A Study on Improving Pricing Criteria for Post-Construction Evaluation (건설공사 사후평가 용역대가기준 개선방안)

  • Kim, Seok;Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.8
    • /
    • pp.661-670
    • /
    • 2016
  • In 2000, post-construction evaluation was introduced for the purposes to evaluate demand, cost, and construction period of public construction projects and to reduce errors of public order agencies. However, pricing guide of post-construction evaluation has not been established, which becomes a cause of quality degradation of post-construction service and conflict occurrence. This study suggests the pricing guide in the form of percentage of construction cost method and cost plus fee method based on data of post-construction evaluation. This study investigates the construction costs and service costs for post-construction evaluation and conducts the comparative analysis of 'percentage of construction cost method' and 'cost plus fee method.' The analysis result shows 'cost plus fee method' is more accuracy than 'percentage of construction cost method.' In particular, cost plus fee method includes various correction coefficients, such as distance, area, and integration, in order to reflect the project characteristics of each infrastructure, and suggests linear construction (roads, railways), nonlinear construction I (housing and industry complex), and nonlinear construction II (airports, seaports, dams, water and sewage).

For Accuracy Improvement of High-tech Factory Construction Costs Predictions, Derivation of Correction Factors by Factory Capacity (하이테크 공장 건설 사업비 예측 정확도 향상을 위한 공장 생산량 기반 세부 공사별 보정계수 도출)

  • Choi, Seong Hoon;Kim, Jinchul;Oh, Jae Young;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.11
    • /
    • pp.203-212
    • /
    • 2021
  • The high-tech industry, a highly knowledge-intensive industry based on advanced technologies such as electronics, new materials, and IT, is developing rapidly centering on the semiconductor, display, and battery fields. The market size of this industry is continuously increasing, and various challenges are coming forward due to various factors such as changes in the market, changes in demand, and the requirements of the clients. Many strategies are being implemented to advance the start-up time of factories, such as fast-track construction and basic line construction. Therefore, construction of high-tech factory is required to respond to various types of construction plans and early decision making, and an accurate and reliable method of calculating construction costs is needed. In this study the existing construction type was classified into the overall line configuration considering the total production of the factory, and a basic line configuration for quick production start-up. The correction ratio/value for each detailed construction required to calculate the construction cost of the basic line configuration type was derived. Finally, reliability and accuracy were verified by applying the correction ratio suggested in this study to a new high-tech factory construction project.

A Compensation Method and Comparative Analysis of Historical Unit Price Considering Work Types for Large and Small-Scale Projects (공종별 특성을 고려한 대·소규모 공사의 실적공사비 비교 및 보정방안)

  • Hong, Sung Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.293-303
    • /
    • 2014
  • Recent historical unit price is presented by the Korea Institute of Construction Technology (KICT) and it is analyzed by data from large-scale projects. Therefore it has problem applying to small-scale projects. To indicate the problem, the study compared historical unit price of large-case project and small-case project in the case of civil engineering work, building construction, and mechanical facility work. As a result, average historical unit price of small-scale project was 26.6% higher than large-scale project. On the other hand, difference on the labor cost was 18.4%, difference on material cost and overheads were 8.18%. Moreover, the study proposed compensation method to correct to apply recent historical unit price to small-scale project.

A Study of the Application for Proper Construction Cost Estimating Method based on the Actual Cost Data (실적자료에 의한 적정 건축공사비 산정 방법에 관한 사례연구)

  • Cho Jae-Ho;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-386
    • /
    • 2001
  • The ability to make good cost overruns predictions is a very important aspect of in major construction project. The probabilistic cost models can provide more reliable than traditional cost models which have been used in korea to prepare Bill of Quantities, if the actual cost data are sufficient enough to analyze the trends of the variables. The paper considers non-deterministic methods in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The objectives of this research is to develop a method to forecast the probabilistic total construction cost and the elemental work cost

  • PDF

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

A Study on Development of Cost Index Model for Military Facilities Construction (군 시설공사의 공사비지수 개발에 관한 연구)

  • Park Jong-Won;Son Bo-Sik;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.256-260
    • /
    • 2004
  • As a large portion of defence budget are alloted for military facility construction, reasonable budget estimation in the planning stage has been officers' main concerns. However the proper estimation of construction cost is difficult to be carried out due to the absence of systematic criteria. To improve the budget estimation for military facility construction, this study proposes a cost index model which can convert historical cost to current cost. Thus the developed cost index would enhance effectiveness of budget estimation process 3nd support reasonable decision making. This cost index model is developed by analyzing historical cost data with statistical methodology The study is executed by following process. First, factors which affect construction cost for the most are selected by analyzing historical cost data. second, the selected factors are categorized material cost, labor cost and equipment cost, and weights of those factors are calculated by dividing the cost of each factor by total item costs. Last, cost index is developed by using weighted average method.

  • PDF

Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index (건설공사비지수의 산정을 위한 수량기반 기준시점 가격지수의 개발)

  • Park, Sung-Chul;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.77-84
    • /
    • 2006
  • Indexes have played an important role as a economic indicator or performance indicator in many industries for a long time. In construction industry, indexes, or Construction Cost Index(CCI), have been used to compensate for the gap of time in Estimate Using the Historical Cost Data from Feb. 2004. CCI is composed of index formula and resources. Existing literatures had used Laspyeres Index as a index formula. And, Leontief table, the bills of quantities, and information of price surveyor were used as a resource. When applying Laspyeres formula and the resources to calculating the CCI, the problems such as double application of price fluctuation, calculating the incorrect weights, may be generated. This paper analyzed the existing economic relevant indexes as well as Laspyeres formula. Thus, feasibility of them was analyzed using three practical cases of apartments. And then, Quantity based Base Period Price Index(QBPPI) was developed to consider the characteristics of construction more accurately.

Development of Electrical Construction Cost Index Applied Chain-Weighted Method (연쇄방식 전기공사비지수 개발에 관한 연구)

  • Park, Houng-Hee;Choi, Seung-Dong;Hyun, So-Young;Park, Min-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.49-60
    • /
    • 2014
  • Electrical construction cost index has been applied fixed-weighted method. But fixed-weighted method can't faithfully reflect industrial structure changes. Because the weighted value and price index of fixed-weighted method is fixed on the basic period. Electrical construction cost index is composed of the cost of labor and material. So it fluctuates sharply whenever the construction association of korea announces the laborer's wage of electrical construction. And it depends on only the producer price index changes that is related to electrical construction since then. So a study is focused on developing electrical construction cost index applied chain-weighted method. Because chain-weighted method can reflect the realities of the electrical construction and alleviate the sudden changes of labor cost with link index. We verify that chain-weighted method relieves the step states of electrical construction cost index applied fixed-weighted method.

Development of Underwater Positioning System using Asynchronous Sensors Fusion for Underwater Construction Structures (비동기식 센서 융합을 이용한 수중 구조물 부착형 수중 위치 인식 시스템 개발)

  • Oh, Ji-Youn;Shin, Changjoo;Baek, Seungjae;Jang, In Sung;Jeong, Sang Ki;Seo, Jungmin;Lee, Hwajun;Choi, Jae Ho;Won, Sung Gyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.3
    • /
    • pp.352-361
    • /
    • 2021
  • An underwater positioning method that can be applied to structures for underwater construction is being developed at the Korea Institute of Ocean Science and Technology. The method uses an extended Kalman filter (EKF) based on an inertial navigation system for precise and continuous position estimation. The observation matrix was configured to be variable in order to apply asynchronous measured sensor data in the correction step of the EKF. A Doppler velocity logger (DVL) can acquire signals only when attached to the bottom of an underwater structure, and it is difficult to install and recover. Therefore, a complex sensor device for underwater structure attachment was developed without a DVL in consideration of an underwater construction environment, installation location, system operation convenience, etc.. Its performance was verified through a water tank test. The results are the measured underwater position using an ultra-short baseline, the estimated position using only a position vector, and the estimated position using position/velocity vectors. The results were compared and evaluated using the circular error probability (CEP). As a result, the CEP of the USBL alone was 0.02 m, the CEP of the position estimation with only the position vector corrected was 3.76 m, and the CEP of the position estimation with the position and velocity vectors corrected was 0.06 m. Through this research, it was confirmed that stable underwater positioning can be carried out using asynchronous sensors without a DVL.

A Study on Efficient Deconstruction of Supporters with Response Ratio (응답비를 고려한 효율적인 버팀보 해체방안에 관한연구)

  • Choi, Jung-Youl;Park, Sang-Wook;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.5
    • /
    • pp.469-475
    • /
    • 2022
  • As the recent structure construction is constructed as a large-scale and deep underground excavation in close proximity to the building, the installation of retaining wall and supporters (Struts) has become complicated, and the number of supporters to avoid interference of the structural slab has increased. This construction process becomes a factor that causes an increase in construction joints of a structure, leakage and an increase in wall cracks. In addition, this reduced the durability and workability of the structure and led to an increase in the construction period. This study planned to dismantle the two struts simultaneously as a plan to reduce the construction joints, and corrected the earth pressure by assuming the reaction force value by the initial earth pressure and the measured data as the response ratio. After recalculating the corrected earth pressure through the iterative trial method, it was verified by numerical analysis that simultaneous disassembly of the two struts was possible. As a result of numerical analysis applying the final corrected earth pressure, the measured value for the design reaction force was found to be up to 197%. It was analyzed that this was due to the effect of grouting on the ground and some underestimation of the ground characteristics during design. Based on the result of calculating the corrected earth pressure in consideration of the response ratio performed in this study, it was proved analytically that the improvement of the brace dismantling process is possible. In addition, it was considered that the overall construction period could be shortened by reducing cracks due to leakage and improving workability by reducing construction joints. However, to apply the proposed method of this study, it is judged that sufficient estimations are necessary as there are differences in ground conditions, temporary facilities, and reinforcement methods for each site.