Journal of the Korean Institute of Landscape Architecture
/
v.50
no.4
/
pp.20-36
/
2022
This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.
The purpose of this study is to approach more analytical facility management strategies for Korea national parks based on visitor awareness. Total number of 214 survey questionnaire of the visitors to a mountain type Deogyu National Park and a coastal type Taean National Park was analyzed employing importance-performance analysis. The result shows that Taean National Park has 4 attributes in 'keep up good work', 3 attributes in 'low priority', and 2 attributes in 'possible overkill'. Deogyu National Park has 3 attributes in 'keep up good work', 4 attributes in 'low priority', and 1 attribute in 'concentrate here'. Satisfaction level of the facility was above average and total satisfaction level of the visit was also higher than 3 points for each park. Deogyu National Park scored higher in both criteria, while Taean National Park was evaluated negative in all detailed items. It may be attributed to a visitor difference between a coastal type national park and a mountain type national park. To increase visitor satisfaction, it is a requirement for facility management to be based on use characteristic of an individual park by the type.
Ginseng has a unique production system that is different from those used for other crops. It is subject to the Ginseng Industry Act., requires a long-term cultivation period of 4-6 years, involves complicated cultivation characteristics whereby ginseng is not produced in a single location, and many ginseng farmers engage in mixed-farming. Therefore, to bring the production of Ginseng in line with GAP standards, it is necessary to better understand the on-site practices of Ginseng farmers according to established control points, and to provide a proper action plan for improving efficiency. Among ginseng farmers in Korea who applied for GAP certification, 77.6% obtained it, which is lower than the 94.1% of farmers who obtained certification for other products. 13.7% of the applicants were judged to be unsuitable during document review due to their use of unregistered pesticides and soil heavy metals. Another 8.7% of applicants failed to obtain certification due to inadequate management results. This is a considerably higher rate of failure than the 5.3% incompatibility of document inspection and 0.6% incompatibility of on-site inspection, which suggests that it is relatively more difficult to obtain GAP certification for ginseng farming than for other crops. Ginseng farmers were given an average of 2.65 points out of 10 essential control points and a total 72 control points, which was slightly lower than the 2.81 points obtained for other crops. In particular, ginseng farmers were given an average of 1.96 points in the evaluation of compliance with the safe use standards for pesticides, which was much lower than the average of 2.95 points for other crops. Therefore, it is necessary to train ginseng farmers to comply with the safe use of pesticides. In the other essential control points, the ginseng farmers were rated at an average of 2.33 points, lower than the 2.58 points given for other crops. Several other areas of compliance in which the ginseng farmers also rated low in comparison to other crops were found. These inclued record keeping over 1 year, record of pesticide use, pesticide storages, posts harvest storage management, hand washing before and after work, hygiene related to work clothing, training of workers safety and hygiene, and written plan of hazard management. Also, among the total 72 control points, there are 12 control points (10 required, 2 recommended) that do not apply to ginseng. Therefore, it is considered inappropriate to conduct an effective evaluation of the ginseng production process based on the existing certification standards. In conclusion, differentiated certification standards are needed to expand GAP certification for ginseng farmers, and it is also necessary to develop programs that can be implemented in a more systematic and field-oriented manner to provide the farmers with proper GAP management education.
Cho Kwang Hwan;Choi Jinho;Shin Dong Oh;Kwon Soo Il;Choi Doo Ho;Kim Yong Ho;Lee Sang Hoon
Progress in Medical Physics
/
v.15
no.4
/
pp.186-191
/
2004
The periodic Quality Assurance (QA) of each radiation treatment related equipments is important one, but quality assurance of the radiation treatment planning system (RTPS) is still not sufficient rather than other related equipments in clinics. Therefore, this study will present and test the periodic QA program to compare, evaluation the efficiency of the treatment planning systems. This QA program is divided to terms for the input, output devices and dosimetric data and categorized to the weekly, monthly, yearly and non-periodically with respect to the job time, frequency of error, priority of importance. CT images of the water equivalent solid phantom with a heterogeneity condition are input into the RTPS to proceed the test. The actual measurement data are obtained by using the ion chamber for the 6 MV, 10 MV photon beam, then compared a calculation data with a measurement data to evaluate the accuracy of the RTPS. Most of results for the accuracy of geometry and beam data are agreed within the error criteria which is recommended from the various advanced country and related societies. This result can be applied to the periodic QA program to improve the treatment outcome as a proper model in Korea and used to evaluate the accuracy of the RTPS.
Korean Journal of Construction Engineering and Management
/
v.7
no.1
s.29
/
pp.100-109
/
2006
Feasibility analysis is a crucial key to success or failure of housing project. Existing feasibility analysis in construction company is based on intuitive approach rather than systematic approach. Usually feasibility analysis in a narrow sense is a financial analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. So, the purpose of this study is to analyze the sensitivity of financial analysis item about profit rate by means of monte carlo simulation and this will improve accuracy of feasibility analysis and decision making.
Korean Journal of Construction Engineering and Management
/
v.21
no.6
/
pp.75-83
/
2020
This study intends to explore the scope of the recognized equity capital of developer in real estate project finance loan screening. The factors which can be recognized as equity capital are categorized into 24 factors with 3 upper categories and 6 mid categories. In order to develop the importance weight of factors, AHP and Fuzzy methodologies are implemented based on survey analysis by experts in financial institutions. Research findings indicate that the land cost, evacuation cost, and real estate acquisition tax as land-related direct costs, and the design cost, traffic impact assessment cost, underground safety impact assessment cost, boundary surveying cost, and geological survey cost as the construction permit-related costs are higher than any others. On the other hand, the supplementary costs related to the operation of the developer show very low importance weight. Accordingly, the hierarchy of factors for equity capital should be clearly developed in order to minimize any dispute and prevent non-performing loans to real estate project finance.
Korean Journal of Construction Engineering and Management
/
v.1
no.2
s.2
/
pp.89-97
/
2000
This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.
This study was carried out to provide basic data for efficient park management by analysing visitors' satisfaction factors and estimated regression model through questionnaire survey method at Taeanhaean National Park in Korea. Performance(satisfaction) variables as 'touting', 'illegal merchant', 'noise', 'indiscreet use' and 'collection of natural plants or animals', and Importance variables as 'littering problem', 'water pollution act', 'careless cooking' and 'exorbitant pay' were relatively high score. It was clarified that the 'souvenir & special product', 'lack of use program' 'lack of public facility', 'lack of information facility', and 'lack of commercial facility' were 'concentrate here' ones by the Importance-Performance analysis. 'Facility management', 'Use management' and 'Resource management' factors were found out by Factor Analysis and the 'Facility management' was the biggest factor accounting for 32.6% of all. In the estimated model by Multiple Regression Analysis, 'lack of employee's guidance or kindness', 'lack of convenience facility', 'noise', 'lack of facilities to stay' and 'charge of user fee, parking fee' were the variables to impact visitors' satisfaction and to need concentrated management. These results were unique characteristics of marine national park and then the different management strategy and policy from mountain national park were necessary.
국가 재정사업을 평가하는 재정사업 자율평가제도는 2005년에 도입되어 2010년까지 두 번의 평가주기가 완료되었다. 본 연구는 이러한 시점에서 2차 평가주기(2008년~2010년) 동안 평가된 재정사업을 대상으로 평가결과에 영향을 미치는 요인들을 검토하였다. 본 연구는 1차 평가주기(2005년~2007년)의 평가결과를 분석한 기존 연구의 확장연구로서, 이전 연구결과를 재확인하고 일반화 가능성을 보다 제고할 수 있을 뿐만 아니라 이전 연구결과와의 비교를 통해서 평가제도의 변화가 평가결과의 변화를 가져왔는지를 검토할 수 있다는 점에서 의의가 있다. 또한 2차 평가주기가 완료된 시점에서, 향후 제도 개선을 위한 정책적 시사점을 줄 수 있다는 점에서 의의가 있다. 본 연구의 주요 분석결과 및 정책적 함의는 다음과 같다. 첫째, 1차 평가주기에 비해서 2차 평가주기의 평가결과가 향상되었다는 점에서 사업의 성과향상 또는 제도에 대한 실무자들의 이해가 보다 증진된 것으로 해석할 수 있다. 둘째, 성과계획항목이 평가결과에 지나치게 강한 영향력을 준다는 측면에서, 이에 대한 제도적 보완이 요구된다. 성과지표의 설정 및 목표치의 결정은 집행 이전에 적절히 이루어져야 할 부문이기에 이를 계획수립 시 사전적으로 지도할 필요가 있다. 셋째, 집행항목과 성과항목 간 부(-)의 관계를 가지므로 이에 대한 적절한 제도적 보완이 필요하다. 넷째, 제도의 타당성을 저해할 수 있는 비평가요인이 총점에 영향을 미치고 있다는 점을 감안할 때, 이에 대한 제도적 보완이 필요하다.
Main concerns of IT project managements are concentrated on the output control and process management. IT project, however, is difficult to measure the quality of achievement, because it produces invisible and intangible outputs. Many studies have been carried on to quantify the intangible aspects of process management. However, most of them have been focused on the technological aspects. This study measures the priority of factors to manage IT project by applying the IT-BSC and PMBOK method. Established indexes include the factors of managerial, social and future-oriented perspectives to check the different aspects of project management over the technical factors. This study uses AHP method for quantitative measurement. This study can be meaningful because of following reasons. First, this study re-arranges IT project management evaluation indexes by balanced scorecard. Second, this model includes human factors of developers and users who are directly related to the project development and operation. Third, important items of each stakeholder have been separated, and the weights of each item have been quantified to have fixed values.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.