Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Diagnostic Analysis and Influential Factors of CM Fee Estimation (CM 대가 산정방식의 문제점 분석에 대한 연구 -문화예술회관 사례를 중심으로-)

  • Yoo, Byeong-Gi;Jung, Chan-Young;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.132-140
    • /
    • 2006
  • On December, 1996, Construction Management(CM) was introduced in Korean construction industry due to its managerial efficiency proven in the international construction industries. However, It have had serious problems with many regulations, standards, manuals and details of practices considering its constituents and industry conditions. Especially, there were controversial points in the CM fee estimate; difference between the fee on the owner's view point and that from contractor's that impedes appropriate CM services. Therefore, this paper is to analyze public construction projects into Cm fee calculation such as fee as a percent of construction cost, cost plus fixed fee and contract price, and analyzed what is irrationality and why irrationality is made. So it makes a contribution to a study on standards for paper CM fee calculation.

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

An Analysis of Capability of CM at Risk in Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 역량분석)

  • Yoo, Seung-Kyu;Choi, Seok-In;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.85-94
    • /
    • 2009
  • For the purpose of analysing the capability (knowledge, experience, and ability) of CM at Risk in the major construction company in korea, this study performed questionnaire survey with experts in the companies. Based on the analysis of the survey, the study was found as follows. 1) It is needed to increase the capability of preconstruction services, such as project management plan/manual, contract documents, value engineering, alternative analysis, time management, and claim. 2) Despite of gap of the capability between the present and the future CM services, the study concluded that the capability is sufficient to perform CM at Risk project in the major construction company.

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

A Study on the Improvement of Engineering and Construction Supervision Guarantee System in Korea (국내 설계.감리 등 용역보증제도 현황 및 개선방안 연구)

  • Lee, Yong-Hee;Choi, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.53-61
    • /
    • 2011
  • After several collapse accidents of large structures in the early 1990s in Korea, the government enacted a law that architectural, engineering and construction firms are obliged to have insurance for projects over a certain size. Particularly, with regard to insurance in design and construction supervision works (i.e. engineering insurance), although several operation-based problems were pointed out from practitioners, still little research has been done on analyzing current regnlartory and operational state and suggesting policy alternatives. Hence, this study applies Delphi technique to solicit current operational problems and propose a series of improvements on engineering insurance based on interview surveys targeting major market participants: municipalities, engineering firms, and insurance companies. Key findings culminate in adopting guarantee limits based on credit evaluation, abrogating joint surety, covering a loss of life, increasing insurance entrance fee, extending time covered, and etc. Reaching a consensus on the proposed alternatives between the market participants will form the foundation for sound developments of construction design and engineering industry.

Supply-Demand Forecast of Engineers according to the Change of Construction Engineers Qualification System (건설기술자 제도변화에 따른 건설기술인력 수급전망)

  • Park, Hwan-Pyo;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.46-54
    • /
    • 2009
  • In the early 90s, we had serious shortage of construction engineers for the expansion of construction market. So, Government has established the admitted engineer system in 1995. However, since year 2000, while the engineershortage has been resolved, the opposite situation has occurred: serious over-supply of construction engineers. Therefore, Government announced that would abolish the admitted engineer systems as recognized the existent admitted engineers from 2007. From this point of view, it is critical to make the accurate forecast of number of required construction engineers for providing the basis for the most appropriate policy from 2008 to 2017. This research have developed a construction engineer supply-demand forecast model based on the GDP and construction market analysis. The results of this research will be applied to the basic data that policy planner establishes the supply-demand policy of construction engineers.

A Study on the Performance Certification System of Inspection and Diagnostic Equipment for Infrastructure using Advanced Technologies (첨단기술을 이용한 시설물 점검 및 진단장비 성능인증체계에 대한 연구)

  • Hong, Sung-Ho;Kim, Jung-Gon;Cho, Jae-Young;Kim, Do-Hyoung;Kim, Jung-Yeol;Kim, Young-Min;Lee, Dong-Wook
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.97-111
    • /
    • 2021
  • Purpose: It is expected that various infrastructures diagnosis equipment will be needed as infrastructures management is strengthened to implement the Framework Act on Sustainable Infrastructure Management. It is necessary for a certification system to supply certified products of a reasonable level in accordance with market requirements for various convergence equipment. This paper deals with the introduction of certification system of inspection and diagnosis equipment for infrastructure using advanced technologies. Method: The basic elements, systems and procedures of certification system were reviewed through analyzing and comparing the existing similar certification system in Korea. In addition, a survey was conducted on a catalog method and the minimum performance criterion (sampling survey and complete enumeration survey) to equipment developers (manufacturers), clients and equipment users. Result: This survey showed that clients preferred complete enumeration method on the basis of minimum performance, and equipment users also preferred complete enumeration survey and sample survey, for minimum performance, at a similar rate. On the other hand, equipment developers preferred the catalog method. Conclusion: Clients and users who are the users of the diagnostic equipment preferred the minimum performance criterion because their trust in quality is important. On the other hand, developers(manufacturers) preferred the catalog method which adopts self certification because it is regulated in developing various products. There is no specific plan for the minimum performance standards required for the introduction of the method which users demand, at present. In addition, it is not desirable to force to introduce a certification system because it requires a considerable period of study to prepare the specific standards. Therefore, it is appropriate to operate the system for a certain period of time centering around the catalog method for the stable and continuous development of the infrastructure diagnosis and test equipment market in Korea. Also, it is effective to expand and develop the certification system to the extent that it minimizes the impact on the market when specific plans for the standards are prepared in the future.

Improvement of Technical Proposal Tendering Evaluation Criteria for Small and Medium sized Construction Projects (중·소형 건설공사를 위한 기술제안입찰 평가기준 개선)

  • Yu, Jun-Hyeok;Hyun, Chang-Taek;Moon, Hyun-Seok;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.95-105
    • /
    • 2012
  • The government introduced the technical proposal drafting system in September 2007, as a new method to stimulate technical competence among construction companies to require ingenuity, creativity, artistic sense, and high-level technology. However, an examination of instances has shown that this system has been applied only to large scale constructions worth 30 billion won or more, and not to small and medium constructions worth less than 30 billion won. This is because the evaluation criteria of the system is structured in a manner that makes it difficult to apply to small and medium constructions. This study presented methods to improve the evaluation factors, categories, and scoring scheme of the technical proposal creation system for medium to small scale constructions to be able to further apply the current system to small and medium constructions. The technical proposal evaluation criteria presented in this study was significant in that it enabled the technical proposal creation system that was mainly used for large scale constructions to be further applied to medium to small scale constructions. And it also contributes to the establishment and settlement of a new technical proposal tendering for medium to small scale constructions.

An Analysis on the Problems of Design Competition Process of Landscape Architecture by the Delphi Analysis Method (델파이 분석을 통한 조경설계공모 과정의 문제점 분석)

  • Lee, Joo-Hee;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.3
    • /
    • pp.83-93
    • /
    • 2013
  • This study has been performed to analyze and consider the problems after 30 years in terms of landscape design competition process in Korea, so that it can provide the basic data, which can improve the future landscape design competition. We have used Delphi Investigation to carry out a survey that targets professionals and identifies problems. The results are summarized as follows. Firstly, the results of the analysis of Landscape Design Competition for institution theory and case studies showed that there is an issue from four perspectives which are 'method of design competition', 'guidelines for design competition', 'winner selection process', and 'design changes after winning' Secondly, the process by professional Delphi performed expert analysis, and agree with expert opinion. As a result, we derived the problems of a landscape design competition system with the 12 items. Third, in the 'design competition style', two items, the 'design competition style' and 'problem of design public offering period' had become a problem. Fourth, the 'Guidelines for design competition', 'non-hierarchical excess of the amount of instructions', 'directive determined the guidelines', and the 'provision of confusion' three items had also become a problem. Fifth, 'sex expert committee review selection process winning work', 'Problems of participation', 'examination scoring system experts lack', and 'non-landscaping' had become a problem. Sixth, 'The design of the original order' as much as possible 'design changes after the winning work' Four 'order to Comments to reduce the creativity of the design of the climate', 'original extension', 'contractor feedback of excess without the promise of frequent personnel changes', design period of the person in charge is reflected in excess item has become a problem. I considered that a continuous research on the improvement of the problems of the landscape design competition system based on the results must be performed.