• Title/Summary/Keyword: 도로포장균열정보

Search Result 12, Processing Time 0.029 seconds

The Extacting Crack in Asphalt Concrete Pavement by Digital Image Processing (수치영상처리에 의한 아스팔트 포장노면의 균열 검출)

  • Jang, Ji-Won
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.10 no.4 s.22
    • /
    • pp.77-84
    • /
    • 2002
  • Recently, damage of pavement represented by crack is depened by the increase of traffic demand up to ten million and wight, and interest about the efficient management of pavement is being increased gradually according to the growth of maintenance expense of road surface. In this study, the possibility of application for acquisition of crack information was tested by appling DCRP and digital image processing technique and measuring crack on road surface precisely. Based on this, objective and efficient road surface measurement was planned and done. Measuring crack width, acquire result of comparative high accuracy. So, it is considered that it can be utilized as plan draft data for deterioration estimation and repair reinforcement work of pavement.

  • PDF

Extraction of Information on Road Surface Using Digital Video Camera (디지털 비디오카메라를 이용한 도로노면정보 추출)

  • Jang Ho Sik
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.1
    • /
    • pp.9-17
    • /
    • 2005
  • The objective of the study is to extract information about the road surfaces to be studied by analyzing asphalt concrete-paved road surface images photographed with a digital video camera. To analyze the accuracy of road surface information gained using a digital imagery processing method, it was compared and analyzed with the outcomes of control surveying. As a result, an average error of 0.0427 m in the X-axis direction, that of 0.0527 m in the Y-axis direction, and that of 0.1539 m in the Z-axis direction were found, good enough for mapping at a scale of 1:1,000 or less and GIS data. Besides, information on road surface assessment factors such as crack ratio, the amount of rutting and profile index was gained by analyzing processed digital imagery. This information made it possible to conduct road surface assessment by generating PSI and MCI. As quality digital image information has been gathered from roads and stored, important fundamental data on PMS (Pavement Management System) will become available in the future.

A Study of Improvement of Urban Pavement Maintenance Technique based on Pavement Condition Evaluation and FWD Data (도로포장 표면조사와 FWD정보에 기반한 도심지 도로포장 유지보수 기법 개선방안 연구)

  • Lee, Sangyum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.12
    • /
    • pp.532-541
    • /
    • 2016
  • The objective of this paper is to support accurate pavement condition assessment and decision of proper maintenance method and time by conducting visual inspection and calculating the remaining life of pavement from falling weight deflectometer(FWD) data. Each was implemented in the same long-term performance pavement(LTPP) sections. Visual inspection was executed to measure pavement condition indices such as crack, rutting and international roughness index(IRI) and the Seoul Pavement Index(SPI) was calculated based on these results. The dynamic modulus was back-calculated from the FWD data. The remaining pavement lives were determined from equivalent single axle loading(ESAL) and FWD data. Correlation of maintenance priority by each result value was examined. Consequently, the correlation between remaining life to Crack and Rutting was higher than the other factors or indicesbecause IRI is not related to FWD value and SPI value consists with IRI value and other indices. The R-square value of correlation of FWD with Crack and Rutting was 0.65, which indicated an insufficient correlation. Consequently, when decision of maintenance of method, time, etc. is determined, FWD data have to be considered with Crack and Rutting because of those relations.

Characteristics of Asphalt Pavement Images and Enhanced Algorithm for Noise Reduction (이미지프로세싱기법을 이용한 포장이미지의 특성과 노이즈제거를 위한 알고리즘 선정)

  • Kim, Jung-Yong;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.3 no.4 s.10
    • /
    • pp.137-146
    • /
    • 2001
  • Pavement distresses are one of the most important data for pavement management systems. Inspection machines and its related programs have been used for operating tools in PMS developed in advanced countries. In Korea imported machines and programs for the length price ale utilized to get information of pavement condition from the field This study is launched for developing the program which can detect cracks on asphalt pavement due to many drawbacks in current PMS operation such as improper maintenance work and long resting period when it was broken. The focus of this study is to define principles to analyze pavement surface with digital image processing techniques, to test property of pavement images and to suggest an algorithm that reduces noises at test. To test images, the camera attached on the Automatic Road Analyser(ARAN) was used. Through the FFT images, histogram and statistical values of pavement images, it was found that the images had many noises with high-frequency components against general images, and it was difficult to subdivide pavement images into background or crack. Through several testing with various filters for noise reduction a 3X3 median filter was suggested to reduce noises effectively.

  • PDF

Development of Road Surface Management System using Digital Imagery (수치영상을 이용한 도로 노면관리시스템 개발)

  • Seo, Dong-Ju
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.1
    • /
    • pp.35-46
    • /
    • 2007
  • In the study digital imagery was used to examine asphalt concrete pavements. With digitally mastered-image information that was filmed with a video camera fixed on a car travelling on road at a consistent speed, a road surface management system that can gain road surface information (Crack, Rutting, IRI) was developed using an object-oriented language "Delphi". This system was designed to improve visualized effects by animations and graphs. After analyzing the accuracy of 3-D coordinates of road surfaces that were decided using multiple image orientation and bundle adjustment method, the average of standard errors turned out to be 0.0427m in the X direction, 0.0527m in the Y direction and 0.1539m in the Z direction. As a result, it was found to be good enough to be put to practical use for maps drawn on scales below 1/1000, which are currently producted and used in our country, and GIS data. According to the analysis of the accuracy in crack width on 12 spots using a digital video camera, the standard error was found to be ${\pm}0.256mm$, which is considered as high precision. In order to get information on rutting, the physically measured cross sections of 4 spots were compared with cross sections generated from digital images. Even though a maximum error turned out to be 10.88mm, its practicality is found in work efficiency.

  • PDF

Stochastic Disaggregation and Aggregation of Localized Uncertainty in Pavement Deterioration Process (포장파손과정의 지역적 불확실성에 대한 확률적 분해와 조합)

  • Han, Daeseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1651-1664
    • /
    • 2013
  • Precise analysis on deterioration processes of road pavements is not so simple matter due to severe uncertainty originated from a lot of explanatory variables engaged in. For those reasons, most analytical models for pavement deterioration prediction have often preferred to probabilistic approaches than deterministic models. However, the general probabilistic approaches that treat overall characteristics of population or entire sample would not be suitable for providing detail or localized information on their changing process. Considering the aspects, this paper aimed to suggest a stochastic disaggregation method to analyze the localized deterioration speeds and its variances changed by time and condition states. In addition, life expectancies and their uncertainty were estimated by probabilistic algorithm using the disaggregated stochastic process. For an empirical study, pavement inspection data (crack) accumulated from 2003 to 2010 from Korean national highway network was applied. This study can contribute to securing reliability of life cycle cost analysis, which is one of the primary analyses in road asset management, with much advanced deterioration forecasting functions. In addition, it would be meaningful trials as fundamental research for preventive maintenance strategy that demands essential understanding on changing process of the deterioration speed of pavement.

An Evaluation of Field Performance of Environmentally Friendly Asphalt Pavement (친환경 아스팔트 도로포장의 현장 공용성 분석)

  • Kim, Nakseok
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.22-29
    • /
    • 2013
  • Warm mix asphalt(WMA), which is produced at lower temperatures than hot mix asphalt, has advantages in reductions of fuel consumption and greenhouse-gas emission. In this study, field tests such as skid resistance, rutting(permanent deformation), and roughness were conducted for analysis of long-term field performance of modified warm mix asphalt pavement. Skid resistance after 20 months represents the result similar to initial performance results but rutting and roughness decreased somewhat depending on the period of performance. Measurement results of permanent deformation and roughness could be acceptable because measured pavement location is bus lane that a lot of buses pass and stop. There were no cracks after 11 months, but some minor cracks were observed after 20 months. These results were influenced by increased crack resistance due to fiber addition.

Selection of Long-Term Pavement Performance Sections for Development of Distress Prediction Model in National Asphalt Pavement (국도 아스팔트 포장 파손예측모델 개발을 위한 장기 관측 구간 선정에 관한 연구)

  • Kwon, Soo-Ahn;Yoo, Pyeong-Joon;Kim, Ki-Hyun;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.4 no.1 s.11
    • /
    • pp.123-134
    • /
    • 2002
  • Special pavement test sections were selected to develop a distress prediction model on asphalt pavement of National Highway. Experimental design was conducted for the selection of LTPP sections on in-service pavement(new and overlaid pavement) using several variables affecting pavement performance. Preliminary sections that satisfied the design template were chosen from the national highway database, and final selection was fixed through field inspection. The number of monitoring section is 95 including 47 overlaid pavement. A pavement distress data such as crack and rutting were collected for two years. An interim pavement performance analysis was peformed to show feasibility of performance monitoring program. Data related pavement such as traffic, weather, material characteristic and crack etc. should be collected for next project years and distress prediction model will be developed through the statistical analysis.

  • PDF

Detecting Pothole using by Wavelet and Superpixel (웨이블릿과 슈퍼픽셀을 이용한 포트홀 탐지)

  • Lee, SungWon;An, KwangEun;Jo, Young-Tae;Seo, Dongmahn
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2017.04a
    • /
    • pp.976-978
    • /
    • 2017
  • 포장 도로의 균열 또는 유실에 따라 발생하는 포트홀은 환경 변화에 따라 지속적으로 발생하며 이로 인한 교통사고도 지속적으로 발생한다. 포트홀 탐지를 위해 크게 3가지 방법들이 시도되고 있다. 그 중 이미지 처리를 이용한다. 포트홀은 내부에 깊이가 있으며 거친 질감을 가진다. 이러한 특성을 이용하여 포트홀을 탐지한다.

A Study on the Performance of Recycled Asphalt Pavement using Hot Recycling Plant (재생 아스팔트 포장의 공용성능 연구)

  • Kim, In-Soo;Suh, Young-Chan
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.2
    • /
    • pp.112-118
    • /
    • 2011
  • The recycled asphalt concrete has gotten increasing attention due to the environmental issues. The volume of reclaimed asphalt has increased significantly for last few years because of city remodeling, pavement maintenance, utility excavation, and road widening. Considering the value of reclaimed asphalt, it is rather used for the recycled asphalt concrete than it is used for fill and cover up material instead of soil. This research will be a supplements incomplete issues from existing research results and suggests the quality control guideline for recycled asphalt concrete and upcoming laws. As the first step of research, the trial construction of RAP(Recycled Asphalt Pavement) performed in expressway construction sites. These trial construction sites have been checked every years. And another construction sites studied and selected for more deeper performance check of RAP. For this checks, we used automatic pavement survey equipment and computerized analysis tools. Also, DSR(Dynamic Shear Rheometer) was used for the fatigue life calculation of binder blends(RAP and virgin binder). As a consequence of this research, the application of recycled asphalt provides good enough quality for highway construction. The preceeding literatures reviewed shows that the asphalt rejuvenator are used in many countries but that type of chemical agent are not used in Korea. By using the data of trial construction and mix design in Chongwon-Sangju construction lane, the surface and base courses consisted with the 10% and 30% rap mix asphalt section maintains good performance for up to 7 years. Through the performance check and laboratory tests(DSR), the quality control and mixture's low temperature prevention are the important factor and chemical agent necessary for increasing the fatigue life of RAP binder.

  • PDF