• Title/Summary/Keyword: 관리비항목

Search Result 656, Processing Time 0.026 seconds

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.

Facility Management Strategy of a Korea National Park Based on Importance-Performance Analysis (중요도-성취도 분석에 기초한 국립공원 시설관리 방안에 관한 연구)

  • Kim, Jeong-Min
    • Korean Journal of Environment and Ecology
    • /
    • v.29 no.6
    • /
    • pp.952-958
    • /
    • 2015
  • The purpose of this study is to approach more analytical facility management strategies for Korea national parks based on visitor awareness. Total number of 214 survey questionnaire of the visitors to a mountain type Deogyu National Park and a coastal type Taean National Park was analyzed employing importance-performance analysis. The result shows that Taean National Park has 4 attributes in 'keep up good work', 3 attributes in 'low priority', and 2 attributes in 'possible overkill'. Deogyu National Park has 3 attributes in 'keep up good work', 4 attributes in 'low priority', and 1 attribute in 'concentrate here'. Satisfaction level of the facility was above average and total satisfaction level of the visit was also higher than 3 points for each park. Deogyu National Park scored higher in both criteria, while Taean National Park was evaluated negative in all detailed items. It may be attributed to a visitor difference between a coastal type national park and a mountain type national park. To increase visitor satisfaction, it is a requirement for facility management to be based on use characteristic of an individual park by the type.

Improvement of Certification Criteria based on Analysis of On-site Investigation of Good Agricultural Practices(GAP) for Ginseng (인삼 GAP 인증기준의 현장실천평가결과 분석에 따른 인증기준 개선방안)

  • Yoon, Deok-Hoon;Nam, Ki-Woong;Oh, Soh-Young;Kim, Ga-Bin
    • Journal of Food Hygiene and Safety
    • /
    • v.34 no.1
    • /
    • pp.40-51
    • /
    • 2019
  • Ginseng has a unique production system that is different from those used for other crops. It is subject to the Ginseng Industry Act., requires a long-term cultivation period of 4-6 years, involves complicated cultivation characteristics whereby ginseng is not produced in a single location, and many ginseng farmers engage in mixed-farming. Therefore, to bring the production of Ginseng in line with GAP standards, it is necessary to better understand the on-site practices of Ginseng farmers according to established control points, and to provide a proper action plan for improving efficiency. Among ginseng farmers in Korea who applied for GAP certification, 77.6% obtained it, which is lower than the 94.1% of farmers who obtained certification for other products. 13.7% of the applicants were judged to be unsuitable during document review due to their use of unregistered pesticides and soil heavy metals. Another 8.7% of applicants failed to obtain certification due to inadequate management results. This is a considerably higher rate of failure than the 5.3% incompatibility of document inspection and 0.6% incompatibility of on-site inspection, which suggests that it is relatively more difficult to obtain GAP certification for ginseng farming than for other crops. Ginseng farmers were given an average of 2.65 points out of 10 essential control points and a total 72 control points, which was slightly lower than the 2.81 points obtained for other crops. In particular, ginseng farmers were given an average of 1.96 points in the evaluation of compliance with the safe use standards for pesticides, which was much lower than the average of 2.95 points for other crops. Therefore, it is necessary to train ginseng farmers to comply with the safe use of pesticides. In the other essential control points, the ginseng farmers were rated at an average of 2.33 points, lower than the 2.58 points given for other crops. Several other areas of compliance in which the ginseng farmers also rated low in comparison to other crops were found. These inclued record keeping over 1 year, record of pesticide use, pesticide storages, posts harvest storage management, hand washing before and after work, hygiene related to work clothing, training of workers safety and hygiene, and written plan of hazard management. Also, among the total 72 control points, there are 12 control points (10 required, 2 recommended) that do not apply to ginseng. Therefore, it is considered inappropriate to conduct an effective evaluation of the ginseng production process based on the existing certification standards. In conclusion, differentiated certification standards are needed to expand GAP certification for ginseng farmers, and it is also necessary to develop programs that can be implemented in a more systematic and field-oriented manner to provide the farmers with proper GAP management education.

Development and Evaluation of Quality Assurance Worksheet for the Radiation Treatment Planning System (방사선치료계획 시스템의 정도관리 절차서 개발 및 유용성 평가)

  • Cho Kwang Hwan;Choi Jinho;Shin Dong Oh;Kwon Soo Il;Choi Doo Ho;Kim Yong Ho;Lee Sang Hoon
    • Progress in Medical Physics
    • /
    • v.15 no.4
    • /
    • pp.186-191
    • /
    • 2004
  • The periodic Quality Assurance (QA) of each radiation treatment related equipments is important one, but quality assurance of the radiation treatment planning system (RTPS) is still not sufficient rather than other related equipments in clinics. Therefore, this study will present and test the periodic QA program to compare, evaluation the efficiency of the treatment planning systems. This QA program is divided to terms for the input, output devices and dosimetric data and categorized to the weekly, monthly, yearly and non-periodically with respect to the job time, frequency of error, priority of importance. CT images of the water equivalent solid phantom with a heterogeneity condition are input into the RTPS to proceed the test. The actual measurement data are obtained by using the ion chamber for the 6 MV, 10 MV photon beam, then compared a calculation data with a measurement data to evaluate the accuracy of the RTPS. Most of results for the accuracy of geometry and beam data are agreed within the error criteria which is recommended from the various advanced country and related societies. This result can be applied to the periodic QA program to improve the treatment outcome as a proper model in Korea and used to evaluate the accuracy of the RTPS.

  • PDF

A Study on the Sensitivity Analysis of the Financial Analysis Item in Apartment Project (공동주택 사업의 수지분석 항목에 대한 민감도 분석에 관한 연구)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.100-109
    • /
    • 2006
  • Feasibility analysis is a crucial key to success or failure of housing project. Existing feasibility analysis in construction company is based on intuitive approach rather than systematic approach. Usually feasibility analysis in a narrow sense is a financial analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. So, the purpose of this study is to analyze the sensitivity of financial analysis item about profit rate by means of monte carlo simulation and this will improve accuracy of feasibility analysis and decision making.

A Study on the Scope of the Recognized Equity Capital of Developer in Real Estate Project Finance Loan Screening (부동산 PF를 위한 시행사의 자본금 인정범위에 관한 연구)

  • Lim, Suhong;Jang, Hokwan;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.75-83
    • /
    • 2020
  • This study intends to explore the scope of the recognized equity capital of developer in real estate project finance loan screening. The factors which can be recognized as equity capital are categorized into 24 factors with 3 upper categories and 6 mid categories. In order to develop the importance weight of factors, AHP and Fuzzy methodologies are implemented based on survey analysis by experts in financial institutions. Research findings indicate that the land cost, evacuation cost, and real estate acquisition tax as land-related direct costs, and the design cost, traffic impact assessment cost, underground safety impact assessment cost, boundary surveying cost, and geological survey cost as the construction permit-related costs are higher than any others. On the other hand, the supplementary costs related to the operation of the developer show very low importance weight. Accordingly, the hierarchy of factors for equity capital should be clearly developed in order to minimize any dispute and prevent non-performing loans to real estate project finance.

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

Satisfaction Factors and Determinants of Visitors in Taeanhaean National Park, Korea (태안해안국립공원 탐방객 만족요인 및 예측모형)

  • Baek, Jae-Bong;Kim, Dong-Pil
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.2
    • /
    • pp.101-107
    • /
    • 2010
  • This study was carried out to provide basic data for efficient park management by analysing visitors' satisfaction factors and estimated regression model through questionnaire survey method at Taeanhaean National Park in Korea. Performance(satisfaction) variables as 'touting', 'illegal merchant', 'noise', 'indiscreet use' and 'collection of natural plants or animals', and Importance variables as 'littering problem', 'water pollution act', 'careless cooking' and 'exorbitant pay' were relatively high score. It was clarified that the 'souvenir & special product', 'lack of use program' 'lack of public facility', 'lack of information facility', and 'lack of commercial facility' were 'concentrate here' ones by the Importance-Performance analysis. 'Facility management', 'Use management' and 'Resource management' factors were found out by Factor Analysis and the 'Facility management' was the biggest factor accounting for 32.6% of all. In the estimated model by Multiple Regression Analysis, 'lack of employee's guidance or kindness', 'lack of convenience facility', 'noise', 'lack of facilities to stay' and 'charge of user fee, parking fee' were the variables to impact visitors' satisfaction and to need concentrated management. These results were unique characteristics of marine national park and then the different management strategy and policy from mountain national park were necessary.

사업평가에 영향을 미치는 요인 탐색 및 제도적 고찰 - 2008년~2010년 재정사업 자율평가결과를 중심으로 -

  • Yun, Gi-Ung;Gong, Dong-Seong
    • 한국정책학회보
    • /
    • v.21 no.2
    • /
    • pp.91-122
    • /
    • 2012
  • 국가 재정사업을 평가하는 재정사업 자율평가제도는 2005년에 도입되어 2010년까지 두 번의 평가주기가 완료되었다. 본 연구는 이러한 시점에서 2차 평가주기(2008년~2010년) 동안 평가된 재정사업을 대상으로 평가결과에 영향을 미치는 요인들을 검토하였다. 본 연구는 1차 평가주기(2005년~2007년)의 평가결과를 분석한 기존 연구의 확장연구로서, 이전 연구결과를 재확인하고 일반화 가능성을 보다 제고할 수 있을 뿐만 아니라 이전 연구결과와의 비교를 통해서 평가제도의 변화가 평가결과의 변화를 가져왔는지를 검토할 수 있다는 점에서 의의가 있다. 또한 2차 평가주기가 완료된 시점에서, 향후 제도 개선을 위한 정책적 시사점을 줄 수 있다는 점에서 의의가 있다. 본 연구의 주요 분석결과 및 정책적 함의는 다음과 같다. 첫째, 1차 평가주기에 비해서 2차 평가주기의 평가결과가 향상되었다는 점에서 사업의 성과향상 또는 제도에 대한 실무자들의 이해가 보다 증진된 것으로 해석할 수 있다. 둘째, 성과계획항목이 평가결과에 지나치게 강한 영향력을 준다는 측면에서, 이에 대한 제도적 보완이 요구된다. 성과지표의 설정 및 목표치의 결정은 집행 이전에 적절히 이루어져야 할 부문이기에 이를 계획수립 시 사전적으로 지도할 필요가 있다. 셋째, 집행항목과 성과항목 간 부(-)의 관계를 가지므로 이에 대한 적절한 제도적 보완이 필요하다. 넷째, 제도의 타당성을 저해할 수 있는 비평가요인이 총점에 영향을 미치고 있다는 점을 감안할 때, 이에 대한 제도적 보완이 필요하다.

A Study on the Establishment of Priority for IT Project Management Using AHP (AHP 기법을 이용한 IT 프로젝트 관리 우선순위 수립에 대한 연구)

  • Kyung, Tae-Won;Kim, Sang-Kuk
    • Information Systems Review
    • /
    • v.9 no.3
    • /
    • pp.157-181
    • /
    • 2007
  • Main concerns of IT project managements are concentrated on the output control and process management. IT project, however, is difficult to measure the quality of achievement, because it produces invisible and intangible outputs. Many studies have been carried on to quantify the intangible aspects of process management. However, most of them have been focused on the technological aspects. This study measures the priority of factors to manage IT project by applying the IT-BSC and PMBOK method. Established indexes include the factors of managerial, social and future-oriented perspectives to check the different aspects of project management over the technical factors. This study uses AHP method for quantitative measurement. This study can be meaningful because of following reasons. First, this study re-arranges IT project management evaluation indexes by balanced scorecard. Second, this model includes human factors of developers and users who are directly related to the project development and operation. Third, important items of each stakeholder have been separated, and the weights of each item have been quantified to have fixed values.