• Title/Summary/Keyword: 발파지반진동

Search Result 170, Processing Time 0.028 seconds

Consideration on the Relation between Vibration Level and Peak Particle Velocity in Regulation of Ground Vibration (지반진동 규제기준에서 진동레벨과 진동속도의 상호관계에 대한 고찰)

  • Choi, Byung-Hee;Ryu, Chang-Ha
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.1-8
    • /
    • 2012
  • The only law related to airblast and ground vibration control in Korea is the Noise and Vibration Control Act enforced by the Ministry of Environment. But this law mainly deals with the annoyance aspects of noises and vibrations in ordinary human life. Hence, the law defines the safety criteria of ground vibration as the vibration level (VL) of dB(V) unit. The ground vibrations produced from blasting, however, have the unique characteristics that can be shown in shock vibrations, and the duration is also very short compared to the vibrations from machinery, tools or facilities. Hence, vibration regulations for blasting operations usually define the safety criterion as the peak particle velocity (PPV) considering the effect of ground vibrations to structural damage. Notwithstanding, there are several attempts that predict VL from PPV or estimate VL based on the scaled distances (SD; in unit of $m/kg^{1/2}$ or $m/kg^{1/3}$) without considering their frequency spectra. It appears that these attempts are conducted mainly for the purpose of satisfying the law in blasting contracts. But, in principle there could no correlation between peaks of velocity and acceleration over entire frequency spectrum. Therefore, such correlations or estimations should be conducted only for the waves with the same or very similar frequency spectra.

Prediction of Ground Vibration According to the Priming Location (폭약의 기폭위치에 따른 지반진동 예측)

  • Kim, Seung-Eun;Ryu, Pog-Hyun;Kang, Choo-Won;Ko, Chin-Surk
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.69-75
    • /
    • 2010
  • Excavations by blasting in urban area have caused lots of complaints. Hence, special attentions need to be paid to controlling the ground vibrations in designing blasting for those areas. In this study, among the various parameters that can affect the propagation characteristics of ground vibrations, the effect of the priming location of explosive on the ground vibration level was studied for two types of emulsion explosives that had different detonation velocities. Three priming locations of top, middle, and bottom were considered in a charged hole. In the experiment on the effect of detonation velocity, the ground vibration caused by the explosive with a lower detonation velocity showed larger attenuation in the amplitude. The priming locations also affected the ground vibrations levels. The ground vibration level produced from middle priming was found to be larger than the other priming methods under the same blast conditions, but the attenuation of amplitude was also larger in this case. In contrast, the ground vibration level from bottom priming was not larger than the middle priming, but the attenuation was smaller so that the ground vibration was detected at a longer distance.

Propagation Characteristics of Ground Vibration Caused by Blast Hole Explosion of High Explosives in Limestone (고위력 폭약의 석회암 내 장약공 폭발에 의한 지반진동 전파특성에 관한 연구)

  • Gyeong-Gyu Kim;Chan-Hwi Shin;Han-Lim Kim;Ju-Suk Yang;Sang-Ho Bae;Kyung-Jae Yun;Sang-Ho Cho
    • Explosives and Blasting
    • /
    • v.41 no.4
    • /
    • pp.17-28
    • /
    • 2023
  • Recently, the utilization of underground space for research facilities and resource development has been on the rise, expanding development from shallow to deep underground. The establishment of deep underground spaces necessitates a thorough examination of rock stability under conditions of elevated stress and temperature. In instances of greater depth, the stability is influenced not only by the geological structure and discontinuity of rock but also by the propagation of ground vibrations resulting from earthquakes and rock blasting during excavation, causing stress changes in the underground cavity and impacting rock stability. In terms of blasting engineering, empirical regression models and numerical analysis methods are used to predict ground vibration through statistical regression analysis based on measured data. In this study, single-hole blasting was conducted, and the pressure of the blast hole and observation hole and ground vibration were measured. Based on the experimental results, the blast pressure blasting vibration at a distance, and the response characteristics of the tunnel floor, side walls, and ceiling were analyzed.

Comparative Study on the Characteristics of Ground Vibrations Produced from Borehole Blast Tests Using Electronic and Electric Detonators (전자뇌관과 전기뇌관을 사용한 시추공 발파시험에서의 지반진동 특성에 관한 비교 연구)

  • Choi, Hyung-Bin;Won, Yeon-Ho
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.37-49
    • /
    • 2010
  • Ground vibration caused by blasting in the urban area close to structures can give some indirect damage to human body and may lead to structural damage to buildings. At the stage of design or when complaints were filed by residents, the test blasting in borehole, which is most practical for expressing simple vibration wave form quantitatively, is usually chosen for assessing the degree of damage to structures. In this paper, some lessons gained from the application of electronic detonator triggering system in borehole test blasting are presented. The difference in delay time of detonator when borehole is blasted by electronic detonator and electric detonator are discussed. The peak particle velocities measured at the structure embedded in the similar rock layer to main line of tunnel at test site and measured at the road surface just above the tunnel having different overburden layers were analysed to draw their relationship. By comparing the results with those appearing in some published literatures, the usefulness of the borehole test blasting and the importance of delay time of detonator are addressed.

A study on the effect of blasting vibration and the optimal blasting offset according to the depth of tunnel (터널 심도에 따른 발파 진동 영향 및 최적 발파 이격거리 연구)

  • Kong, Suk-Min;Choi, Sang-Il;Kim, Yeong-Bae;Noh, Won-Seok;Kim, Chang-Yong;Lee, Seong-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.483-494
    • /
    • 2022
  • Owing to the saturation of ground spaces in downtown areas, underground spaces are being developed increasingly. Underground spaces are utilized for transportation, water supply and sewerage, communication zones, electric power zones, and various cultural complexes. In Korea, for excavating underground spaces, blasting methods using gunpowder such as the New Austrian Tunneling Method (NATM) are mainly used. However, the blasting method causes vibration and noise during tunnel excavation, generating many complaints from residents in the vicinity of the excavation site. To address this problem, various methods have been developed, and recently, vibration and noise have been reduced using deep excavation. This study predicts blast vibration changes according to the depth, under the same blasting and tunnel conditions, using numerical analysis based on the blast vibration measurement data of the GTX-A route, the tunnel cross-section drawings, and ground investigation reports. Furthermore, the necessary separation distance from densely populated areas such as residential areas is suggested by analyzing the trend of decreasing blast vibration according to the distance from ground surface directly above the blasting location.

The Influence of Ground Vibration Caused by Pile Driving on Power Line Tower Foundation (항타 진동이 송전탑 기초에 미치는 영향 연구)

  • Park, Jung-Bong
    • Explosives and Blasting
    • /
    • v.27 no.2
    • /
    • pp.42-47
    • /
    • 2009
  • Ground vibrations caused by pile driving or explosive blasting can affect the stability of power line tower and its foundation. Because the characteristics of ground vibrations generally depend on the distances from the blast, the ground vibrations should be controlled by taking the distance into account. In this study, ground vibration levels were measured at the foundation of a power line tower and on ground surface adjacent to the tower. The relationships between the dominant frequencies of the ground vibrations that were measured at both locations were comparatively investigated.

A Case Study on a Large Scale Borehole Test Blasting to Generate Man-made Earthquake (인공지진 발생을 위한 대규모 시추공 시험발파 사례연구)

  • Jeong, Ju-Hwan;Choi, Byung-Hee;Ryu, Chang-Ha;Min, Hyung-Dong;Choi, Hyung-Bin
    • Explosives and Blasting
    • /
    • v.27 no.2
    • /
    • pp.48-55
    • /
    • 2009
  • In the process of identifying the earth's crust structures to accurately locate the seismic epicenter, man-made earthquakes need to be generated. Such a large-scale ground vibration can be generated by a deep borehole blasting, but it can also accompany some environmental impacts on the surroundings. In this respect, a borehole test blasting was carried out to determine the maximum charge weight that could be used without affecting the various structures around the blast site. Total 400kg of gelatine-type dynamites was used in the test blast. As a result, a prediction equation for ground vibrations was derived from the measured data. With the allowable level of 3.0 mm/s for residential structures, the maximum charge weight was determined to be 677kg if military structures near the site were considered. But if the military structures were not considered, it was found that up to 2100kg of explosives could be used without affecting old houses in the nearby village.

Tunnel Blasting Design with Equations Obtained from Borehole and Crater Blasting (시추공 및 누두공 발파자료의 터널설계 적용)

  • 양형식;임성식;김원범
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.5
    • /
    • pp.327-333
    • /
    • 2003
  • Characteristics of vibration propagation of borehole blasting were analyzed with 578 borehole vibration data obtained from 23 sites which were used in tunnel and underground space design, and 221 tunnel vibration data fron 4 sites of tunnel under construction. Analysis results on the damping of vibration velocity show that site factors in borehole blasting were higher than those in tunnel blasting. And the critical charge calculated from regression equations at large scaled distance was lower in borehole blasting. Dominant frequency was in the range of 30∼60Hz for the borehole blasting and 60∼90Hz for the tunnel blasting. As a conclusion, the borehole blasting data should not be used on the tunnel blasting design without careful statistical analysis.

Establishment of a Safe Blasting Guideline for Pit Slopes in Pasir Coal Mine (파시르탄광의 사면안전을 위한 발파지침 수립 연구)

  • Choi, Byung-Hee;Ryu, Chang-Ha;SunWoo, Coon;Jung, Yong-Bok
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.418-426
    • /
    • 2008
  • A surface blasting method with a single tree face is currently used in Pasir Coal Mine in Indonesia. The single free face is usually the ground surface. This kind of blasting method is easy to use but inevitably causes enormous ground vibrations, which, in turn, can affect the stability of the slopes comprising the various boundaries of the open pit mine. In this regard, we decided to make a specific blasting guideline for the control of found vibrations to ensure the safety of the pit slopes and waste dumps of the mine. Firstly, we derived a prediction equation for the ground vibration levels that could be occurred during blasting in the pits. Then, we set the allowable levels of ground vibrations for the pit slopes and waste dumps as peak particle velocities of 120mm/s and 60mm/s, respectively. From the prediction equation and allowable levels, safe scaled distances were established for field use. The blast design equations for the pit slopes and waste dumps were $D_s{\geq}5\;and\;D_S{\geq}10$ respectively. We also provide several standard blasting patterns for the hole depths of $3.3{sim}8.8m$.

Optimization of Tunnel Blasting Design by Finite Element Method (유한요소해석을 이용한 터널 발파설계의 최적화)

  • 이인모;최종원;김상균;김동현;이두화;김영욱
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.5
    • /
    • pp.63-74
    • /
    • 2000
  • 지하구조물 걸설시 발파에 의한 암반의 굴착공법이 일반적으로 사용된다. 그러나 발파에 의한 암반의 굴착은 잔존암반의 손상과 진동을 유발하는 문제점을 가지고 있다. 현재까지는 이러한 암반의 손상과 진동문제를 해결하기 위해 현장계측을 기초로한 경험적인 방법이 이용되어 왔으나 여러 가지 한계점을 지니고 있는 것이 현실이다. 따라서 수치해석에 의한 터널 발파의 모델링을 이용하면 이러한 한계점을 보완할수 있을 것이다. 본 논문에서는 발파에 의한 발파공 주위 암반의 거동을 유한요소해석을 이용하여 규명하고, 토로터널의 표준발파패턴을 기초로 하여 외과공 발파와 외곽공에 인접한 주변공 발파에 의한 암방의 손상의 손상을 비교하여 발파패턴의 적절성을 평가하고자 하였으며, 이를 근거응 발파에 의한 암반의 손상을 최소하기 위한 발파패턴의 최적화를 도모하였다.

  • PDF