• Title/Summary/Keyword: 공정운영체계 모델

Search Result 17, Processing Time 0.023 seconds

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

Development framework of application software for chemical process plants (화학 공정 플랜트 정보 응용 소프트웨어 개발 프레임워크)

  • Suh, Min-ho;Yoo, Jaeyoung;Han, Seung-youp
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.490-494
    • /
    • 2007
  • The chemical process plant information is used and updated during design, construction, operation, and maintenance of plant. This special type of information should be utilized as the DW(datawarehouse) which conforms to the standard format. The DW should be design in consideration of connectivity to application softwares. The application softwares are different from each other in the context of their objects such as design, management, decision-making, and so on. In this paper, some considerable facts in dealing with chemical process plant information on the framework of developing application software including datawarehousing, model building, interfacing. As a case study, the development of decision-making support system for environmental policy is illustrated for the related discussion.

  • PDF

A Study on NOS Model System for The Construction Work Planing and Management (건설 시공 계획 및 관리 업무의 적용을 위한 NOS 모델 구축 연구)

  • Choi, Jaejin;Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.10-18
    • /
    • 2016
  • This study presented a new NOS model through the following suggestions to apply the construction work planing and management to NOS(Network Operating System). First, This study presented CIMS(construction information classification system) reflected the characteristics of facility classification - functional component classification - functional component classification - work classification - resource classification. Based on this system. this study presented how to establish PMMB(performance measurement management baseline) with proposed master target equation which analyzed the trend of performance measurement management baseline and proposed work target equation which analyzed the execution results. Finally, this study presented NOS model that can be applied to fixed price method and cost plus fee method through the theoretical verification of executive performance analysis method.

스마트팩토리와 사이버물리시스템 기술

  • No, Sang-Do
    • Information and Communications Magazine
    • /
    • v.33 no.11
    • /
    • pp.3-7
    • /
    • 2016
  • 본고에서는 스마트제조 기술의 일반 소개와 함께 핵심 기술 중 하나인 사이버물리시스템(Cyber Physical System, CPS)기술에 대해 알아본다. 스마트팩토리 CPPS(Cyber Physical Production System)는 IIoT기반으로 제조 현장 빅데이터를 수집하고, 이를 데이터 애널리틱스를 통해 실시간으로 분석, 현장과 동기화된 사이버모델을 구성, 활용하여 제조시스템의 효율적인 설계, 운영을 수행하는 체계이며, 이를 통해 주문 변경, 공정 이상, 설비 고장 등의 상황 변경에 자율적으로 인지, 판단, 대응할 수 있다.

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

A Study on Process Integrated Innovation System for a LNG Industry (LNG 산업의 프로세스 통합 정보망 시스템에 관한 연구)

  • Kim Chung Kyun
    • Journal of the Korean Institute of Gas
    • /
    • v.6 no.1 s.17
    • /
    • pp.59-65
    • /
    • 2002
  • This paper presents new IT model, PIIS that integrates the safety control, construction, and operation managements in a conventional gas industry The systemic approach based on the PIIS model may reduce or increase the parameters as maximizing the safety, risk and crisis management, and increasing the cost-effective productivity The rapid synchronization and integration of the process using the PIIS model may produce more profits and satisfactions between customer and gas supplier. Thus, the PIIS model should quickly be introduced to gas industry at the beginning stage of engineering design and construction processes for maximizing production, effectiveness, and safety of the system from the exploration of a natural gas to a final consumption.

  • PDF

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

Development of Assessment Evaluation Check Sheet to Identify Problems in SME Field and to Develop Creative Improvement Plan (중소기업 현장 문제점 발굴과 개선방안을 모색을 위한 평가진단 체크시트 개발)

  • Lee, Deok Soo;Park, Roh Gook
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.22 no.6
    • /
    • pp.95-105
    • /
    • 2017
  • The Purpose of This Study is to Develop a Checklist Model of Evaluation Diagnosis to Increase the Competitiveness of SMEs in Local Governments. The Evaluation Diagnostic Check Sheet Development Procedure Proceeded in the Order of Preliminary Investigation (Major Company Survey, Analysis of Characteristics of the Industry, Selection of Core Functions, etc.), Research and Development (Development of Core Function Check Sheet, Development of Core Function Improvement Tools). The Evaluation Model is divided into Five Categories (Vision and Strategy System, Quality Assurance and Product Safety, Field Management Level, Statistical Process Control, Improvement Activities), and 1) Recognition, 2) System, 3) Operation, 4) Review and Supplement. This Evaluation Model is expected to Contribute to the Selection of the Mainstream SMEs among the Companies Scattered within the Local Autonomous Entities, thereby Enhancing the Competitiveness of SMEs.

A Simulation Study on the Overhaul Repair Shop of Weapon System (전면정비방식의 무기체계 정비공장에 대한 시뮬레이션 연구)

  • Shin, Kyeong-Wook;Lee, Geun-Hyu;Moon, Dug-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.20 no.3
    • /
    • pp.119-127
    • /
    • 2011
  • Overhaul and repair service means the sequential processes of disassembly, repair and reassembly for a product which has been used for a long time. Overhaul is required for the companies producing airplanes, ships, trains, military weapons and heavy industrial equipments which are very expensive and have a long life cycle. The most important performance measure of the overhaul repair shop is usually the lead time. Thus, how to design the manufacturing system to meet the delivery date is a major concern in overhaul repair shop. This paper introduces the case study of an overhaul repair shop producing military weapon systems with the 3D simulation tool, $QUEST^{TM}$. At first, the characteristics of overhaul shop and what should be considered for simulation modeling are explained. Then, various simulation scenarios including two types of disassembly systems, one is flow line system and the other is cell system, are discussed with the results of simulation experiments.