• Title/Summary/Keyword: 리스크분석

Search Result 713, Processing Time 0.026 seconds

A Study on the Entry Strategies of Small and Medium Sized Landscape Contractors to Vietnam by Risk Analysis in Overseas Projects (해외사업 리스크 분석을 통한 중소 조경건설업체의 베트남 진출전략에 관한 연구)

  • Tae, Jongwook;Jeong, Daeyoung;Hwang, Joon;Chon, Jinhyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.6
    • /
    • pp.1-16
    • /
    • 2018
  • The decline in the construction industry has led to a decrease the profitability of small and medium-sized landscape contractors. To relieve this situation, small and medium-sized landscape contractors have continued to proactively find ways to enter global construction markets. However, many small and medium-sized landscape contractors face risks due to their lack of capacity and insufficient preparations to extend the business abroad. Thus, this study aims to analyze the current condition of the Vietnamese construction market and the related risk factors. It then suggests strategies to improve the small and medium-sized landscape contractors' competitiveness in that market. We investigated the business climate and analyzed risk factors. Finally, we developed expansion strategies and conducted in-depth interviews with six overseas construction professionals. The study results first showed that efforts to improve infrastructure and the increased demand for housing in Vietnam will lead to more opportunities for small and medium-sized landscape contractors entering the Vietnamese construction market. However, changes in the Vietnamese business climate may act as a variable. Second, we found that small and medium-sized landscape contractors' risk factors are mainly related to laws and regulations, government finance, market fluctuations, public administration system, minimum wage increases, financing and bonds, contracting, trees and materials, and design errors. Finally, small and medium-sized landscape contractors are required to consider the following when seeking to enter the Vietnamese construction market: short-term strategy and mid-to-long-term strategy. This study will be used as the basis for small and medium-sized landscape contractors to plan to enter the Vietnamese construction market and to contribute to the expansion of the global construction market in the landscape industry.

Risk Identification and Priority Evaluation of Military Facility Relocation by Endowment and Concession Project (기부대양여 사업에 의한 군사시설 이전의 리스크 요인 도출 및 우선순위 평가)

  • Kim, Kukjoo;Ahn, Sungjin;Park, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.3-10
    • /
    • 2020
  • The endowment and concession has been put to practical use for the relocation projects of military Facilities. Yet, in terms of the project implementation, delay of a great deal of the projects is occurring due to related regulations and standards, as well as a lack of mutual understanding between project implementers and military units. This study analyzes the risk factors by identifying and prioritizing the potential risk factors at each stage of project implementation such as the issues that limit project characteristics and implementation. Among the derived risk factors, request exceeding facility standards in the licensing and design phases, opposition to troop relocation in the project approval phase, design change during construction phase in the construction and completion phases, dissenting opinions on endowed/conceded property in the property disposal phase and absence of facility standards in the MOA conclusion phase were found to be the main object of consideration in risk management. This study is expected to provide project managers with a guideline for effectively pursuing the projects, as it provides prioritization and optimization of risk management.

A Study on the Sensitivity Analysis of the Financial Analysis Item in Apartment Project (공동주택 사업의 수지분석 항목에 대한 민감도 분석에 관한 연구)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.100-109
    • /
    • 2006
  • Feasibility analysis is a crucial key to success or failure of housing project. Existing feasibility analysis in construction company is based on intuitive approach rather than systematic approach. Usually feasibility analysis in a narrow sense is a financial analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. So, the purpose of this study is to analyze the sensitivity of financial analysis item about profit rate by means of monte carlo simulation and this will improve accuracy of feasibility analysis and decision making.

Analysis of Loan Comparison Platform User's Default Risk (대출중개 플랫폼별 고객의 채무불이행 리스크 비교)

  • SeongWoo Lee;Yeonkook J. Kim
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.29 no.2
    • /
    • pp.119-131
    • /
    • 2024
  • In recent years, there has been a significant growth in loan comparson services offered by fintech platforms in South Korea. However, it has been reported that loan comparison platform users tend to have a higher risk of default compared to non-users. This paper investigates the difference in platform-specific credit risk factors using survival analysis models - Kaplan-Meier curves and Accelerated Failure Time (AFT) model. Our findings show that, relative to non-users, users of loan comparison platforms are characterized by elevated default rates, a greater propensity for home ownership, lower credit scores, and shorter loan durations. Furthermore, our AFT models elucidate the variance in default risk among the various loan comparison service platforms, highlighting the imperative for customized strategies that address the unique risk profiles of customers on each platform.

Quantification Model Development of Human Accidents on External Construction Site by Applying Probabilistic Method (확률론적 기법을 활용한 건설현장 외부 인명피해 정량화 모델 개발)

  • Ha, Sun-Geun;Kim, Tae-Hui;Son, Ki-Young;Kim, Ji-Myong;Son, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.611-619
    • /
    • 2018
  • The researches have only conducted regarding construction safety management and risk on interior construction site(workers) and is insufficient about the exterior construction site(third party). As a result, ordinary people who were near construction sites have injured and hold a negative view when they think about the construction industry because construction industry have been exposed to them having a high accidents rate through media. In addition, the importance of industrial disaster prevention is emphasized at this point in time, the overall safety management system should be constructed with considering construction site external(third human) for improving the negative image of the construction industry among ordinary people. Therefore, the objective of this study is to develop the quantification model of human accident utilizing the insurance claim payout occurred construction site exterior(third party). In the future, it can be used as a reference for developing the safety management checklist in construction site interior exterior and development for forecasting control system of human accident.

The Link between CVC Investments and Firm Innovation: Focusing on the Moderating Role of ESG Risk (기업벤처캐피탈(CVC) 투자와 투자기업 혁신 성과 간의 관계: ESG 리스크의 조절 효과를 중심으로)

  • Son, Hanei
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.17 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This study aims to investigate the relationship between Corporate Venture Capital(CVC) investments and firm innovation, exploring the moderating effect of corporate ESG risk on this relationship. First, adopting the organizational learning theory, I theorize a process in which a firm's relationship with a venture through CVC investments acts as an external innovation source for learning and ultimately short-term innovation. Also, based on the discussion of the stakeholder theory, I argue that when a firm is evaluated as having high ESG risk externally, this may have a negative moderating effect that weakens the relationship between CVC investments and innovative performance. In order to verify these hypotheses, panel data analysis was performed using CVC investments data, patent application data, and ESG risk scores of US high-tech firms from 1993 to 2018. As a result of the analysis, as expected, it was found that the more the firm invests in ventures through CVC, the more the firm's innovative performance increases. In addition, the social aspect of ESG risk of a firm, related to the local community and employees, were found to weaken the association between CVC investments and innovative performance. This study expands the understanding of existing research on CVC investments as a vehicle for learning and innovation. Focusing on the importance of relationship with ventures rather than the size of CVC investments, I empirically examined that the formation of CVC relationships with ventures is directly related to the short-term innovation of investing firms. Additionally, this study contributes to the CVC literature by including stakeholders in the current discussion in addition to investing firms and portfolio ventures. Finally, this study investigated how ESG issues, which are attracting attention as playing an important role in firm activities, are related to CVC investments.

A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment (회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구)

  • Lee Man-Hee;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.226-229
    • /
    • 2003
  • Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

  • PDF

Probabilistic Risk Evaluation Method for Human-induced Disaster by Risk Curve Analysis (확률.통계적 리스크분석을 활용한 인적재난 위험평가 기법 제안)

  • Park, So-Soon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.6
    • /
    • pp.57-68
    • /
    • 2009
  • Recently, damage scale of human-induced disaster is sharply increased but its occurrences and damages are so uncertain that it is hard to construct a resonable response & mitigation plan for infrastructures. Therefore, the needs for a advanced risk management technique based on a probabilistic and stochastic risk evaluation theory is increased. In this study, these evaluation methods were investigated and a advanced disaster risk evaluation method, which is based on the probabilistic or stochastic risk assessment theory and also is a quantitative evaluation technique, was suggested. With this method, the safety changes as the result of fire damage management for recent 40 years was analyzed. And the result was compared with that of Japan. Through the consilience of the traditional risk assessment method and this method, a stochastical estimation technique for the uncertainty of future disaster's damage could support a cost-effective information for a resonable decision making on disaster mitigation.

A Study on Correlation Analysis of Risk Factors for Urban Regeneration Using ISM method (ISM기법을 이용한 도시재생사업 리스크 요인의 상관성 분석에 관한 연구)

  • Park, Beom-Suk;Jin, Run-Zhi;Han, Sangwon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.192-193
    • /
    • 2013
  • In recent years, risks associated with mixed used development in urban regeneration projects which have actively been implemented have been on the rise due to uncertainties and complexities of those projects. Thus, risk management is needed to effectively manage those risks that may occur during the process of a project. Many studies have contributed to deal with risk management of those projects. These studies, however, have focused main on identification stage and deriving the main risk factors and have limitations on presenting the relationship among those risk factors. Since many risks are interdependent and have multiple effects, the purpose of this study is to present a way(ISM method) to provide a hierarchical structural framework of risks in Urban Regeneration. The structural of risks can helps decision makers to trace the actual source of these risks.

  • PDF