A Study on Application of Kuz-Ram model to Domestic Open-pit Limestone Mine (국내 석회석 노천광산에 대한 Kuz-Ram 모델의 적용성에 관한 연구)

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Jin, Yeon-Ho;Jung, Min-Su;Min, Hyung-Dong
    • Tunnel and Underground Space
    • /
    • v.26 no.2
    • /
    • pp.120-130
    • /
    • 2016
  • Considering the applicability of Kuz-Ram model, which has been used extensively for predicting rock fragmentation size distribution by blasting, to domestic open-pit limestone mine, a total of 21 blasting tests have been executed at an open-pit limestone mine in eastern Gangwon of South Korea. A comparative analysis of field measured value and Kuz-Ram predicted value showed that there are a considerable amount of error in the predicted values regardless of application of various correction parameters for rock factor and uniformity factor; up to 56.45% in mean fragmentation size and 37.52% in uniformity index. Also the problem of applying different correction parameters has been derived even though a similar blasting pattern has been adopted for a same blasting bench. The authors therefore suggest that Kuz-Ram model needs to be modified for a proper application to domestic open-pit limestone mine.

Measures to Reduce Mine Hazards Caused by Open- cut Mining of Limestone Mines (석회석광산에서 노천채굴에 따른 광해 발생을 감소시키기 위한 대책)

  • Won, Yeon-Ho;Ah, Jin-Man
    • Explosives and Blasting
    • /
    • v.24 no.2
    • /
    • pp.75-82
    • /
    • 2006
  • Most of limestone mines in Korea have been developed by a open-cut mining method in consideration of a deposited condition of ore, ore recovery, safety, economic efficiency, etc.. But it has produced environmental problems such as dust flying, blasting noise & vibration, and spoil of farmlands due to slope failure of waste rock mass caused by access road construction, fragmentation & crush of rocks, blasting, transportation, and mineral processing. In this study, it has been suggested for measures to reduce mine hazards caused by open- cut mining of limestone nines.

3-dimensional Modeling and Mining Analysis for Open-pit Limestone Mine Stope Using a Rotary-wing Unmanned Aerial Vehicle (회전익 무인항공기를 이용한 노천석회석광산 채굴장 3차원 모델링 및 채굴량 분석)

  • Kang, Seong-Seung;Lee, Geon-Ju;Noh, Jeongdu;Jang, Hyeongdoo;Kim, Sun-Myung;Ko, Chin-Surk
    • The Journal of Engineering Geology
    • /
    • v.28 no.4
    • /
    • pp.701-714
    • /
    • 2018
  • The purpose of this study is to show the possibility of 3-dimensional modeling of open-pit limestone mine by using a rotary-wing unmanned aerial vehicle, a drone, and to estimate the amount of mining before and after mining of limestone by explosive blasting. Analysis of the image duplication of the mine has shown that it is possible to achieve high image quality. Analysis of each axis error at the shooting position after analyzing the distortions through camera calibration was shown the allowable range. As a result of estimating the amount of mining before and after explosive blasting, it was possible to estimate the amount of mining of a wide range quickly and accurately in a relatively short time. In conclusion, it is considered that the drone of a rotary-wing unmanned aerial vehicle can be usefully used for the monitoring of open-pit limestone mines and the estimation of the amount of mining. Furthermore, it is expected that this method will be utilized for periodic monitoring of construction sites and road slopes as well as open-pit mines in the future.

Ecological Restoration Monitoring of Open-Pit Mines using Airborne Laser Scanning (항공레이저측량 데이터를 이용한 노천광산 생태복원 모니터링)

  • Lee, Hyun-Jik;Yang, Seung-Ryong;Lee, Kyu-Man
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.16 no.4
    • /
    • pp.101-107
    • /
    • 2008
  • Due to increased interest in environmental friendly ecological development and restoration, civil appeals concerning various environmental and landscape problems are continuously being lodged in cases where open-pit limestone mines are situated in places with eminent natural landscape. In this study, with the open-pit limestone mines located in the Baekdu mountain range as a study area, intends to contribute in recognition of various environmental problems and in the promotion of a reasonable restoration plan through high quality geo-spatial information. And it is planning to establish a method for sustained monitoring of the limestone mining by building intelligent national land information of the study area through combining Airborne Laser Scanning and Terrestrial LiDAR based surveying.

  • PDF

Comparison of Blast Fragmentation Efficiencies from Conventional Bench and Double Air Deck Charge Blast Methods in Limestone Mine (석회석 광산에서 기존 일반발파와 이중분상 Air Deck 발파공법의 비교연구)

  • Kang, Dae-Woo;Hur, Won-Ho;Yang, Kook-Jung;Park, Dong-Chul
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.13-31
    • /
    • 2011
  • Air deck charge blast methods have been applied to improve the fragmentation in open cut bench blastings for mining developments. However, during large scale bench blasting operations, there exist some problems such as boulder productions due to explosive charge concentration. Especially, in case of lime stone mining, when air deck method is applied, there has been unintentionally concentrated on charging because the inside holes are often broken by erosion and decomposition. In this study, compared with general blasting, air deck blasting has been focused in lime stone mining. In other to maximize its efficiency, inside hole was examined by endoscope in advance and deck charge using air tube was applied to the section in which concentration might be taken place. Blasting efficiency, fragmentation, charging reduction rate, and total working hours (from charging to blasting) were the main object for comparing, and as a result, air deck was more efficient then the general blasting in all aspects except total working hours.

A Suggestion of Rock Mass Classification Systems for Stability of Underground Limestone Mines - A Case Study (석회석 광산의 지하갱도 안정성평가를 위한 암반분류법 개발)

  • Karanam U. M. Rao;Choon Sunwoo;Chuug, So-Keul;Park, Sung-Oong;Jeon, Yang-Soo
    • Tunnel and Underground Space
    • /
    • v.13 no.6
    • /
    • pp.421-433
    • /
    • 2003
  • Demand for limestone production from both the underground and opencast mines in Korea is gradually increasing. Increase in productivity with safe mining operations is the emphasis laid on the mining industry. KIGAM has undertaken a detailed investigation to apply RMR and Q classification system for the design of underground limestone mining operations. The field investigations were confined to the underground mines of Daesung Mining Development Co. Ltd. and Pyunghae Mines of Korean Airport Service. Modification to the standard RMR and Q for limestone mines in Korea along with the correlation between these two systems are discussed while attempts were also made to calculate the width of a safe unsupported span.

미국 및 일본의 석회석 광산 견학보고

  • 임광규
    • Cement Symposium
    • /
    • no.5
    • /
    • pp.50-51
    • /
    • 1977
  • $\cdot$ 일에서 기 개발 운영되고 있는 대형 노천 광산 및 광산 장비 제작 공장에 대한 전반적인 실태 파악을 통하여 향후 대형화로 국제 규모화될 당사 석회석 광산의 운영 및 기술적인 방향을 모색코저 함이 금번 출장의 목적이었다. 이에 당사 광산분야 기술자 6명으로 team을 구성, 76년 하반기에 약 1개월은 미국에서, 약 1개월은 일본에서 양국 굴지의 10여 open pit mine 및 3개 장비 메이카를 방문 견학하였다. 금번 방문결과 다음과 같은 점을 느꼈다. 첫째 금번 당사의 560만톤 증설은 사실상 미 $\cdot$ 일을 앞지르고 국제적으로 굴지의 규모임을 확인할 수 있었고 둘째 광상의 지리적 여건 비교에서는 미국의 것에는 뒤지나 일본의 조건에 비해서는 우리의 것이 결코 악조건이 아니며 세계 특히 일본 석회석 광산업계가 안고 있는 제반문제점의 심각성(광구 경계 인접에 따른 분쟁, 시가지 인접에 따른 공해문제, 개발 여건의 불량 등)에 비추어 볼 때 국내광산 기술자들의 노력 여하에 따라 일본은 충분한 경쟁대상이 될 수 있으며 국내 시멘트업계, 광산의 지리적 지질적 여건상 일본광산보다 더욱 우수한 광산을 만들 수 있다는 자신감을 얻었다. 그러나 첫째 장기적인 측면에서의 광산 개발의 결여, 둘째 맥석과 폐토 처리 및 quarry QC의 불가피성, 셋째 사회적 요소의 낙후(M.S 뇌관부재, 메이카 출장에 의한 장비의 수리, 화약류의 산원(山元) 혼합사용 등) 등은 두드러진 우리의 결함이라고 느꼈으며 이들 결함의 시정, 보완을 위해서 사내외적으로 기존질서의 재검토가 이루어져야 할 것으로 생각된다. 미 $\cdot$ 일 광산에서 일반화되어 있는 radio(walkie-talkie) system 및 electric shovel, 주우시멘트사 산구사무소에서 시도된 belt반전장치, 인력의 확대관리 등은 조기도입하여 실용화 할 수 있는 대상이라 생각하며 일철의 조형산개발(72년 생산 개시, 광산 개발비 200억원, 년산능력 800만톤)은 괄목할만한 것이었다. 또한 앞으로 국내업계 여건이 허락하는 한 광산 기술자의 해외파견 회수를 증가시켜 더 많은 사람들이 직접 보고 느끼어 우리의 것을 개선 창조해 나갈 수 있는 기회를 많이 가져 국내는 물론, 국제 경쟁에 대처할 수 있는 업계 기술자의 자질 향상을 바란다.

  • PDF

$\cdot$일 석회석광산 견학 보고

  • 임광규
    • Cement
    • /
    • s.67
    • /
    • pp.25-41
    • /
    • 1977
  • $\cdot$일에서 기 개발 운영되고 있는 대형 노천광산 및 광산장비 제작 공장에 대한 전반적인 실태 파악을 통하여 향후 대형화로 국제규모화될 당사 석회석 광산의 운영 및 기술적인 방향을 모색코자 함이 금번 출장의 목적이었다. 이에 당사 광산분야 기술자 6명으로 팀을 구성, 76년 하반기에 약 1개월은 미국에서, 약 1개월은 일본에서 양국 굴지의 10여 open pit mine 및 3개 장비 메이커를 방문 견학하였다. 금번 방문 결과 다음과 같은 점을 확인할 수 있었다. 첫째 금번 당사의 560만톤 증설은 사실상 미$\cdot$일을 앞지르고 국제적으로 굴지의 규모임을 확인할 수 있었고, 둘째 deposit(광상)의 지리적 여건비교에서는 미국의 것에는 뒤지나 일본의 조건에 비해서는 우리의 것이 결코 악조건이 아니며, 세째 특히 일본 석회석 광산업계가 안고 있는 제반문제점의 심각성(광구 경계 인접에 따른 분쟁, 시가지 인접에 따른 공해문제, 개발 여건의 불량 등)에 비추어 볼 때 국내 광산 기술자들의 노력 여하에 따라 일본은 충분한 경쟁대상이 될 수 있으며 국내시멘트업계 광산의 지리적, 지질적 여건상 일본광산보다 더욱 우수한 광산을 만들 수 있다는 자신감을 얻었다. 그러나 (1) long term 한 측면에서의 광산개발의 결여 (2) dyke와 폐토 처리 및 quarry QC의 불가피성 (3) 사회적 요소의 낙후(M.S 뇌관부재, 메이커 출장에 의한 장비의 수리, 화약류의 산원 혼합사용 등)등은 두드러진 우리의 결함이라고 느꼈으며 이들 결함의 시정, 보완을 위해서 사내외적으로 기존질서의 재검토가 이루어져야 할 것으로 사료된다. 미$\cdot$일 광산에서 일반화되어 있는 radio(walkie-talkie) system 및 electric shovel 주우 Cement Co., 산구사업소에서 시도된 belt 반전장치, 인력의 확대관리 등은 조기도입하여 실용화할수 있는 대상이라 생각하며 일철의 조형산 개발(72년 생산 개시, 광산 개발비 200억원, 연산 능력 800만톤)은 괄목할만한 것이었다. 또한 앞으로 국내업계 여건이 허락하는 한 광산 기술자의 해외파견 회수를 증가시켜 더 많은 사람들이 직접 보고 느끼어 우리의 것을 개선 창조해 나갈 수 있는 기회를 많이 가져 국내는 물론 국제 경쟁에 대처할 수 있는 업계 직원의 자질 향상을 바란다.

  • PDF

A Monitoring Strategy on Dispersion of Particulate Matter emitted from Domestic Limestone Open Pit Mines (국내 노천 석회석 광산먼지 확산 모니터링 방안)

  • Yoon, Jinho;Lee, Sang-hun;Seo, Eui Young;Baek, Seunghan
    • Economic and Environmental Geology
    • /
    • v.54 no.4
    • /
    • pp.475-482
    • /
    • 2021
  • This study proposed a strategy with literature review on effective monitoring of dispersion of the particulate matters (PM) emitted from domestic open pit lime mines. The mines generally produced a large amount of PM through the mine processes such as crushing and transportation of raw or crushed ores. The PM emission from mine facilities or transportation can be assessed using empirical equations which was prepared through the experimental tests to produce PM from ores. For effective monitoring of mine PM dispersion, this study showed a preliminary application of the monitoring network with multiple low-cost sensors around a main PM emission source for each mine site. Therefore, two domestic limestone mine sites were selected for this study, and install the monitoring network with low-cost PM sensors and LTE (Long-term evolution) data communication. Then, preliminary resultant PM data plotted according to monitoring duration showed typical PM dispersion patterns. The quantification of the PM dispersion patterns should be roughly prepared by a PM size-dependent dispersion modeling.

A Study on the Mining Method for Limestone Mines with Less Environmental Hazards (환경오염 저감을 위한 석회석 광산개발방안에 대한 연구)

  • 임한욱;김재동;백환조
    • Tunnel and Underground Space
    • /
    • v.10 no.1
    • /
    • pp.80-91
    • /
    • 2000
  • Open cut mining of limestone is generally considered to be more advantageous than underground mining in recovery, grade control, economics, and safety, but it causes substantial environmental pollutants such as ground vibration, noise, dust. It also changes ground surface and may destroy vegetation. The Halla limestone mine which lies adjacent to Baikdu mountains range is selected for a model study. To reduce environmental hazards, and to conserve original surface and woods, both open cut and underground mining methods must be adopted. In case of sub-level sloping. a unit block of 87m high, 70m wide, and 100∼l20m long is suggested with an estimated overall recovery of 42%. Some suggestions to reduce the environmental hazards are also included. The followings must be considered in determining the degree of fragmentation; the discontinuity conditions in the rock mass and the charge concentration both at the bottom and column of the hole. In addition to adopting a barrier wall for reducing environmental hazards, the probable production from underground mining is also discussed.