• Title/Summary/Keyword: 도선(道詵)

Search Result 517, Processing Time 0.032 seconds

Floor Vibration Analysis of Economic Steel (ES) Beam Using Field Measured Acceleration Responses (진동특성을 고려한 ES-빔 공법의 사용성능 평가)

  • Woo, Jong-Yeol;Park, Soo-Yong;Kim, Min-Jin;Hong, Seong-Wook;Doh, Sun-Boong;Choi, Tae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.83-84
    • /
    • 2011
  • This study provides floor vibration analysis for a factory constructed by ES-beam using field measured acceleration data. The natural frequencies of the first two modes of floor are extracted from measured data. With this information, a system identification has been performed to produce a numerical model representing existing floor. The peak magnitudes of acceleration for one man walking heel drop load from experiment and numerical model are analyzed using ISO vibration criteria and AIJ vibration performance criteria. The results show that there is no problem in use of ES-beam.

  • PDF

Pre-construction Simulation of Precast Bridge Piers and Quality Management using Augmented Reality (증강현실 기반의 프리캐스트 교각의 사전시공 시뮬레이션 및 시공성 정밀도 관리방안)

  • Park, Seong-Jun;Dang, Ngoc-Son;Yoon, Do-Sun;Lon, Sokanya;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.15-23
    • /
    • 2018
  • Geometry control of precast members is the most important technology for modular construction. In this paper, image-based modeling and rendering (IBMR) technology was adopted for 3D modeling of precast elements. It is necessary to use match-casting method for precast post-tensioned column assembly. Preassembly using 3D models created by image processing can minimize construction error. Augmented reality devices are used to check the geometry of the segment. Laboratory-scale tests were performed. The proposed process has been applied to the real precast bridge pier segments.

Analysis of Transient Response from Conducting Wire Scatterer and Antenna Using Integral Equation (적분 방정식을 이용한 도선 산란체 및 안테나의 과도응답 해석)

  • Jung, Baek-Ho;Seo, Jung-Hoon;Youn, Hee-Sang
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.51 no.11
    • /
    • pp.559-566
    • /
    • 2002
  • In this paper, we present an accurate and stable method for the solution of the transient electromagnetic response from the conducting wire structures using the time domain integral equation. By using an implicit scheme with the central finite difference approximation for the time domain electric field integral equation, we obtain the transient response from a wire scatterer illuminated by a plane wave and a conducting wire antenna with an impressed voltage source. Also, we consider a wire above a 3-dimensional conducting object. Numerical results are presented, which show the validity of the presented methodology, and compared with a conventional method using backward finite difference approximation.

The Installation Technique of Grounding Electrode Conductors for Metal Oxide Distribution Surge Arresters (배전용 피뢰기의 접지도선 설치기법)

  • Lee, B.H.;You, I.S.;Lee, T.R.;Ahn, C.H.;Youn, J.S.;Youn, H.H.;Kim, J.S.;Kim, J.C.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07c
    • /
    • pp.1718-1720
    • /
    • 2001
  • The route of surge arrester connection is very important because bends and kinds of leads increase the impedance to lightning surges and tend to nullify the effectiveness of a grounding electrode conductor. There is a need to know how effective installation of lightning surge arresters is made in order to control voltage and to absorb energy at high lightning currents. The effectiveness of a grounding conductor and bonding for 18[kV] metal oxide distribution line arresters was experimentally investigated with lightning and oscillating impulse voltages.

  • PDF

Method and implementation for reducing stand by power consumption in SMPS with low-speedy power line communication (저속 전력선통신 적용 전원공급장치의 대기전력 절감 방법 및 구현)

  • Kim, Ki-Hyun;Son, Do-Sun;Kim, Hyoung-Woo;Seo, Kil-Soo;Kim, Sang-Cheol
    • Proceedings of the IEEK Conference
    • /
    • 2008.06a
    • /
    • pp.1139-1140
    • /
    • 2008
  • This paper is designated to introduce the method of reducing stand-by Power of SMPS applied PLC(Power Line Communication) and its implementation. PLC modem consists mainly of PLC Module, Coupling Circuit, ZCP(Zero-Cross Point) Circuit and Power Supply Circuit. By controlling power from Power Supply Circuit to PLC Module and ZCP Circuit, the reduction of Stand-by Power is established. When this method is applied to SMPS used for a low-speed PLC, about 50% power reduction is provided, compared to the other case to which it is not applied.

  • PDF

Modeling Interconnect Wiring using the Partial Element Equivalent Circuit Approach in Time Domain (부분요소 등가회로를 이용한 시간영역에서의 인터커넥트 모델링 연구)

  • Park, Seol-Cheon;Yun, Seok-In;Won, Tae-Yeong
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.39 no.1
    • /
    • pp.67-75
    • /
    • 2002
  • In this Paper, we discuss the PEEC method and construct the PEEC equivalent circuit of the test structure and construct the system matrix, which was simulated by numerical analysis. And we got node voltages and currents. Constructing the equivalent circuit, we extracted the parasitic parameter(R, L, C)using the simulator, which is based on finite element method, hence we could simulate the transient analysis.

Research on construction and application of RIMS with "intelligent BOM" (RIMS "지능형 BOM" 구축과 활용에 관한 연구)

  • Park, Soo-Choong;Lee, Do-Sun;Choi, Kwang-Suk;Son, Yung-Gin;Kim, Myung-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1499-1504
    • /
    • 2007
  • This dissertation explains the construction of the expert system which can manage diagnosis and administration of trouble using circuit diagram through connection between BOM and ability term and makes up for problem which have designed RIMS with name of parts. Also this dissertation explains that existing BOM has no regard organic relation of parts and functional and systematic appearance of the flow of electricity or air. Construction of expert system and "Be enlivened BOM" with flowing electricity and air can solve problems about overlapping parts carrying out other functions with the same name of parts following to simple and physical BOM management and having mistaken trouble of the end caused by basis for trouble of the end.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.57-64
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.143-150
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

A Study about Guiding of Ships Through the Narrow Channels an(Near Waterside Structure (좁은 수로나 근접한 해안구조물에서의 선박 도선에 관한 연구)

  • Alexander Y Benilov
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2000.10a
    • /
    • pp.210-215
    • /
    • 2000
  • Presently, one or several tugboats guide a ship in the port or canal, during the ship's engines and steering mechanism kept idle. This method has insufficient ability keeping the ship on course, danger of collision with waterside structures, tugging preparation time consuming, as well as the need expending substantial resources to acquire and maintain tugboats and associated facilities. Therefore, a new technology and system for ship's guiding to be needed and introduced instead of traditional guiding and tugging system.

  • PDF