• Title/Summary/Keyword: 모델 Construction Management

Search Result 1,195, Processing Time 0.026 seconds

A Study on the Setup Model of Safety Management Information System in the Construction Management (건설산업관리(CM)에서 안전관리정보시스템 구축 모델에 관한 연구)

  • 김영수;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.3
    • /
    • pp.45-55
    • /
    • 2003
  • Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety control of domestic CM, this study analyzed safety control operation system in CM home and abroad and suggested a model for the construction of safety control management information system suitable to the conditions of Korea.

Datamodel for Productivity Management of Construction Project (건설공사 생산성 관리를 위한 데이터모델)

  • Ryu Han-Guk;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2002
  • Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

  • PDF

An Information Framework for the Derivation of Process Context from Construction Site Digital Images (건설현장의 프로세스 Context 추출을 위한 디지털 이미지 정보체계 구축)

  • Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.80-91
    • /
    • 2005
  • Although construction site photos contain important as_built information, technique and knowledge, there has been lack of frameworks to store and manage construction site photos efficiently and effectively. The problems in site photo management are getting increasingly serious, as digital cameras are adapted as collection tools of site Photos. This research suggests an information framework(named CIIM: Construction Image Information Model) to manage and share construction information based on 5W1H in order to derive construction context, which includes technologies, lessons-teamed and knowledge, from construction site photos, and a site photo management system named CIMS II (Construction Image information Management system II was developed to verify the model. It is expected that the results of this research that are an information framework and an system could help more effective classification, management, search and derivation of context in a construction project.

Development of BIM-based Information Management Model for Efficient Building Maintenance (건축물 유지관리 효율성 향상을 위한 BIM 기반 정보관리 모델제시)

  • Sung, Min-Woo;Kim, Ka-Ram;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.137-140
    • /
    • 2011
  • A systemic building maintenance management is necessary to supply an convenience and safety environment by maintain the origin features for a building's life. However, the exist maintenance management system has some problems such as interoperability of information or standardization of data. In those reasons, a critical information for maintenance a building may be lost and changed. In addition, the data could be crashed or lost on a process of re-input or re-produce. This paper purpose the interoperability in exchanging data between design/construction and operation phases. In addition, this model will enhance the efficiency of building maintenance tasks through information quality improvement and data reproduction prevention.

  • PDF

A Model for Safety Education Fit for Individual Personality of Construction Worker (건설근로자의 개인적 특성에 맞는 안전교육 모델)

  • Kim, Eun-Jeung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.116-126
    • /
    • 2008
  • Safety education, which aims to cultivate an understanding of safety, to help acquire safety skills, and to improve attitude toward safety, is an important safety measure that doesn't entail restrictions to be carried out efficiently. Furthermore, safety education is perceived to be the most preferred measure in reducing the occurrence of accident. The current practice of safety education In construction sites, however, is all formal and has no substance. Safety education became a mere boring time to workers since the material is not related to them, and does not reflect the individual personalities, which cannot induce voluntary participation of workers. Thus, it is vital to develop various safety education models suitable for individual personalities of construction workers. This study aims to provide the basic data necessary to establish safety education models according to individual personalities of construction workers. On this, the study seeks to present a model for safety education complying with individual personality of construction workers by a survey using questionnaires and statistical analyses to workers on the construction sites.

An Estimating Model for Job-Site Overhead Costs according to Progress Rate (공정률에 따른 아파트 건설공사 현장관리비 산정모델)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.43-52
    • /
    • 2018
  • Generally, research on construction cost has been done mostly regarding its direct cost, thus model regarding indirect cost lacks attention. This research seeks to introduce a model to predict on-site overhead cost for apartment construction projects, which constitutes a big portion in Korean construction industry. We devised an equation of 9th degree via curve-fitting, using multiple on-site actual expense data, which can be used to calculate per-progress rate, per-day on-site overhead cost. We further show prospective usage of the model by applying it on construction projects sizing about 30 billion won. Regarding the fact that previous studies could not recognize pattern changes of a total on-site overhead cost, this model is worthy of its conveniency and thoroughness, as well as providing reasonal ground for its derivation in predicting on-site overhead cost of apartment construction projects.

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

A Manpower Forecasting Regression Model for Apartment House Construction Project based on the Historical Data (실적자료 분석을 통한 공동주택공사 노무량 예측 회귀모델)

  • Son, Yong-Seok;Shim, In-Bo;Kwon, Jae-Sung;Jeon, Sang-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.85-93
    • /
    • 2006
  • This study is started from a situation of korean construction which has been undergoing diversity. And risk of construction project has been increased recently. The purpose of this study is to propose the model which is able to estimate the proper manpower by eliciting the variable which is offered in the pre-design and construction phase. The existing method of estimate has a problem with calculating exact costs. For this model, it was analyzed the existing manpower estimating model and used historical data of 38 apartment houses, constructed from 2000 to now. Based on these, the regression model of the construction manpower was built. And then the regression model was verified. The result of verification was relatively adequate in the statistics exept for some cases. This regression model will help make it possible for constructor to estimate the deduction of retirement more accurate than existing method.