 공법의 중요사항인 폭약선정 사항에서 기존의 G/D 계열의 FINEX를 동일 발파조건에서 여굴 및 미굴의 발생을 최소화시키기 위해 에멀tus 계열의 New FINEX를 개발하여 약종 별로 동일 발파 패턴을 적용하여 터널에서 시험발파를 실시하여 천단 및 좌, 우 측벽의 여굴의 발생범위를 계측장비와, Half Casting을 측정하였다. 현장 시험발파를 통한 결과 흑운모 편마암(일축강도 $1500{\;}Kg/\textrm{cm}^2)$에서 여굴제어는 G/D계열의 FINEX 보다 EMX 계열의 New FINEX가 15~50% 정도 감소가 되었다.

A Numerical Study on the Effective Dimension in Slot-drilling Method (슬롯드릴링공법의 유효제원에 관한 수치해석적 연구)

  • Yoon, Ji-Sun;Lee, Jee-Hoon;Son, Sung-Hoon
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.50-58
    • /
    • 2010
  • This study explores the slot-drilling method that has not yet enough been studied in Korea and intends to provide a theoretical framework for putting the method into practice in a construction site. The possible reduction of ground vibration by implementing slot-drilling methods is addressed. Two main subjects dealt with include the variation of vibration velocity that is based on the distance between the slot-drilling and the epicenter of blasting and the analysis of appropriate effective dimension of slot-drilling width and height to control blasting vibration. This study shows that effect of vibration reduction decreases when distance of the slot-drilling and the epicenter of blasting is getting larger and also reveals that there is a correlation between the slot size and the vibration velocity at any point.

The Study of noise and vibration on application of the method breaking & excavating rock(Super wedge) (암파쇄굴착공법(Super wedge) 적용에 따른 소음.진동에 대한 고찰)

  • Won, Yeon-Ho;Kang, Choo-Won;Ryu, Chang-Ha
    • Proceedings of the KSEE Conference
    • /
    • 2006.10a
    • /
    • pp.167-184
    • /
    • 2006
  • There is cattle shed and house structure of a country village in the vicinity of the construction site. that is why the environmental effect evaluation on blasting had been done in advance to prevent any harm to those from the work. As the result, it is impossible to apply to the blasting method, and the Super wedge method, a kind of a rock-splitting method which there is no secondary breaking by a breaker of the methods breaking &excavating rock according to the classification of the blasting method by the ministry of construction & transpotation, applied to decrease noise and vibration, and to the work classification, the extent of noise and vibration measured with the instrument only for noise(SC-310c) and with the instrument only for vibration(BLASTMATE) respectively. A drilling, splitting, collecting, loading works at the closest point(about 10m) is barely possible on the consideration of vibration to the result of measurement, but carefulness needs on moving of equipment. On the case of noise, even drilling, collecting, loading work except splitting at the comparatively close point(about 20m) is difficult. So, the method breaking &excavating rock according to the classification of the blasting method by the ministry of construction & transpotation has to apply in consideration of noise level in accordance with the work processing.

  • PDF

Application of Rock Splitter to Rock Excavation in an Open pit (노천현장 암 파쇄 굴착에 따른 할암공법의 적용성 고찰)

  • Won, Yeon-Ho;Kang, Choo-Won
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.63-70
    • /
    • 2010
  • This study is investigated the extent of the noise and ground vibration in an adjacent zone of a cattle pen and an antiquated housing structures for judgement of the spot applicability on the extents of the noise and ground vibration of the rock-splitting method by an oil pressure. It is studied by measuring and analysing in an adjacent position the extents of the noise and ground vibration according to the work process of the rock-splitting method, such as drilling, rock-splitting, arranging rock, loading and by being compared with the permitted level on the noise and ground vibration fixed at the spot. To the results, it is identified that the influence to the noise has to be considered, even if the rock-splitting method is applied as an excavation method to lower a ground vibration by the classification on blasting method of the ministry of land, transport and marine affairs.

Rock Surface Protection According to Decrease of Blasting Vibration (진동저감 대책을 통한 절취면 보호)

  • Hong, Seong-Min;Song, Ha-Lim;Kang, Choo-Won;Chang, Ho-Min
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.21-28
    • /
    • 2012
  • Blasting methods are frequently used in case of forming slope artificially like slope cutting and open-cut method in the downtown area because of many economical and effective advantages. It is important that blasting work is carried out maintaining original strength of rock and not to damage rock face. And it is also considered that blasting method to decrease ground vibration is essential to the point of blast damages due to the ground vibration. In this study, to form a smooth plane of rock slope face, many trial blasts were carried out in this way that explosives were installed in detonating cord by equal interval in different charging method and stemming method. Using 4 blasting patterns in total 60 blast holes and 20 times of blasts were carried out. At the same time ground vibration measurements were carried out 15~102m away from the blast source, and total number of 310 data were obtained. Measured data for ground vibration velocity were analyzed so as to study blasting method to protect slope plane while decreasing blast vibration in an effective way.

Proposal of Vertical Direction Deck Delay Time for Efficient Formation of Free Surface of Bottom Deck (효율적 하부데크의 자유면 형성을 위한 수직방향 데크 단차 제안)

  • Seung-Won Jung;Seung-Joong Lee;Jin-Hyuk Song;Young-Ho Kim;Young-Suk Song;Nam-Sun Hwang
    • Explosives and Blasting
    • /
    • v.41 no.4
    • /
    • pp.41-50
    • /
    • 2023
  • This study, a vertical double-deck method using an electronic detonator was applied to increase excavation volume and reduce blast pollution. In the double deck method, there is a possibility that blasting efficiency may be reduced if bottom deck blasting is carried out without the free surface being completely formed after upper deck blasting. And for this reason, the blasting efficiency of the double deck method varies depending on the deck delay time. Therefore, in this study, we proposed four deck delay times applying 1 to 5 times the hole delay time. And blasting efficiency was evaluated according to fragmentation analysis. As a result of the fragmentation evaluation, the fragmentation of pattern 4 (deck delay time = hole delay time×5) was the best, but it was confirmed that fragmentation efficiency increased significantly from pattern 3 (deck delay time = hole delay time×3). Accordingly, it is analyzed that when blasting a vertical double deck, the deck delay time must be at least three times the hole delay time to obtain an efficient blasting effect.

Electronic Blasting Case Study Method Using Deck Charge (분상장약공법을 이용한 전자발파 시공사례)

  • Kim, Gab-Soo;Son, Young-Bok;Kim, Jae-Hoon;Choi, Hyung-Bin
    • Explosives and Blasting
    • /
    • v.33 no.1
    • /
    • pp.27-34
    • /
    • 2015
  • Recently, the residence complaints have been increased by blast vibration and noise issue due to increased urban blasting works so that the trouble between construction company and residence have been continuously increased. Deck-charge blasting method using electronic detonator provided not only blast vibration and noise control but also minimized residence complaints through shortening of the blasting period. This blasting method will be widely used for maximizing urban blasting productivity.