• Title/Summary/Keyword: 굴착 사고

Search Result 94, Processing Time 0.019 seconds

Fire Suppression Test using the Automatic Monitor System for Double-Deck Tunnel (복층터널 자동 모니터 소화설비를 이용한 화재진압 실험)

  • Park, Jin-Ouk;Yoo, Yong-Ho;Kim, Hwi-Seung;Park, Byoung-Jik;Kim, Yang-Kyun
    • Fire Science and Engineering
    • /
    • v.31 no.6
    • /
    • pp.40-46
    • /
    • 2017
  • As one of the solutions to deal with economic loss caused by traffic congestion in metropolitan area, a deep underground road has been planned and implemented at home and abroad. The part of them has been pushed ahead with a double-deck scheme which has an advantage in constructability and cost efficiency comparing to traditional road tunnel. However, the double-deck tunnel has a lower floor height than the general road tunnel due to the special structure used as the upper and lower lines by installing the middle slab on one excavation section. Therefore, it is relatively weak against fire accidents and ventilation problems occurring in tunnels. Thus study to develop the life safety system optimized to a double-deck tunnel has been systematically carried out in order to overcome their weak point. In this study, automatic monitoring fire extinguisher (AMFE) is developed to suppress a fire and prevent its spread at early stage of tunnel fire, conducting the performance test through vehicle fire tests as verification. The tests were conducted with AMFE being 30 m apart from the vehicle and 10 m apart from engine room. As a results, it was confirmed that AMFE enables to suppress a fire and prevent its spread in both cases.

Trend of Physical Modelling For Ground Subsidence And Study of Its Application (지반함몰 모형실험 연구동향 및 적용방안 고찰)

  • Jeong, Seong-Yun;Jeong, Yeong-Hoon;Kim, Dong Soo
    • Journal of Korean Society of Disaster and Security
    • /
    • v.10 no.1
    • /
    • pp.1-10
    • /
    • 2017
  • Recently, increasing cases of ground subsidence in the urban area has become social issue, and related bill has been passed. Ground subsidence occurs through complex combination of various factors, and numerical analysis of this problem is limited thereby. This is why verification of ground subsidence mechanism has been conducted through physical modelling. Previous researches has been focused on modelling ground subsidence caused by utility pipe defects, and there has been insufficient physical modelling study on ground subsidence caused by various reasons such as groundwater flow and excavation activity. Also, most previous physical modelling studies were performed in 1g condition, which cannot take the in-situ stress condition into the evaluation of the ground subsidence mechanism. Therefore, in this study, physical modelling techniques to simulate various conditions is discussed by studying the previous researches on the ground subsidence mechanism through physical modelling. Also, centrifuge modelling test is suggested in this study as the technique to perform more reliable evaluation of ground subsidence mechanism. Lastly, this study suggests to apply the techniques used in the evaluation of ground subsidence mechanism into Ground Stability Assessment.

Development of 3D Underground Information Construction and Visualization System Based on IUGIM (지하공간통합지도 기반 3차원 지하정보 구축 및 가시화시스템 개발)

  • Kang, Kyung Nam;Kim, Wooram;Hwang, Seung Hyun;An, Joon Sang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.497-505
    • /
    • 2021
  • Due to recent underground space accidents, are a frequent occurence in Korea, the government established the basic plan for the construction of the IUGIM (Integrated Underground Geospatial Information Map) in 2015 as a measure for safety management of underground spaces. The development of IUGIM was partially completed as of 2021. The underground space management entity and related organizations are utilizing it. This study is being carried out as part of a plan to improve the usability of IUGIM, and to build a visualization system that compares real-time field data with stored data. A system, equipped with a visualization function for borehole data and 6 types of underground facilities built and managed on IUGIM; a tool capable of comparative analysis with real-time data measured in the field, is being built. The 6 types of underground facilities are water supply pipe, sewage pipe, power pipe, gas pipe, communication pipe, and heating pipe. The completed system was demonstrated at three locations in Seocho-gu, Gangnam-gu in Seoul. The field demonstration was carried out by accessing the mobile center and downloading IUGIM data, visualizing IUGIM data (surface creation, borehole information, underground facilities), and visualizing the GPR(Ground Penetrating Radar)-based data acquired at the field. As a result of the empirical results of IUGIM data and GPR-based field data, it was judged to be suitable. As a result of this study, it is judged that it can be helpful for safe construction at the excavation site.

Overall risk analysis of shield TBM tunnelling using Bayesian Networks (BN) and Analytic Hierarchy Process (AHP) (베이지안 네트워크와 AHP (Analytic Hierarchy Process)를 활용한 쉴드 TBM 터널 리스크 분석)

  • Park, Jeongjun;Chung, Heeyoung;Moon, Joon-Bai;Choi, Hangseok;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.453-467
    • /
    • 2016
  • Overall risks that can occur in a shield TBM tunnelling are studied in this paper. Both the potential risk events that may occur during tunnel construction and their causes are identified, and the causal relationship between causes and events is obtained in a systematic way. Risk impact analysis is performed for the potential risk events and ways to mitigate the risks are summarized. Literature surveys as well as interviews with experts were made for this purpose. The potential risk events are classified into eight categories: cuttability reduction, collapse of a tunnel face, ground surface settlement and upheaval, spurts of slurry on the ground, incapability of mucking and excavation, and water leakage. The causes of these risks are categorized into three areas: geological, design and construction management factors. Bayesian Networks (BN) were established to systematically assess a causal relationship between causes and events. The risk impact analysis was performed to evaluate a risk response level by adopting an Analytic Hierarchy Process (AHP) with the consideration of the downtime and cost of measures. Based on the result of the risk impact analysis, the risk events are divided into four risk response levels and these levels are verified by comparing with the actual occurrences of risk events. Measures to mitigate the potential risk events during the design and/or construction stages are also proposed. Result of this research will be of the help to the designers and contractors of TBM tunnelling projects in identifying the potential risks and for preparing a systematic risk management through the evaluation of the risk response level and the migration methods in the design and construction stage.