Optimization of real-time path finding for material handling of finishing work considering the logistics flow (물류량을 고려한 마감공사 자재운반의 실시간 경로탐색 최적화 연구)

  • Kim, Wansoub;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.170-171
    • /
    • 2015
  • Resource procurement and material handling are considered as a significant part of construction project especially in large or tall building construction site. There are multiple variables that must be considered in a construction site during finishing work such as movement of materials, equipments, and workers. Therefore, it is difficult for construction workers to find the material handling path solely by intuition. The aim of this study is to propose a real-time path finding model suitable for complicated logistics flow in the field. The model explores the optimal transport path of finishing material with its basis on optimization algorithm, and it determines the direction of the Smart Sign. The proposed model is expected to be utilized for planning of efficient finishing material handling.

  • PDF

Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work (마감공사 생산성 향상을 위한 리프트 카 최적배치 모델)

  • Lee, Dongmin;Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information (3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.

Classifying Sub-Categories of Apartment Defect Repair Tasks: A Machine Learning Approach (아파트 하자 보수 시설공사 세부공종 머신러닝 분류 시스템에 관한 연구)

  • Kim, Eunhye;Ji, HongGeun;Kim, Jina;Park, Eunil;Ohm, Jay Y.
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.10 no.9
    • /
    • pp.359-366
    • /
    • 2021
  • A number of construction companies in Korea invest considerable human and financial resources to construct a system for managing apartment defect data and for categorizing repair tasks. Thus, this study proposes machine learning models to automatically classify defect complaint text-data into one of the sub categories of 'finishing work' (i.e., one of the defect repair tasks). In the proposed models, we employed two word representation methods (Bag-of-words, Term Frequency-Inverse Document Frequency (TF-IDF)) and two machine learning classifiers (Support Vector Machine, Random Forest). In particular, we conducted both binary- and multi- classification tasks to classify 9 sub categories of finishing work: home appliance installation work, paperwork, painting work, plastering work, interior masonry work, plaster finishing work, indoor furniture installation work, kitchen facility installation work, and tiling work. The machine learning classifiers using the TF-IDF representation method and Random Forest classification achieved more than 90% accuracy, precision, recall, and F1 score. We shed light on the possibility of constructing automated defect classification systems based on the proposed machine learning models.

The Development of Productivity Prediction Model for Interior Finishes of Apartment using Deep Learning Techniques (Deep Learning 기반 공동주택 마감공사 단위작업별 생산성 예측모델 개발 - 내장공사를 중심으로 -)

  • Lee, Giryun;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.3-12
    • /
    • 2019
  • Despite the importance and function of productivity information, in the Korean construction industry, the method of collecting and analyzing productivity data has not been organized. Also, in most cases, productivity management is reliant on the experience and intuitions of field managers, and productivity data are rarely being utilized in planning and management. Accordingly, this study intends to develop a prediction model for interior finishes of apartment using deep learning techniques, so as to provide a foundation for analyzing the productivity impacting factors and predicting productivity. The result of the study, productivity prediction model for interior finishes of apartment using deep learning techniques, can be a basic module of apartment project management system by applying deep learning to reliable productivity data and developing as data is accumulated in the future. It can also be used in project engineering processes such as estimating work, calculating work days for process planning, and calculating input labor based on productivity data from similar projects in the past. Further, when productivity diverging from predicted productivity is discovered during construction, it is expected that it will be possible to analyze the cause(s) thereof and implement prompt response and preventive measures.

A Decision-Making Model of Integrated Vertical and Horizontal Move Plan for Finishing Material in Righ-Rise Building Construction (고층건물공사 마감자재의 수직$\cdot$수평이동계획이 통합된 의사결정모델)

  • Ahn Byung-Ju;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.47-58
    • /
    • 2001
  • Of all the site logistics technologies in high-rise building construction, both vertical and horizontal move plan, are the most imperative factors. And the horizontal plan follows lift-up plan as of the vertical plan. However though it may be, temporary lifts on site are numbered by heuristic formulas. The quantity of finishing material cannot be converted into lift-up load per finishing material. The lift-up plan cannot be evaluated the feasibility for finishing material move plan by a reasonable evaluation methodology. The horizontal plan is far from the vertical one. And the information as an input data for the horizontal plan is devoid of package unit size, length, and volume per finishing material. These can hardly result in reasonable and detail decision on how much to use temporary lifts, how long to use these, and where to deposit each finishing material. Therefore, this study is to suggest a decision-making model that can integrate vertical and horizontal material move plan in high-rise building construction and make a decision the plans systematically. And the study is to explain the concept, methodology, and contents of the model applied to a virtual project, named as MT 130 (Millennium Tower 130). By the model, the planner can shift his/her thinking framework on site logistics management products-oriented Into process-oriented. He/she can manage a project by the framework as system thinking, evaluate the feasibility of a lift-up plan, and decide the horizontal plan integrated with the lift-up.

  • PDF

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

Process Interference Management for Finish Works using Mobile Technology (모바일 기술을 이용한 마감공사의 작업간섭 관리)

  • Ko, Yong-Ho;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.