• Title/Summary/Keyword: 목표원가관리

Search Result 36, Processing Time 0.033 seconds

Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM (BIM 객체분류체계 (OBS) 개념 및 구조)

  • Jung, Youngsoo;Kim, Yesol;Kim, Min;Ju, Taehwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.88-96
    • /
    • 2013
  • Recent proliferation of building information modeling (BIM) has actively stimulated integrated utilization of geometric (graphic) and non-geometric (non-graphic) data. Nevertheless, physically and logically, linking and maintaining these two different types of data in an integrated manner requires enormous overhead efforts for practical implementation. In order to address this problem, this paper proposes a concept and structure of the object breakdown structure (OBS) that facilitates advanced BIM implementations in an automated and effective manner. Proposed OBS numbering system has secure rules for organizing graphic objects in full considerations of effectively integrating with non-geometric data (e.g. cost and schedule). It also removes repetitive linking process caused by design changes or modifications. The result of applying this concept to a housing project revealed that only 120 definitions controled over 6,000 graphic objects for full integration with cost and schedule functions.

Study of CMM base Information Technology company level estimation (CMM 기반 정보기술 업체 수준평가에 관한 연구)

  • Kim Tai-Dal
    • Journal of Internet Computing and Services
    • /
    • v.5 no.1
    • /
    • pp.33-39
    • /
    • 2004
  • In this paper, so that government official in target extent of relevant shame capacitates CMM measuring achievement result by each process as quantitative because do standard, repeat and achieves gap analysis and estimation solidify knowledge management of information base enabling "Quality control, production management, cost control, integral management of knowledge", Solidify customer service through "high-quality, differentiation" of information. Establish administration and supervision item to reach 4 steps level in information ability measurement in formation to prove business efficiency through process optimization and improves formation maturity through voluntary effort of formation continuously. Suggested model who analyze and evaluates application in domestic SI specialty company.I specialty company.

  • PDF

Development of Cost Management Process during Design Phase based on Design to Cost (DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발)

  • Park, So-Hyun;Moon, Hyun-Seok;Hyun, Chang-Teak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF

A Proposal of Safety Risk Management using Virtual Reality (시각화 기술을 이용한 안전관리 방법 제안)

  • Lee, Kwang-Pyo;Lee, Hyun-Su;Park, Mun-Seo;Kim, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.521-524
    • /
    • 2008
  • The main goal of construction projects from the past has been enhancing efficiency by reducing cost and time. Compared to this, it is true that for a long time not much attention was paid to safety management. For this reason, safety management is much behind cost and time management but nevertheless, not much improvement has been made. The current safety management is only focused on managing after an occurrence based on knowledge like safety standards and rules. Even though safety accident is reducing in domestic construction projects, the extent of a accident is getting greater because construction projects are getting more complex and sophisticated. Moreover, the actual loss due to accident is increasing and the severeness of a hazard is getting worse. Therefore, to improve the current conditions of safety management, we propose a more effective safety management program. This program is a safety managing method using virtual reality. Property, entity, safety library is applied and finally, aims to continuously manage and prevent rather than deal with an accident/disaster after it happens.

  • PDF

The Role of the Center for Technology Fusion in Construction (첨단융합건설연구단의 역할)

  • Kim, Hyoung-Kwan;Han, Seung-Heon;Kim, Moon-Kyum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.229-232
    • /
    • 2006
  • The Center for Technology Fusion in Construction was established on Sep. 30, 2005, with the support of Korea Ministry of Construction and Transportation and Korea Institute of Construction and Transportation Technology Evaluation and Planning. It aims to develop the next generation of economic growth engine through the fusion of traditional construction technology and cutting-edge emerging technologies. To achieve this vision, the center tries to establish a system for the systematic construction research based on the fusion approach. The scope of the center focuses on improving the performance of construction project, including planning, design, construction, and maintenance. Along with the newly developed Korea Construction Technology Road Map, the center is expected to significantly contribute to the development of innovative construction technologies for the world-class Korean society.

  • PDF

Development of Activity Pattern Analysis and its Application to the Health Check-up Service Organization (활동패턴분석방법론의 개발과 적용 : 종합건강검진서비스 적용사례를 중심으로)

  • Moon, Jae Ung;Ahn, Joong Ho
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.3
    • /
    • pp.69-92
    • /
    • 2013
  • Activity Pattern Analysis(APA) is the methodology to Design the functions of information systems, to Estimate the monetary value of IS based on Activity Based Costing, to Acquire feasibility of IT Project. This study shows APA case in Health Check-up Service Organization (G-Center) and the Utility of APA. G-Center had acquired Five Outcomes through APA: (1) IT Strategy, (2) IT Project Goals, (3) Transformed Business Process, (4) Functional Blueprint of Information Systems, (5) IT Project budget and its feasibility. APA consists of three analysis processes; Activity Separation, Activity Rearrangement, Activity Costing. APA is flexible in determinating the range and the time of analysis, and is able to expand the Actors(as analysis objects) based on the purpose of analysis by researcher. Eventually APA can be used to do internal IT Management effectively.

A Study on the Effects of Management Strategy, Collaboration Process and SCM Integration on Corporate Performance in Small and Midsize Parts Manufacturers (중소부품제조업체의 경영전략, 협업프로세스 및 SCM통합이 기업성과에 미치는 영향에 관한 연구)

  • Lee, Seol-Bin;Park, Ju-Gyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.7
    • /
    • pp.448-466
    • /
    • 2019
  • Today, companies are increasingly focused on SCM (Supply Chain Management) as a means for cost-cutting and efficient operation. The company's ultimate objective is to win and maintain a sustained dominant position in the uncertainties of the global environment and future competitiveness. In this respect, this study examined the effects of management strategy, collaboration process and SCM integration on corporate performance in small and midsize parts manufacturers. The results of empirical analysis are summarized as follows. Management strategy, collaboration process and SCM integration had positive effects on corporate performance in domestic small and midsize parts manufacturers, and all hypotheses were supported. Consequently, it can be confirmed that quality, cost and flexibility for management strategy, and strategic objective perception, support policy, problem solution and knowledge information sharing for delivery and collaboration as small and midsize parts manufacturers are mechanisms for improving quality reliability, decreasing cost, delivery obedience and information system operation of SCM integration, and boosting corporate quantitative and qualitative performance.

A Study on Logistics Cost Management to Using Cost Volume Profit (CVP를 이용한 물류비 관리에 관한 연구)

  • Kim Jin-Sep;Kim Ong-Soo
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.7
    • /
    • pp.22-30
    • /
    • 2006
  • The goal of the company and profit maximization can be achieved by creating revenue or reducing costs. What can be done by the effort of the firm itself is possible through cost-reduction rather than through revenue-creation. Under this economic situation, one of the best way for cost-reduction is to reduce cost of logistics. But logistics costs of a firm is continually increased because of the various customer-satisfaction, competition. This study considers that logistics cost management system be able to apply business practice through to used only a merit of CVP(Cost - Volume Profit) analysis method for effective decision making. To conclude, this study depicts that logistics cost management according to used a merit of CVP analysis method can provide information useful for making strategy of logistics. In short, It is reduce to more costs of logistics investment than are necessary. and, I will expect a man who charge logistics to improvement, adaptation, and application.

  • PDF

A Construction safety management system based on Building Information Modeling and Real-time Locating System (위치추적기술을 이용한 BIM기반 건설현장 안전관리 시스템)

  • Lee, Hyun-Soo;Lee, Kwang-Pyo;Park, Moon-Seo;Kim, Hyun-Soo;Lee, Sa-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.135-145
    • /
    • 2009
  • The main goal of construction projects from the past has been enhancing efficiency by reducing cost and time. but, seeing the current condition of safety management of many construction companies nowadays, it is true that not much attention has been paid to safety management for a long time. However, there are paradigm shift from the cost and term of works to safety management in the construction industry, from this circumstance the safety management is evaluated more importantly. Though less accident happens compared to past, the accidents are getting greater because construction projects nowadays are bigger and more complex and monetary loss from the accidents are increasing. Also, the severity is getting greater and even fatal. For this reason, more improved safety management is very necessary. Therefore, we are to propose more efficient system for safety management in this thesis. Technical parts for developing system include many technique such as Real Time Locating system, and other techniques like Monitoring module based on BIM, Data Mart, Alarm are also applied together. Through this system, in the construction site, safety management is performed more effectively and widely because the system can manage the human resource and fluid situation. Also, safety manager can conduct more systematically and advanced safety management through human resource dominated safety management.

A Study on the Activation of Green Remodeling to Achieve Carbon Neutrality - Focusing on a case of Gwangmyeong City - (탄소중립 목표 달성을 위한 그린리모델링 활성화 방안에 관한 연구 - 광명시 사례를 중심으로 -)

  • Kim, Gi-Ran;Lee, Ju-hyun;Kim, Kyong Ju;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.12-21
    • /
    • 2023
  • Green remodeling proposed in the Korean New Deal is a project to build or remodel eco-friendly and energy-efficient buildings using renewable energy facilities and high-performance insulation for public buildings. The government intends to achieve the carbon emission reduction target by conducting green remodeling. Major overseas cities that conduct green remodeling are actively promoting technology support and promotion along with energy performance evaluation according to building characteristics, subsidies for private revitalization, and tax benefits. With this background, the analysis of the current status and problems of the green remodeling project was performed and the Activation factors of Green Remodeling were derived from survey results. This study suggested strategic measures such as a participation of civil society, promotion, and priority selection of administration and policy measures such as a leading role of the public sector, expanding support for the socially underprivileged, and financial support and tax benefits. And this study results are expected to be utilized as basic data to promote the green remodeling project.