• Title/Summary/Keyword: 발주자의 역할

Search Result 53, Processing Time 0.025 seconds

CM Market Revitalization Strategies in Domestic Public Construction Projects based on Questionaries and Delphi Techniques (델파이기법을 이용한 국내 공공공사 용역형 CM 시장의 활성화 전략)

  • Oh, Se-Wook;Han, Seung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.131-142
    • /
    • 2012
  • Since CM for Fee has been introduced in domestic market of construction industry, Construction Management(CM) has been familiar with one of the established delivery systems in Korea. However, CM(CM for Fee) construction market has been stagnant consistently due to recent economic recessions. The fundamental causes of the current depression of CM construction market are highly related to the social/environmental factors(such as owner's negative perception about CM services, exclusive formation of the CM markets, unfeasible fee and limitations on technology developments in CM services) and the shortage of institutions associated with CM. Accordingly, fundamental improvements on the CM environment are required. This study suggests the feasible methods for improvement on CM system based on fundamental analysis of problems related to the environmental factors by conducting a delphi technique with professional personnels on various positions in CM markets.

Development of Construction Management Performance Checklists Using Analytic Hierarchy Process(AHP) (AHP 기법을 이용한 건설사업 단계별 CM업무 체크리스트 개발)

  • Lee, Tai-Sik;Jun, Young-Joon;Kim, Young-Min;Kwak, Doung-Koo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.342-346
    • /
    • 2006
  • As the construction industry gets specialized and complicated gradually, the number of participating organizations increased, and also the necessity of construction management(CM) is getting bigger because construction scale is becoming bigger. However, in spite of the increase in necessity, its activation through performance measurement and evaluation is very insufficient compared with advanced countries. Therefore, a checklist for CM by construction stage using AHP method in the current study is for efficient CM for successful completion of a project by dividing CM affairs by construction stage and checking performance degree by stage. If the CM checklist by construction stage, the final result of the study, is used by all the parties concerned such as construction managers, orders, designers, constructor, etc., it will be possibile to improve work efficiency of project management and produce a final outcome corresponding to the goals of a project.

  • PDF

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

Identification of Core Competencies of Construction Managers (CM단장 핵심역량 발굴에 관한 연구)

  • Kim, Dong-Hee;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.93-100
    • /
    • 2011
  • As the construction management(CM) market has grown, so has the CM competition in the market place. Consequently, competent construction managers become a core part of CM firms' competitiveness. The objective of the study is to identify and discuss core competencies of construction mangers based on literature survey, Delphi Method and AHP. Among various competencies required for construction managers, skills for problem solving, trust and negotiation skills were identified as the crux of construction managers' competencies. A better understanding of construction managers' core competencies is very critical in terms of CM firms' training of construction managers and continuos self-improvement for construction managers.

A Study on the Post-Evaluation of Landscape Design Competition based on Ground Theory - Case of Gwanggyo Lake Park in Korea - (근거이론을 활용한 조경현상설계의 사후평가 - 광교호수공원을 사례로 -)

  • Hong, Youn-Soon;Park, Jae-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.92-102
    • /
    • 2016
  • While there have many completions of large parks recently under development, there has been a dearth of quality assessments. Studies focused on post-evaluation have been made to resolve this, but most of these are biased toward user satisfaction after completion and therefore behaviour analysis has limitations on solving problemsduring the actual design implementation processes. Therefore, this study examined the internal phenomenon and structure of the implementation process of design competition through the ground theory and microscopic independent perspective. As a result, maintaining the identity and differentiation of parks derived from the preserved design competition scheme contributed greatly to completeness and satisfaction. Outcomes were mainly caused by the trust of public officials as the ordering organization, the will of policy decision-makers, and the competence of operational enterprises, etc. Negative factors such as undermining the whole concept of the park and landscape occurred as external pressure and related subjects intruded on change design factors due to variations in social conditions. Additionally, illogical construction processes occurred, such as a reinvestigation of the budget for restoration after damaging on original landscape. There have been needs for the improvement of the work processing system. On balance, an interventional role is very important in the park construction process, especially the PA and operation committee in terms of maintaining the basic direction, landscape design supervision for detailed designs, and expert construction management on LA in terms of rational work management in the field. The study, using the microscopic perspective of the designer and ground theory, deliver significant meaning as an early study by suggesting alternative methods for the after-evaluation of large parks and structurally looking into main influence factors driven during the construction process.

The Case of CM Type Supervision Apartment House Construction Work - Focused on the Case of Baekseok-Cheonan 2BL Construction Work - (공동주택건설공사의 CM형 책임감리 사례 - 천안백석 2BL 아파트건설공사 사례를 중심으로 -)

  • Lee, Kab-Weon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.41-48
    • /
    • 2004
  • The objective of the CM model projects is to achieve gradually the development of Domestic Construction, Industry with function, effects, problems and improvement which are the results after assessing tills finished project on the basis of CM Plan. The result is very useful of being activated CM and giving good orders continuously. Therefore this study describes work scope, organization, performance and management process for Baekseok-Cheonan 2BL project and picks out practical problems about CM and then suggests CM technical development directions and institutional improvements.

  • PDF

A Study of BIM-based Construction Management Work Process Development in Design Phase (설계단계의 BIM기반 CM 업무 프로세스 개발에 관한 연구 - 설계관리 업무를 중심으로 -)

  • Lee, Seoyun;Ham, Namhyuk;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.90-101
    • /
    • 2013
  • A typical construction project involves participation of various parties including clients, contractors, architects, and engineers for its successful completion, and yet has intrinsic differences of interests among the participants during the project execution period. A construction management (CM) services's role is then to resolve these differences of interests among the participants during the project execution, and lead the projects to its successful completion while representing the clients' demands and interests. The use of building information modeling (BIM) is increasing recently among construction projects, and those CM service companies are experiencing difficulties applying BIM. This is because the use of BIM in construction projects suggests a quite new set of operational paradigm. The purpose of this paper is then to review the recent cases of projects which used BIM; to analyze the these projects' processes; to reengineer the design phase process based on the lessons learned from recent BIM application; and to suggest a modified design phase process model that could improve the use of BIM and related coordination operations.

An Improvement Plan of Business Bounded System for Efficiency at Construction Industry through Game Theory (건설산업 효율성 향상을 위한 건설 업역 관련 제도 개선 방안)

  • Chang Su-Zin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.388-393
    • /
    • 2004
  • The organic law on the Construction Industry, initially, this law was enacted with a view to preserving and fostering the specialty of each type of industry. By dividing each construction business boundary, it gradually settles the system of construction specialized on the basis of productive stages. Controversy over the abolishing regulations on business boundary still continues to swirl. Since the intensity of exclusion as well as rigidities become increased. This results from the fact that informations are not shared among business boundary and businesses under the protection of the business boundary regulations choose 'rent-sicking activity'. According to dissidents against this law, structure should be established not by artificially enforced institution but by voluntary efforts of participants in construction industry. This paper aims at improving the competitive of the construction industry by showing the efficient system of construction and proving the legitimacy of abolishing business boundary

  • PDF

Study on the optimal construction of a concrete lining in a weathered rock (풍화암지반에 시공되는 콘크리트라이닝의 적정시공에 관한 연구)

  • Kim, Hyeongkeon;Lee, Chul;Lee, Sun-Woo;Park, Jun-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.33-47
    • /
    • 2015
  • Concrete lining in tunnel construction is used as secondary support for downward loads when primary support decays. The use of concrete lining varies greatly depending on the intentions of engineer and/or client. An engineer uses much smaller deformation modulus which determines the concrete lining thickness than of a pattern 3, when supporting patterns 4 and 5 are used in a weathered rock and soil. Considering these conditions, this study intends to suggest optimal construction procedures through a back analysis using a computer program(MIDAS-civil). Cases of Seoul Subway System line${\bigcirc}{\bigcirc}$ zone${\bigcirc}{\bigcirc}$ were selected to be examined for this study. The results show that it is possible to reduce the thickness of concrete lining. When results from this study were applied to Seoul Metropolitan subway construction projects, it is expected to bring economic benefits.

Predicting Default of Construction Companies Using Bayesian Probabilistic Approach (베이지안 확률적 접근법을 이용한 건설업체 부도 예측에 관한 연구)

  • Hong, Sungmoon;Hwang, Jaeyeon;Kwon, Taewhan;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.13-21
    • /
    • 2016
  • Insolvency of construction companies that play the role of main contractors can lead to clients' losses due to non-fulfillment of construction contracts, and it can have negative effects on the financial soundness of construction companies and suppliers. The construction industry has the cash flow financial characteristic of receiving a project and getting payment based on the progress of the construction. As such, insolvency during project progress can lead to financial losses, which is why the prediction of construction companies is so important. The prediction of insolvency of Korean construction companies are often made through the KMV model from the KMV (Kealhofer McQuown and Vasicek) Company developed in the U.S. during the early 90s, but this model is insufficient in predicting construction companies because it was developed based on credit risk assessment of general companies and banks. In addition, the predictive performance of KMV value's insolvency probability is continuously being questioned due to lack of number of analyzed companies and data. Therefore, in order to resolve such issues, the Bayesian Probabilistic Approach is to be combined with the existing insolvency predictive probability model. This is because if the Prior Probability of Bayesian statistics can be appropriately predicted, reliable Posterior Probability can be predicted through ensured conditionality on the evidence despite the lack of data. Thus, this study is to measure the Expected Default Frequency (EDF) by utilizing the Bayesian Probabilistic Approach with the existing insolvency predictive probability model and predict the accuracy by comparing the result with the EDF of the existing model.