DOI QR코드

DOI QR Code

A Study on the Entry Strategies of Small and Medium Sized Landscape Contractors to Vietnam by Risk Analysis in Overseas Projects

해외사업 리스크 분석을 통한 중소 조경건설업체의 베트남 진출전략에 관한 연구

  • Tae, Jongwook (Dept. of Environmental Science and Ecological Engineering, Graduate School, Korea University) ;
  • Jeong, Daeyoung (Division of Environmental Science and Ecological Engineering, Korea University) ;
  • Hwang, Joon (Research Institute, ANSAN Landscape Architecture Co., Ltd) ;
  • Chon, Jinhyung (Division of Environmental Science and Ecological Engineering, Korea University)
  • 태종욱 (고려대학교 대학원 환경생태공학과) ;
  • 정대영 (고려대학교 환경생태공학부) ;
  • 황준 (안산조경개발(주) 부설연구원) ;
  • 전진형 (고려대학교 환경생태공학부)
  • Received : 2018.06.21
  • Accepted : 2018.11.01
  • Published : 2018.12.31

Abstract

The decline in the construction industry has led to a decrease the profitability of small and medium-sized landscape contractors. To relieve this situation, small and medium-sized landscape contractors have continued to proactively find ways to enter global construction markets. However, many small and medium-sized landscape contractors face risks due to their lack of capacity and insufficient preparations to extend the business abroad. Thus, this study aims to analyze the current condition of the Vietnamese construction market and the related risk factors. It then suggests strategies to improve the small and medium-sized landscape contractors' competitiveness in that market. We investigated the business climate and analyzed risk factors. Finally, we developed expansion strategies and conducted in-depth interviews with six overseas construction professionals. The study results first showed that efforts to improve infrastructure and the increased demand for housing in Vietnam will lead to more opportunities for small and medium-sized landscape contractors entering the Vietnamese construction market. However, changes in the Vietnamese business climate may act as a variable. Second, we found that small and medium-sized landscape contractors' risk factors are mainly related to laws and regulations, government finance, market fluctuations, public administration system, minimum wage increases, financing and bonds, contracting, trees and materials, and design errors. Finally, small and medium-sized landscape contractors are required to consider the following when seeking to enter the Vietnamese construction market: short-term strategy and mid-to-long-term strategy. This study will be used as the basis for small and medium-sized landscape contractors to plan to enter the Vietnamese construction market and to contribute to the expansion of the global construction market in the landscape industry.

국내 건설경기 침체로 조경건설업체의 수익성이 저하되면서 이를 극복할 수 있는 대안이 요구되고 있으며, 조경분야에서는 해외건설시장 진출을 적극적으로 추진하고 있다. 하지만 중소 조경건설업체들은 해외진출을 위한 내부 역량과 사전 준비가 미흡하여 다양한 리스크에 직면하고 있는 실정이다. 이에 본 연구에서는 성장잠재력이 높은 베트남 건설시장을 대상으로 진출환경 및 리스크 요인을 분석하고, 중소 조경건설업체의 수주경쟁력 향상을 위한 대응방안을 마련하고자 하였다. 본 연구는 해외건설 전문가 6명을 대상으로 심층인터뷰를 수행하였으며, 베트남 진출환경 및 리스크 요인을 도출하고, 이에 대응할 수 있는 진출전략을 제시하였다. 연구결과, 첫째, 베트남은 인프라 및 주택 수요 증가에 따른 조경분야 진출기회가 확대될 것으로 예상되지만, 베트남의 사업 환경의 변화는 중소 조경건설업체의 진출가능성에 변수가 될 것으로 보인다. 둘째, 중소 조경건설업체의 베트남 진출 리스크 요인은 법과 규정, 정부재정상태, 시장변동, 행정체계, 최저임금 상승, 자금조달 및 보증, 계약, 수목 및 자재, 설계오류로 도출하였다. 셋째, 중소 조경건설업체의 베트남 진출전략은 단기 전략과 중장기 전략으로 제시되었다. 본 연구의 결과는 중소 조경건설업체의 베트남 진출을 위한 기초자료로 활용될 수 있으며, 향후 조경분야의 해외진출 활성화에 기여할 수 있다는 점에서 의의가 있다.

Keywords

References

  1. An, B. H., J. E. Kim and Y. S. Kim(2013) The analysis of the weights of country risk by participants of overseas construction projects. Korean Journal of Construction Engineering and Management 14(2): 150-159. https://doi.org/10.6106/KJCEM.2013.14.2.150
  2. Baloi, D. and A. D. Price(2003) Modelling global risk factors affecting construction cost performance. International Journal of Project Management 21(4): 261-269. https://doi.org/10.1016/S0263-7863(02)00017-0
  3. Business Monitor International(2017) Vietnam infrastructure report executive summary. Research Report to Business Monitor International.
  4. Cho, J. G., S. An, Y. J. Kim and C. H. Park(2015) Foreign construction engineering information system design and platform development by focus country. Research Report to Korea Institute of Civil Engineering and Building Technology.
  5. Eom, J. H., S. H. Son and K. W. Gwun(2016) Country risk management for construction projects in emerging countries. Research Report to Korea Institute for International Economic Policy.
  6. Han, S. H. and D. Y. Kim(2006) Risk-based profit prediction model for international construction projects. Journal of the Korean Society of Civil Engineers 26(4D): 635-647.
  7. International Contractors Association of Korea(2005) Establishment of risk management system to improve productivity and profitability of overseas construction and development of web-based practical Guidebook. Research Report to Ministry of Land, Infrastructure and Transport.
  8. International Contractors Association of Korea(2012) International construction practice guide. Research Report to International Contractors Association of Korea.
  9. Jeong, D. Y., S. J. Hong, S. Y. Kang and Y. T. Kim(2017) An analysis of the legal environment of PPP in South-East Asia: Focused on Vietnam and Indonesia. GRI Review 19(1): 91-111.
  10. Jung, D. U. and I. H. Yu(2017) Mid-long-term strategy for promoting overseas of supporting professional construction contractor. Research Report to Korea Research Institute for Construction Policy.
  11. Kim, M. H(2016) Focus: Potential risk factors for overseas construction projects management guideline. Research Report to Construction Economy Reserch Institute of Korea.
  12. Kim, Y. J(1992). Review: A study on the countermeasure of a landscape architecture industry on the internationalization. Journal of the Korean Institute of Landscape Architecture 20(3): 114-117.
  13. Kim, Y. T., M. H. Han, H. Park, S. Lee, H. J. Kim, J. Park and D. Y. Jeong(2017) New strategy map on international construction market. Research Report to Ministry of Land, Infrastructure and Transport.
  14. Koreaexim Bank(2017) 2017 International country report. Research Report to Koreaexim Bank.
  15. Lee, H. C., G. Lee, S. G. Yeo and S. S. Ko(2009). A study on the risk evaluation of construction management based on risk identification. Korea Journal of Construction Engineering and Management 10(3): 82-91.
  16. Lee, S. B., J. W. An, S. H. Lee, J. H. Cho, J. C. Cho, G. R. Kim, J. Y. Kim, C. G. Park and D. H. Lee(2016) Improvement measures for the construction industry user in response to the changes in the construction market. Research Report to Korea Research Institute for Human Settlements.
  17. Lee, S. S.(2008) A study on changes of ready constructed record in landscape construction industry. Journal of the Korean Institute of Landscape Architecture 36(2): 99-112.
  18. Wang, S. Q., R. L. Tiong, S. K. Ting and D. Ashley(2000) Evaluation and management of political risks in China's BOT projects. Journal of Construction Engineering and Management 126(3): 242-250. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:3(242)
  19. Zhi, H.(1995) Risk management for overseas construction projects. International Journal of Project Management 13(4): 231-237. https://doi.org/10.1016/0263-7863(95)00015-I
  20. http://www.cak.or.kr/
  21. http://www.klaf.or.kr/
  22. http://www.icak.or.kr/
  23. http://www.kosca.or.kr/
  24. https://www.transparency.org