• Title/Summary/Keyword: 대안의 수

Search Result 5,434, Processing Time 0.037 seconds

Conceptual Models for Evaluation of Urban Logistics Improvement (도시물류 개선 대안 평가를 위한 개념적 모형 정립)

  • 허윤수;남기찬;윤항묵
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.5
    • /
    • pp.7-18
    • /
    • 2001
  • This study is concerned with theoretical aspects of urban logistics with the aim of revealing limitations of the literature, suggesting directions for further studies and developing a conceptual model for evaluating policy alternatives. Several limitations have been revealed and, based on these, the directions for further studies were suggested as more effort needs to be put on microscopic aspects of urban logistics ; and integrated conceptual evaluation models need to be developed. For the models it defined microscopic evaluation factors by the subject of urban logistics activities, and with these factors it established a conceptual model. Especially it introduced the simulation models developed recently to predict the route of freight vehicles and suggested how both microscopic and macroscopic aspects of urban logistics could be evaluated.

  • PDF

The Economic Analysis on Traffic Safety Facility along the Inland Waterway Using Probabilistic Simulation -Focusing on the section between Phnom Penh and Chong Kneas port in Cambodia- (확률론적 시뮬레이션을 이용한 내륙수로 교통안전시설의 경제성 분석 -캄보디아의 프롬펜과 총크니아스항 구간을 대상으로-)

  • Kim, Jung-Hoon
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.4
    • /
    • pp.165-182
    • /
    • 2009
  • This study analyzed the economic analysis on the Cambodian inland waterway from Phnom Penh to Chong Kneas. The social discount rate of 3.5% was applied for the cost and benefit of projects and converted to the current values in 2009. The benefits were supposed as the triangle distribution with minimum, mode, and maximum value corresponding to pessimistic, moderate and optimistic prospect separately. And the distributions of costs were the normal. As the result of probabilistic simulations, the average of B/C for scenario A showed relatively the highest with 0.25 and its 90% confidence interval 0.16~0.35. The average B/C of scenario B is 0.10 with the 90% confidence interval 0.06~0.13 and the one of scenario C is 0.15 with 90% confidence interval 0.12~0.19. Therefore it was concluded as low economic feasibility to install inland waterway aids to navigation along the surveyed waterway. However, the performance of the project should be determined by its political analysis as well as the economic.

  • PDF

Re-evaluation of comprehensive flood management plan for the Yeongsan river basin using Robust Decision Making (로버스트 의사결정을 이용한 영산강유역 종합치수계획 재평가)

  • Kang, Dong-Heon;Kim, Young-Oh;Park, Junehyeong
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.2
    • /
    • pp.99-109
    • /
    • 2017
  • This research adopted a Robust Decision Making framework to re-evaluate four alternative strategies proposed by the Comprehensive Flood Management Plan for the Yeongsan River Basin report (MLTM, 2005) considering uncertainties of future floods under condition of climate change. To reflect the uncertainties, multiple sets of future flood scenarios were used with three uncertainty factors: the change in rainfall intensity based on the RCP climate change scenarios and the changes in the temporal and the spatial flood distributions. With combinations of these factors, 216 plausible flood scenario sets were generated and the performances of the four alternatives under different future states were evaluated. From the results, the most robust alternative among the strategies was identified. Moreover, the key factors which made the tested alternatives poor were discovered through assessment of the uncertainty factors. This information can provide detailed insights to decision makers and can be utilized to overcome alternatives' potential vulnerabilities by modifying the strategy to be more robust.

Determination of Appropriate Flood Reduction Alternatives for Climate Change Adaptation in Gyeongan Watershed (기후변화 적응을 위한 경안천 유역의 적정 홍수저감 대안 선정)

  • Han, Dae-Gun;Choi, Chang-Hyun;Jang, Hong-Suk;Choi, Young-Joo;Kim, Duck-Hwan;Kim, Hung-Soo
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2015.11a
    • /
    • pp.287-289
    • /
    • 2015
  • 최근 기후변화로 인하여 태풍 및 집중호우로 인한 극한 강우사상의 발생빈도가 증가하고 있으며, 급격한 도시화로 인한 유역 내 불 투수 면적이 늘어나고 있다. 이로 인해 재산피해가 증가하고 있어 기후 변화를 고려한 미래 하천범람 등 홍수피해를 경감시키기 위한 홍수저감 대안 선정이 필요하다. 따라서 본 연구에서는 기후변화를 고려하여 목표기간별로(기준년도 : 1971~2010년, 목표기간 I : 2011~2040년, 목표기간 II : 2041~2070년, 목표기간 III : 2071~2100년) HEC-HMS모형을 이용하여 기후변화에 따른 홍수량을 산정하였다. 또한, 배수펌프(A~E)와 저류지(A~E)를 홍수저감 대안으로 설정하여 HEC-RAS모형을 통해 대안별 홍수위를 산정하였다. 지형자료 및 홍수위를 이용하여 홍수범람도를 도시하였으며, 다차원 홍수피해액산정법(Multi dimension - Flood Damage Analysis, MD-FDA)을 이용하여 홍수피해 저감을 위한 대안별 경제성분석을 실시하였다. 홍수저감효과를 분석한 결과 배수펌프를 설치했을 경우 홍수위는 최소0.06m, 최대0.44m 감소하였고, 저류지는 최소0.01m, 최대1.86m 감소하였으며, 침수면적은 최소 0.3%, 최대 32.64% 감소되는 것을 확인할 수 있었다. 또한, 경제성분석을 실시하여 대안별 편익 비용비를 비교한 결과 목표기간I에서는 저류지 E, 목표기간II, 목표기간III에서는 배수펌프D가 기후변화를 적응을 위해 타당한 홍수저감 대안으로 판단되었다.

  • PDF

대학등록금 인상 문제, 그 원인과 해결방안

  • Park, Geo-Yong
    • 대학교육
    • /
    • s.141
    • /
    • pp.14-22
    • /
    • 2006
  • 등록금 인상 문제를 둘러싼 갈등이 지속되고 있는 올해 각 정당과 교육단체들은 등록금 인상에 대한 정책적 대안을 제시하고 있다. 반복되는 등록금 인상의 악순환을 근절시키기 위해서는 보다 구체적이고 현실적인 대안이 요구된다. 우선 우리 정부와 국회에서 등록금 인상 억제방안의 입법화를 추진할 수 있어야 한다. 이와 함께 정부차원에서 교육예산 확보를 위한 구체적 방안을 수립해야 한다. 그리고 사학의 예·결산을 산출근거까지 상세히 공개하여 학교당국과 학생들 간에 상호 신뢰감을 든든히 해야 한다.

  • PDF

Planning of Alternative Forest Road Network Using GIS (GIS를 이용한 대안별 임도노망의 계획에 관한 연구)

  • Jeon, Kwon-Seok
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.11 no.1 s.24
    • /
    • pp.21-28
    • /
    • 2003
  • This study was aimed at suggest a proper planning method to select a optimal forest road network in mountains forest using GIS(Geographic Information System). To examine the field applicability, the method was applied to the National Forest at Mt. Kumsan in Namhae-gun, Gyungsangnam-do. The main results from altogether six alternative road route plans were derived from these criteria obtained the alternative route plan No.2 has two layout criteria, longitudinal gradient and earth work volume, and it showed similar pattern of existing forest road network which was designed mainly ground slope and longitudinal gradient. The alternative route plan No.6 has four criteria, longitudinal gradient, earth work volume, investment effect and landscape impact. It was different for the lowest forest road density among the alternatives and the pattern of the forest road layout was radial form, which was also quite different to other alternatives. For optimal forest road network planning, GIS provide the efficient and resonable solutions for decision making to provide the support for evaluation about various alternative road networks. If detailed inventory and relevant data are provided and also clear and objective indicators for evaluations are set up, it could be applied to preliminary analysis and detail planning stage to prevent undesirable effect such the land slide and soil erosion due to inadequate planning for forest road network.

  • PDF

Application of the 3D CAD Model Data for 4D Simulation and Quantity Estimation (4D 시뮬레이션 및 일정별 물량정보검색을 위한 3D 모델 정보 활용)

  • Lee Jae-Cheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.107-114
    • /
    • 2004
  • This paper represents the application of the 3D CAD Model data for 4D simulation and quantity estimation. These support the effective and practical use of 4D CAD model. By using and manipulating the 3D CAD model information, scheduling and quantity estimation could be developed more quickly and effectively. So the 3D CAD model information is made use of not only drawing a blueprint but also playing an important part of data integration platform. The scheduling module sets up the schedule generation logic that consists of period, priority of element arrangement, and time lag of floor placement. It sorts the working items as a priority of working process. And the quantity estimation module queries the material quantity of the structural elements according to the scheduling conditions. These two modules are developed using the 3D CAD model information and assist the function of 4D CAD model.

A Study on Control of Traffic Network Signal Control using Analytic Hierachy Process (계층분석법을 이용한 교차로망의 신호 제어)

  • Jin, Hyun-Soo
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2007.04a
    • /
    • pp.421-428
    • /
    • 2007
  • This paper discusses a fitness of the control on intersection network using fuzzy analytic hierachy process. The validity of control of traffic signal on intersection is phase, cycle of intersection. But the aigent of traffic intersection network is relative of intersection article. Therefor the aigent of traffic network intersection is before intersection passing vechile number, delayed vechile number. Fuzzy analytic hierachy process clears the grade of validity of the fixed cycle time controller and adaptive fixed cycle time and fuzzy traffic controller and proposes a new control type a traffic signal by this fuzzy analytic hierachy process.

  • PDF

The Risk Evaluation on Water Supply Networks using PROMETHEE (PROMETHEE를 이용한 상수도관망시스템의 위험도 평가)

  • Hong Sungjun;Kim Sheung-Kown;Kim Jooghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1307-1311
    • /
    • 2005
  • 최근들어 Water Security에 대한 관심이 고조되고 있지만 국내의 경우 이에 대한 체계적인 연구가 아직 진행되지 않았고 상수도관망시스템의 오염예방 및 위험관리에 대한 연구는 매우 미비한 실정이며 특히 상수도관망시스템의 위험성 및 취약성에 대한 연구는 전무한 상태이다. 이러한 상수도관망시스템의 위험도와 관련된 여러 위험요소들은 인명의 피해, 재산상의 피해, 환경적 피해, 시스템의 피해 그리고 사회적 불안등 여러 기준을 고려하여 평가되어야 한다. 이 문제는 다기준의사결정(multi-criteria decision making)문제로서 평가기준들(criteria) 간의 상충관계(trade-off)로 인하여 판단이 모호한 대안들을 PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) 기법을 이용하여 평가하였다. PROMETHEE는 선호의 유출량(leaving flow)과 유입량(entering flow)의 개념을 이용하여 여러 대안들의 순위선호(outranking)를 산정하는 기법으로, 의사결정자(decision matter)가 비교적 쉽게 이해할 수 있으며 기존의 AHP$\cdot$ANP와는 달리 명확한 판단이 어려운 대안들에 대해서는 비교불가능한(incomparable) 대안으로 분류한다. 이와 같은 위험도 평가결과는 위기상황에 대한 대처방안을 제시할 의사결정시스템 구축의 기초 자료가 될 수 있을 것이다.

  • PDF

통신시설투자 적정규모 산정에 관한 연구

  • 남규택;이보상;홍경권
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1992.04b
    • /
    • pp.63-72
    • /
    • 1992
  • 본 연구의 목적은 교환기 및 가입자 선로에 대한 투자계획의 수립 즉 적정수준의 공급주기와 공급량을 산정하는 방안을 모색해 보는 것이다. 이와 같은 연구를 수행하기 위하여 우선 한국통신의 공급계획수립업무에 대한 현황파악과 함께 한국통신의 공급계획수립에 적용할 수 있는 이론적 모형을 다각도로 검토해 보았다. 그 결과 재고모형이 가장 적합하다고 판단되어 재고모형의 여러 대안을 현행 공급계획수립방법과 비교하여 공급주기와 총비용을 비교분석하였다. 본 연구에서는 Economic Order Quantity(EOQ)모형, Dynamic Lot Size(DLS)모형, 그리고 Simulation이 분석의 도구로 사용되었으며, Simulation은 두가지 방법을 적용하였다. 첫번째 방법은 개별 전화국을 대상으로 simulation을 실시하여 최소의 비용을 보이는 공급주기를 각 전화국별로 산정하는 것이며, 두번째 방법은 모든 전화국에 동일한 공급주기를 적용하여 개별 전화국에서 발생하는 비용의 총합계가 최소화되는 공급주기를 산정하는 것이다. 각 대안별로 공급주기와 총비용을 산정해 본 결과 교환기의 경우는 총비용면에서 현행방법과 본 연구에서 제안한 대안들간에 커다란 차이는 없었으나, 모든 전화국에 동일한 공급주기를 일률적으로 적용시키는 것보다 각 전화국의 수요증가형태에 맞는 공급주기를 별도로 산정하여 적용시키는 것이 보다 경제적이었다. 한편, 가입자선로의 경우는 본 연구에서 제시한 대안들이 현행방법에 비해 연간 수백억원에 이르는 투자지출을 절감 할 수 있음을 보였다.

  • PDF