• Title/Summary/Keyword: 구조감리

Search Result 59, Processing Time 0.023 seconds

A Benchmarking Study on CM Fee Estimation (해외사례 벤치마킹에 기반한 국내 CM 대가체계 개선 시사점 도출)

  • Kim, Sang-Bum;Lee, Jeong-Dae;Kim, Jae-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.96-106
    • /
    • 2008
  • The Korean Construction Industry significantly contributed to the Korean economic development not only by preparing the domestic infrastructure but also by successfully conducting various international projects. However, major incidents such as the collapse of Sung-Su Bridge and Sam-Pung Department Store along with stagnation of Korean Economy have raised questions about underlying systematic problems of the Korean Construction Industry. As a solution to resurrect the Korean Construction Industry, the Construction Management (CM) system introduced in late 1990's and increasingly utilized as an innovative delivery system. Despite of the fast growth of CM, the performance of CM has not been up to the hype and low CM fee has been identified as one of the main reasons of unsatisfactory CM performance. Therefore, this research attempted to propose ways of improving 'CM Fee Guidelines' published by Korean Ministry of Construction and Transportation by conducting a benchmarking study on Global Standards of estimating CM Fee. International organizations benchmarked in this research include CMAA, ASCE, DOL, DOE, etc. Various investigation and analysis revealed that Korean 'CM Fee Guidelines' need to significantly modified comparing to Global Standards. This research also tried to prepare recommendations to improve the CM deliver system focusing on the 'Method of CM Fee Estimation' and Selection of a CM firm as an owner's agent.

Prospects on Changing Business Structure in the Korean Construction Industry (건설업 업역구조 변화에 관한 연구)

  • Lee Seok-Jae;Kim Kyung-Rai;Yu Jin-Keun;Kim Dae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.37-46
    • /
    • 2001
  • Business boundaries of firms in the construction industry are strictly regulated in Korea. Under the current law, firms involved in construction processes are classified into five categories; general contractors, specialty contractors, architects' offices, engineering firms, and specialized in inspection. Among these types of firms, general contractors are prohibited to enter into specialty contractor's market and vice versa by the basic law in the construction industry. Also general contractors are not allowed to provide architectural services. The purpose of the law is to prohibit unlicensed companies from entering the construction market and to protect customers. However, the law causes critical problems e.g. low efficiency of production and rent creation. Therefore, we identify problems concerning business boundaries of firms in the construction industry and predict structural changes in the them when they are liberalized. So we surveyed general contractors and specialty contractors in Korea to estimate the effects of the liberalization on the construction industry. Most of contractors point to the enhancement of production efficiency as the motivation to integrate other construction process. If current regulations, which limit firms' decisions on business boundaries, are eliminated, firms will choose optimal business scopes taking into account types of contracts adopted by the Government for public works. Based on the cost/benifit analyses, they will decide whether to intergrate other production processes or not.

  • PDF

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.

A Study on the Plan and Structural System of 4 kan(間) by 4 kan(間) Church in the Early 20th Century (20세기초 4칸${\times}$4칸 교회의 평면구성 및 구조형식에 관한 연구)

  • Kim, Ki-Joo
    • Journal of architectural history
    • /
    • v.17 no.5
    • /
    • pp.39-53
    • /
    • 2008
  • This study aims to investigate and analyze the plan and structural system of 4 kan(間) by 4 kan(間) square church built in early 20th century. At that time, three kinds of traditional wooden structure church had been built under the circumstances of transitional era : Basilica style such as Ganghwa Anglican Church, 'ㄱ' shaped style such as Keumsan Church and $4{\times}4$ Square style such as Bukok Church and Jacheon Church that are concerned in this study. Traditional plans and structural system were mixed with new religious function and transformed into korean peculiar style. $4{\times}4$ Square style is a residual product in that process. Despite of it, little concerns on it till now. The results of this study are described as follows. 1. The plan of these $4{\times}4$ square churches is divided into three areas : cathedra($1{\times}1$), attendance($4{\times}2$), and intermediation($4{\times}2$). The location of cathedra is commonly the opposition part of main gate and projected out of the building. Attendance area was also divided into two, man and woman, because of keeping a distance with each other. 2. The structural system of these $4{\times}4$ square churches are somewhat different because of their size and roof style. In the case of Bukok church, $4{\times}4$ square fall off $3{\times}3$ and $2{\times}2$ gradually and turn into paljak(八作) roof, which enable us to get in traditional entering methods. On the contrary, Jacheon church use hipped roof but almost alike pyramidal roof, which could make us not to recognize entering in the aspect of gable part.

  • PDF

Analysis of Road Pavement Condition and Structural Improvement Plan (서울시 도로포장 상태에 대한 분석 및 구조적 개선방안)

  • Bae, Yoon-Shin;Shin, Kyoung-Yub
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.2
    • /
    • pp.119-137
    • /
    • 2012
  • In this study, the damages and condition of road pavement were analyzed using pavement management system (PMS) for the structural improvement. Problems of road pavement management were issued by in-depth interview with workers in charge of plant, construction and supervision. By surveying advanced road pavement management, the way how to improve road pavement management in Seoul was discussed. In conclusion, it is necessary to take measures against road heavy traffic and heavy rain in summer. It was found that the problem of early damages of road pavement due to uniform layout with analyzing life cycle cost (LCC). According to the results of survey, it was suggested to strength practical training and to control precisely the temperature of pavement in the process of production and construction.

Development of 3-Dimensional Rebar Detail Design and Placing Drawing System (3차원 배근설계 및 배근시공도 작성 자동화 시스템 개발)

  • Choi, Hyun-Chul;Lee, Yunjae;Lee, Si Eun;Kim, Chee Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.4
    • /
    • pp.289-296
    • /
    • 2014
  • The rebar detailing is an important work influencing the final performance and quality of RC structures. But it is one of the most irrational and illogical activity in construction site. Many groups of workers, including main contractors, structural engineers, shop drawers, rebar fabricators, and etc., participate in this activity. A loosely-organized process for this activity is apt to produce a big amount of rebar loss or even degraded structures. A 3-dimensional rebar auto-placing system, called as Rebar Hub, has been designed and implemented in this research. Rebar Hub provides a totally integrated service from 3D structural modeling of buildings to rebar auto-placing considering anchorage, splice, and the length of ordered rebar. In addition, Rebar Hub can recognize the 2D drawing CAD files and then build 3D structural models which are used for the start point of 3D rebar auto-placing. After rebar auto-placing, each members of the 3D structural model have rebar information belonging to them. It means that the rebar information can be used for the afterward works such as quantity-survey, manufacturing and fabrication of rebars. Rebar Hub is showing outstanding performance while applying to practical projects. It has almost five times productivity and reduces the rebar loss up to 3~8% of the initially-surveyed amount of rebar.

Case Study of Cooperative Learning Simulating Turn-Key System in Design Class for Environmental Engineering (턴키 제도를 모사한 환경공학 설계과목의 협동학습 적용사례)

  • Kim, Geon-Ha;Oh, Ju-Won;Lee, Hack-Soo
    • Journal of Engineering Education Research
    • /
    • v.9 no.4
    • /
    • pp.5-9
    • /
    • 2006
  • In this research, a case study for cooperative learning practiced in a design class for environmental engineering was presented. Designing a treatment facility for urban diffuse pollution was a main problem given to the participants. Turn-key system for civil works were simulated throughout class works. Twenty five students were grouped into four virtual companies and assigned own position from chairperson to workers. Each group competed throughout establishing design concept regarding order, expense calculation, process distribution, actual calculation. Best design with lowest bidding won the first place. For evaluating class effectiveness, one student from each group were monitored thorough semester. Participants were improved for their understanding about company establishment, turn-key system management, awareness about personal management, and presentation skills. Tension of the class was effectively elevated as well.

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

4S Framework Construction Structure for Interoperability of Spatial Information (공간 정보의 상호운용성을 위한 4S 기반 프레임워크 구축)

  • Oh, Byoung-Woo;Kim, Min-Soo;Joo, In-Hak;Lee, Jong-Hun;Yang, Young-Kyu
    • Journal of Korea Spatial Information System Society
    • /
    • v.3 no.1 s.5
    • /
    • pp.95-108
    • /
    • 2001
  • The provision of spatial data is a key infrastructural requirement for the promotion of economic growth, environmental quality, social progress, etc. 4S technology integrates 4 kinds of systems that process spatial data: GIS (Geographic Information System), GNSS (Global Navigation Satellite System), ITS (Intelligent Transport System), and SIIS (Spatial Imagery Information System). Spatial data processing field is expected to get synergy effect and overcomes development limit of individual unit technology via 4S technology. This paper discusses both the development of 4S-kernel technology and the construction of 4S-based framework, In the development of 4S kernel technology, we will concentrate on the following issues: the development of 4S base components for reciprocity integration among GIS, SIIS, GNSS and ITS technologies, the development of 4S-Mobile S/W and H/W, 4S-Van components, and national LBS technologies. And in the construction of 4S-based framework, we will especially concentrate on the ISP for overall 4S technologies, the international cooperative research center, and the guide model deduction for supervision and certification of 4S projects. Finally, we examine about how the construction of 4S-baed framework affects 4S industry.

  • PDF