• Title/Summary/Keyword: 리모델링 기법

Search Result 54, Processing Time 0.037 seconds

Design Checklist for Improving Building Maintenance (건축물 유지관리성능 향상을 위한 설계 Checklist)

  • Baeck Ha-Kyu;Kim Seung-Jin;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.111-119
    • /
    • 2005
  • The degree to which the design of a building embraces maintenance considerations has a great impact on its performance. Modern buildings are designed to meet higher building standards than in previous times. As the result, the influence of design on the maintenance of buildings is greater than ever before. The issue of building maintenance is a universal one and its consideration at the design stage is of great importance on the future performance of the building. Even though many studies have conducted to improve building performance, almost all of the results of those studies have not been utilized effectively during design. The purpose of this paper is to suggest a checklist which could be used for incorporating building maintenance concept in the design. The suggested checklist was made by reviewing previous studies and then refined through consulting with professionals of relevant fields.

The Development of a Model for Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot (지하주차장 리모델링 공사시 주동진입방법 선정 모델 개발)

  • Song, Nak-Hyun;Jung, In-Su;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.65-74
    • /
    • 2009
  • It is expected that the number of apartment complexes in Korea that are over 20 years old will rapidly increase to more than 3,500,000. Consequently, the remodeling of these buildings is being revitalized throughout the country. Among the requirements for such remodeling, the expansion of parking lots has considerable weight. When enlarging a parking lot, the access route from an underground floor to the main building (i.e., the means of entry into the main building) determines the possibility of vertical enlargement for elevators, the size of the parking lot, the construction period, and construction expenses, etc. When enlarging an underground parking lot of an apartment complex, the access between the main building and the parking lot, as well as the inhabitants' requirements for entering the main building, are generally determined based on the designer's experience, rather than on the exact estimation of the peculiarity of the complex. In order to resolve such a problem, when enlarging an underground parking lot, a systematic and rational method is needed for selecting the means of entry into the main building. In this study, a selection model is derived for the method of selecting an access route into the main building when constructing an underground parking lot, in order to provide a reasonable decision-making process. A research method was investigated for determining the access route into the main building when enlarging a parking lot. On the basis of research carried out through in-depth interviews with experts, the characteristics for each means of entry into the main building were analyzed and the factors affecting the selection of the access route were deduced. The affecting factors selected were construction efficiency, convenience efficiency and economic efficiency. Weight values were then estimated for the selected affecting factors by applying the AHP method. Results showed that convenience efficiency, which gained the highest value, is the most important factor in selecting the means of entry into the main building. The most suitable means of entry into the main building was also suggested after estimating the applicability of the site by selecting complexes with remodeling possibility. This study will be applied as a reference for selecting the means of entry into the main building when constructing an underground parking lot particularly for older apartment complexes.

Organizational Program Management of Multiple Maintenance Projects Under Fund Constraints (복수 개${\cdot}$보수 프로젝트의 자금제약하 프로그램 관리 - 자원제약 마스터-일정계획을 중심으로 -)

  • Koo Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.211-218
    • /
    • 2004
  • In a large owner organization, a program manager of multiple maintenance and remodeling projects has experienced increasing scale and complexity of coordinating the M/R projects with in-house technicians who belong to multiple trade shops. This paper proposes a dual-level hierarchical planning strategy that consists of a program master plan in the long-term horizon and a master construction schedule in an operational scheduling window. A rolling horizon approach to the program master plan is proposed to deal with the external uncertainty of unknown stream of project requests. A resource-constrained scheduling algorithm is developed to generate the master construction schedule in a scheduling window. During development of the algorithm, more emphasis is placed on long-term organizational resource continuity, especially flow management of program constraint resources, than ephemeral events of an individual activity and project. Monte Carlo simulation experiments of three scheduling windows are used to evaluate the relative performance of the proposed scheduling algorithm against three popular scheduling heuristics for resource-constrained multiple projects.

A Design Method of Tensegrity Units for Renovation Elements (리모델링 부재 적용을 위한 텐세그리티 유닛 설계기법)

  • Lee, Seung-Hye;Lee, Jaehong;Jung, Sung-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.17 no.4
    • /
    • pp.141-148
    • /
    • 2017
  • In this study, an advanced form-finding method of tensegrity unit modules is presented to apply on renovation building. Here a fitness function of maximum natural frequency which can lead to a maximum stiffness status was used for a genetic algorithm. To apply the lightweight pin-jointed structure to the renovation project is more economical over to build new structures. In this paper, two types of tensegrity unit are presented to build expanded structures, and their force densities are shown using the proposed form-finding method. The expanded structures which may influence renovation projects are presented by using the tensegrity units.

A Study on Periodic Buffer Allocation for Program Master Schedule (프로그램 공정계획을 위한 주기적 버퍼 설치에 관한 고찰)

  • Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.81-87
    • /
    • 2001
  • In a dynamically changing environment, the manager of a maintenance and remodeling (M/R) program is confronted with an increasing complexity of coordinating and cooperating multi-resource constrained multiple projects. The root causes of the complexity, uncertainty and interdependence, cause an internal disruption of an activity and chain reactions of disturbance propagation that deteriorate the stability and manageability of the program. This paper evaluates previous endeavors to apply production control and management techniques to the construction industry, and investigates the possibility of applying other management concepts and theories to organizational program management. In particular, this paper proposes a buffer allocation model by which periodic buffers are allocated in the flows of program constraint resources to stabilize a program master schedule instead of protecting individual activities. Comparative experiments by Monte Carlo simulations illustrate improved performance of the proposed model in terms of program's goals: productivity, flexibility, and long-term stability.

  • PDF

Estimation of the Axial Stiffness of Reinforcing Piles in Vertical Extension Structures (수직증축 공동주택 하부 신설 보강말뚝의 축강성 산정)

  • Kim, Do-Hyun;Jeong, Sang-Seom;Cho, Hyun-Chul
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.12
    • /
    • pp.35-44
    • /
    • 2019
  • In this study, the axial stiffness of reinforcing piles (Kvr) for the vertical extension remodeling structures was estimated through 3D finite element analysis. In the computation of the minimum required axial stiffness of reinforcing piles, proposed maximum axial stiffness of old and deteriorated existing piles (Kve) based on theoretical and experimental approaches will be applied. Through this, the required increase rate of axial stiffness of reinforcing piles in order to support the increased structural loading was proposed for end-bearing and friction piles by different slenderness ratio (L/D). The numerical model was validated by comparing the computed results with actual field measurements. Based on the computed results, it was concluded that the end-bearing reinforcing pile needs 44% - 67% increase in axial stiffness to deal with the deterioration of existing piles and support the additional structural load due to vertical extension remodeling.

A Case Study on the Economic Analysis for an Advanced Technology-Based HYAC System Using LCC Technique (LCC 기법을 이용한 신기술 냉 $\cdot$ 난방 공조설비 시스템의 경제성 분석에 관한 사례연구)

  • Kim Yong-Su;Hwang Seong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.129-138
    • /
    • 2005
  • The purpose of this study is to assess economic effects for an advanced technology-based HVAC system. The study has been performed using LCC technique for the economic analysis. Data for LCC analysis are collected from estimation and interview of estimators and maintenance experts of buildings. Based on the LCC analysis, the economic effect of a new HVAC system has been predicted as follows : for the investment during 15 years of study period, (1) $21.6\%$ of LCC saving is predicted, (2) return rate for the investment is 4.8 times in case of new construction, and 14.4 times in case of building remodelling.

A Study of Broadband PLC Channel Modeling (광대역 PLC채널의 모델링 분석에 관한 연구)

  • Choi, Y.K.;Park, G.H.;Seo, J.W.;Cha, J.S.;Seo, H.S.;Sin, M.C.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.271-273
    • /
    • 2003
  • 최근에 전력선통신(PLC: power line communication)에 관한 연구 및 개발이 활성화되고 있는 가운데, 정부에서는 전력선통신을 위한 전송채널의 주파수허용범위를 기존의 협대역인 450kHz에서 광대역인 30MHz로 확대할 계획이다. 현재, PLC 시스템에서는 대용량정보를 고속으로 전송하기 위한 고속 PLC기술의 개발이 활발히 진행되어지고 있으며, 이러한 통신시스템 기술의 구현을 위해서는 새롭게 확대될 30MHz대역에서의 전력선채널의 분석이 무엇보다도 중요한 해결 과제라고 할 수가 있을 것이다. 전력선은 각종 전기기기와 가전제품 및 사무기기로부터 발생되는 잡음들이 직접 유입되며, 또한 부하가 전력선에 연결되는 시간과 공간에 따라 전송 특성이 수시로 가변하는 특성을 가진다. 이와 같은 열악한 전력선통신채널 환경을 극복하고 통신의 에러극복능력을 향상시키기 위해서는 기존의 협대역 채널모델을 그대로 적용하기에는 부적합한 면이 많으므로, 새롭게 허용될 광대역 주파수를 갖는 전력선 채널에 대한 모델링기법이 요구된다. 따라서, 새롭게 인가될 광대역 채널을 위한 효율적인 전력선통신시스템을 개발하기 위해서는 전력선채널의 리모델링에 근거한 다양하고 실험적인 고찰이 수반되어야 하리라고 판단된다. 그러므로, 본 논문에서는 Mixture 잡음 모델링기법을 이용하여, 부하변동 및 가변적인 잡음 특성을 가진 전력선채널모델을 새롭게 분석하였다. 또한, 새롭게 분석한 전력선채널모델에 관한 수식을 직교 코드에 의한 다중접속 통신 기술인 CDMA 방식에 적용하여 비트 에러율을 유도해 봄으로써 그 유효성을 확인하였다.

  • PDF

Verification of Train Overhaul Maintenance Allowances Based on Layout Using Simulation and BPR (시뮬레이션과 BPR을 응용한 Layout 기반의 철도차량기지 중정비 검수 여유율 검증)

  • Choi, Sung-Hwan;Hong, Yong-Ki;Lee, Hi-Sung;Kim, Seung-Whan
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.482-486
    • /
    • 2008
  • It has been built or remodeled in every year train maintenance centers including subways. However, there is no standard to measure exact capacity. In today, most of criteria is referenced on Japanese. In general, we can standardize the process for 'Train Overhaul Maintenance' because its processes are similar or same patterns. The processes can be the base standard of train maintenance after being classified in detail and validating it. This study is adapt BPR methodology to present standardizes processes and the processes are mapping to layout drawing to constraint from the real world, and then evaluate the capacity using simulation. To guarantee objectivity of input data, we use research data by the National Railroad Administration and Association of Japanese Railway Engineering. Using these data to simulation, we compare to the 'Allowances' and evaluate its adequacy.

  • PDF

Selection of Retaining Wall System for Underground Parking Lots Expansion of Apartments (거주중 공동주택의 지하주차장확대를 위한 흙막이공법 선정)

  • Ro, Young-Chang;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.99-107
    • /
    • 2008
  • Rapidly increasing automobile supply rate according to improved economic level of life makes lack of parking space of apartments. Even though the initial design of parking space compiled with old regulations, it may not observe either new laws or requirement of inhabitants. Even if old apartments have no structural durability problem, outworn facilities and insufficient parking area may be a main reason for reconstruction. It causes waste of national resources and makes recycling issues. Additionally, irregularly parked cars make traffic obstruction to a fire engine and result in many fire accident victims. Parking problems of apartments are not only inconvenience but also serious safety issues. From these points of view, remodeling only for parking area expansion is necessary to avoid overall reconstruction of apartments. The purpose of this study is to suggest a retaining wall selection method for apartments underground parking lots expansion without evacuation of resident people. Effect factors to select retaining wall system are analyzed and weight values are calculated by applying AHP. One selection method of retaining wall is proposed by evaluating applicability and its sensitivity analysis is executed. This selection method is expected to help decision-making of retaining wall system selection.