• Title/Summary/Keyword: 구간 통행속도

Search Result 145, Processing Time 0.021 seconds

Decision Making Process for Wind Barrier Installation Considering Car Accident Risk (차량사고 위험도를 고려한 방풍벽 설치기준)

  • Kim, Dong-Hyun;Lee, Il-Keun;Kwon, Soon-Duck;Jo, Byung-Wan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.1
    • /
    • pp.17-26
    • /
    • 2010
  • This study presents a decision making process for installation of wind barrier which is used to reduce the wind acting on running vehicle on expressway. At the first stage of this study, the lateral deviations of running vehicles under side winds were computed from the commercial softwares, CarSim and TruckSim, and then the critical wind speeds for car accident were evaluated from predefined risk index. To determine whether it is needed to install wind barrier or not, cost and benefit from wind barrier are calculated during lifetime. In obtaining car accidental risk, probabilistic distribution of wind speed, daily traffic volume, mixture ratio in the volume, and duration time for wind speed range are considered. It is recommended to install wind barrier if benefit from the barrier installation exceed construction cost. In the numerical examples, case studies were shown for risk and benefit calculation and main risky regions on Korean highway were all evaluated to identify the number of installation sites.

Implementing Special Transportation Management Zone System for Dongdaemoon Garment District (동대문 의류밀집상가 교통혼잡특별관리구역 사례연구)

  • 황기연;엄진기;이종운;조용학
    • Journal of Korean Society of Transportation
    • /
    • v.18 no.6
    • /
    • pp.7-17
    • /
    • 2000
  • The Purpose of this study is to test the effectiveness of Special Transportation Management Zone system (TZ) when it is applied to Dongdaemoon commercial zone located in downtown Seoul. The study consists of two Parts ; the legal components of TZ and the case study on Dongdaemoon district. The case study includes the analysis of current traffic situation on the study zone, the design of implemention alternative for each component of TZ, the framework of impact analysis system, and the analysis results. The study finds, if 2,000 won mandatory parking fee on drivers parking in the buildings only with over 10 parking spaces and over 3.000$m^2$ in floor area, strong illegal parking enforcement, and Pro-hibition of parking passenger cars whose last digit plate number matches with the last digit of date, are implemented in the zone simultaneously, the traffic speed increases to 20.56km/h which is above the target set in the zone. In conclusion, we find that TZ2 can be an effective tool relieving traffic congestion in Seoul, and that it is necessary for introducing TZ in Seoul that relevant laws should be revised and expecting problems should be overcome.

  • PDF

Alternative to Improve the Lighting of Crosswalk on Rural Highways (지방지역 도로 횡단보도 조명 개선 방안)

  • Lee, Suk-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.3
    • /
    • pp.435-443
    • /
    • 2013
  • While rural highways carry on lower traffic volumes, the deviations of running speeds between vehicles appear to be higher on rural highways than urban highways. The speed characteristic of rural highways is adding to pedestrian-related accidents which occur on a crosswalk with poor sight distance due to the limits of car headlights and lighting. Specially, the aged was mostly occupied in nighttime-related accidents on crosswalks, and pedestrians crossing on the far side of approaching vehicles appear to have the probability of fatality higher than the near side. An alternative is needed to resolve the compounded accidents, and then this study is to establish a new approach to an optimum lighting environment on a crosswalk to improve pedestrian safety. This study was conducted by a survey and a field study on the lighting of existing crosswalks. The field study shows that the existing lighting has the problem of wasting energy and impeding walking due to glare. The survey shows that nighttime sight distance on a crosswalk is required to improve and that road users prefer to be brighter pedestrian waiting space together with the crosswalk. Thus, a lighting environment that is not too bright and illuminates the crosswalk and the pedestrian waiting space is needed to implement.

A Study on the Optimum-Path for Traffic of Road Using GIS (GIS를 이용한 도로교통(道路交通)의 최적경로(最適經路) 선정(選定)에 관한 연구)

  • Oh, Myoung-Jin
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.5 no.2 s.10
    • /
    • pp.131-144
    • /
    • 1997
  • Traffic jam densified day by day is phenomenon to occur lack of the road capacity in comparison with traffic density, but lack of the road cannot be concluded by main cause of traffic ism. Because the central function of a city would be concentrated upon the downtown and traffic demand would not be evenly distributed by the classification of an hour. Therefore, this study based on the fact that each driver will select the route generating traffic delay very low when path choice from origin to destination in travel plan estimating the quality of passage could be maintained the speed he want will approach to a characteristic grasp of a road, traffic, driver changing every moment by traffic-demand of road increased as a geometrical series with analysis a classification of a street, a intersection along the path on traffic density and highway capacity analysis the path using GIS techniques about complex street network, also will get the path of actual optimum for traffic delay trend creating under various condition the classification per a hour, a day of week and an incident through network such as analysis for traffic generation zone adjacent about street, intersection, afterward will expect the result increasing efficiency of the road-use through a good distribution of traffic by optimum-path choice, accordingly will prepare the scientific, objective, appropriate basis to decide the reasonable time of a road-widen and expansion through section analysis along a rate of traffic volume vs. road capacity.

  • PDF

Importance and Satisfaction Rating Assessment of users Regarding BRT Facility and Operation : The Case of Busan (BRT 시설 및 운영에 관한 이용자의 중요도 만족도 평가 : 부산광역시를 중심으로)

  • Kim, Seong Eun;Jung, Hun Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.595-603
    • /
    • 2019
  • To alleviate the demand on private car that is constantly increasing, Busan Metropolitan City (BMC) has established Bus Rapid Transit (BRT) to revitalize public transportation. But there are no unified lane system between BRT and general bus stations, which makes off-lane turning general bus to contribute to congestion. And as the bottleneck phenomenon at entrance/exit accelerates the congestion, there has been huge dissatisfaction among commuting drivers. Therefore, this study identifies efficient methods to operate better through measuring civilian awareness. We evaluate both satisfaction and drawbacks on BRT service with Importance-Performance Analysis (IPA). We first distinguish the groups by the awareness on BRT and their main transit usage, and then clarify the difference between the groups. And as a result, the group who is positive to BRT and uses buses often demands improvement in bus indoor comfort and curbing jaywalking. On the other hand, group who is negative to BRT and uses private cars often demands improvement in lane changing and the moving speed of private cars. We next examines the groups with MDPREF, one method of Multidimensional Scaling (MDS). And we have clarified that the evaluating criteria and the individual attributes of the groups corresponds very well.